What conditions do you need to install charging piles in the community?
1, the charging pile operation needs a large number of electric vehicles, and the charging utilization rate of the community reaches a certain level. If the utilization rate is not high, the possibility of installation is very small. If there are cars and few electric cars in this community, it means that the demand for charging is not great and the utilization rate will certainly not be high. What is needed to operate charging piles is utilization rate. If you encounter such a community, it is recommended to consider it carefully, or you can install a part less, and then gradually increase it after the utilization rate is improved.
2. The community meets the requirements of charging facilities, and all management conditions are in place. When installing the charging pile, it is necessary to confirm the charging conditions or whether the installation conditions are available. This is the most basic. If installation is not allowed, nothing else needs to be considered.
3. In addition, there must be a power of attorney issued by the property agreeing to install charging equipment and a certificate of use of fixed parking spaces. If the charging pile is to be installed, it must be approved by the property. This mainly depends on the communication between the owner himself and the property. If the property agrees and meets the installation conditions, apply to the power supply station where the community is located.
Basic process of applying for installing charging piles:
Step 1: Property communication
The purpose is to obtain the relevant certificates issued by the property for agreeing to build charging piles (required for power installation). Generally, you need a fixed parking space with your own property rights. If there is no fixed parking space, the property needs to agree to install charging piles in leased parking spaces or public parking spaces.
There may be some difficulties in property communication. Some properties will be refused or delayed for various reasons such as safety, fire protection, neighborhood relations, parking space occupation and insufficient power load. It is necessary to prepare countermeasures in advance, and let equipment vendors or installation service providers provide necessary assistance.
Step 2: Installation site investigation
After the installation location is determined, contact the installation service provider (optional or provided by the car dealer) to inspect the installation conditions on the spot, formulate the installation plan according to the site, and give a quotation.
Step 3: Power Report and Installation
Car purchase certificate (required in some areas), property consent certificate, parking space use certificate (parking space property certificate, parking space lease certificate), ID card and other related materials, and submit them to the local power supply department for cable installation, or submit them through mobile phone APP (such as State Grid).
Step 4: Install the charging pile
After the above process is completed, the installation work can be implemented.
- Related articles
- How many counties are there in Changde City, Hunan Province (which counties are there in Changde City, Hunan Province)
- How is Nanchang Cao Fang School?
- What about Changde Tongxin Property Co., Ltd.?
- How about CNOOC selling Shenzhen Co., Ltd.
- Can Shuangfei enter China Shipping Property?
- Can you see the identity information in the background of the real-name authentication attribute of Nfc access card?
- How to calculate the property fee if you don't move in?
- What's the telephone number of the new height marketing center in Wang Hu, Binzhou?
- How much is the light of the Wulin in Hangzhou?
- What about Shandong Luneng Wanchuang Real Estate Co., Ltd.?