Job Recruitment Website - Property management - How much do you charge for the renovation of water and electricity at home? What are the main work contents of hydropower transformation?

How much do you charge for the renovation of water and electricity at home? What are the main work contents of hydropower transformation?

Today, let's take a look at how the water and electricity decoration of family decoration is generally charged, mainly including labor costs, slotting fees, strong and weak electricity charges and so on. In addition, the main work content of hydropower transformation has also been arranged, and it is always beneficial for the owner to know more before the transformation.

How to charge for home decoration, water and electricity decoration?

Generally speaking, hydropower mainly includes high-voltage installation part, weak-current installation part and waterway reconstruction part. Waterways are divided into slotted and non-slotted prices, or according to load-bearing walls. Circuit transformation is mainly the cost of some materials, such as various network cables, video cables and daily use wires.

1, labor cost

Labor costs are generally calculated on a daily basis, and there are differences in labor costs in different regions. Judging from the current market, the labor cost of water and electricity installation is about 200-300 yuan. Experienced decoration masters charge higher fees, but the quality of water and electricity decoration is also better.

2. Access fee

Generally speaking, it is suggested that the water supply pipe should be slotted, and the contractor should charge by meter, with concealed pipe per meter 18 yuan and exposed pipe 15 yuan. The contractor charges 33 yuan per meter for Jinniu pipe, and the general slotting fee is about 13 yuan/meter.

3. High voltage charging

The main materials for high-pressure decoration are: PVC wires, thick cold-bent pipes, wires, junction boxes, etc. The number of threads in the flame retardant pipe is three. If there are more than three lines, it needs to be calculated according to the length, 5- 10 yuan/meter. The price of dismounting bottom box of switch is 5- 15 yuan/piece, the price of exposed tube is 40-60 yuan/meter, and the price of concealed tube is 50-70 yuan/meter.

4. Weak electricity cost

The materials for weak current decoration mainly include: PVC pipes, thick cold-bent pipes and wires. The price of switch socket base is about 10 yuan/unit. The surface installation price of weak current pipeline is 20-40 yuan/m, and the concealed pipeline is 30-50 yuan/m. ..

5. Waterway charges

The main materials for waterway decoration are: upper and lower water pipes, elbows, hot water pipes, equal-diameter and different-diameter sleeves. Installation price of upper and lower water pipes is 50-70 yuan/meter. If the length of the water pipe exceeds the agreed length, an extra charge of 65,438+00 yuan will be charged per meter. If it is necessary to punch holes in the wall, each hole of the load-bearing wall is 30-50 yuan, and the price of the non-load-bearing wall is about 20-40 yuan.

What are the main work contents of hydropower transformation?

The main work of hydropower transformation includes hydropower positioning, slotting, pipe burying and threading.

1, the first step of hydropower transformation is hydropower positioning, that is, the position of switch socket and waterway interface in the whole house is determined according to the needs of users, and the plumber should explain the line direction to users according to the positions of switch, socket and faucet.

2. After hydropower positioning, the next step is slotting. Note that before slotting, be sure to ask the plumber to mark all the hydropower trends on the wall, and remember to compare them with the hydropower map to see if they are consistent.

3, waterway reconstruction, pay attention to the surrounding must be clean and tidy. When signing a waterway reconstruction contract, it is best to indicate the materials used for waterway reconstruction. In addition, attention should be paid to the size of the sewer pipe in the original room during waterway reconstruction, and the pipe connected with the sewer pipe should preferably match the original sewer pipe.

4. In the circuit transformation, we should pay attention to where the lamps and appliances in the whole house are installed in advance to determine the position of the switch socket. At the same time, it should be noted that the price of new buried wires is different from that of replacement wires. You'd better buy a wireless doorbell.

Tips:

1. When planning hydropower, it is recommended to find a knowledgeable friend to have a look. Just like taxi drivers will detour, many unscrupulous businessmen will make water and electricity "detour" and charge more.

2, after the hydropower construction, pay attention to the acceptance, check the quality of the project, whether it is consistent with the pre-designed drawings.

3. Check whether all sockets have electricity, whether network cables and telephone lines can be connected, and whether water pipes are unblocked.

4. All sockets should be planned according to the size of furniture to avoid being blocked by furniture!