Job Recruitment Website - Property management - How much does it cost to decorate the house? How to save money by decorating a house?
How much does it cost to decorate the house? How to save money by decorating a house?
The life pressure of modern people is very great, and the house decoration hopes to be beautiful and affordable. So how much does it cost to decorate the house? How to save money by decorating a house? What should I pay attention to when decorating a house? The following small series will answer for everyone!
How much does it cost to decorate the house?
The basis of home improvement budget
Floor: 30-70 yuan /m2 at the low end, 80-11m2 at the middle end, and more than 200 at the high end.
Living room tiles: low end 20-80/m2, middle end 80- 150/m2, high end 160-280/m2.
Balcony brick: generally, 20-200 30 yuan is enough, while anticorrosive wood is more expensive, which seems to cost 100-200/ square.
Kitchen and bathroom wall tiles: low grade 10-40 yuan, middle grade 40- 100 yuan, high grade 100-300 yuan.
Jiazhuang budget zhi kitchen
Kitchen cabinets: generally in 2000-8000 yuan, high-end tens of thousands or even hundreds of thousands.
Range hood: Chinese style is the cheapest, around 2000.
Water heater: according to the function, brand, capacity and price, there is a great difference.
Kitchen hardware: including all kinds of blue, pendants, etc. , generally 300-2000 yuan.
Bathroom decoration budget
Toilet: low-grade 200-600 yuan, middle-grade 700-2000 yuan, high-grade 2000-5000 yuan, good tens of thousands.
Squat tank: low end 100-300 yuan, middle end 300-600 yuan, high end 600- 1000 yuan.
Bathtub (barrel): acrylic skirt 400- 1500 yuan, steel plate or American cast skirt 800-2000 yuan, cast iron 1500-4500 yuan, acrylic skirt 600-2000 yuan, without hardware, 1200-3500 yuan. Massage 3000- 10000 yuan. Barrel 1000-2500 yuan.
Self-made glass or wall semi-partition or shower curtain: the general cost is 200-500.
Wash basin: 500-4000 yuan per set.
Toilet pendant: General 200-800 yuan without mirror.
Faucet: 60—300 yuan/piece.
Sink faucet: 200- 1000 yuan/piece.
Home improvement budget category
Original wooden door: 3000- 10000 yuan/fan
Solid wood door: 1000—2000/ fan
Process door and die pressing door: 450—800 yuan/fan.
Solid wood composite door: 700- 1000 yuan/fan
Glass door cabinet: 600-800 yuan, ordinary plastic steel 200 yuan, aluminum alloy 400 yuan,
Hardware (door locks, hinges, door suction): low-grade 25-50 yuan, medium-grade 60- 150 yuan, high-grade 150-500 yuan.
Decoration budget ceiling system
Plastic steel plate: 30—70 yuan/square.
Aluminum gusset plate: 50- 150 yuan/square.
Moisture-proof gypsum board: 35—60 yuan/m2.
Installation fee and internal angle: 300- 1000 yuan.
Decoration budget hydropower
Water pipe: 30-60 yuan/meter.
Electric wire: 20—50 yuan/m.
Weak current installation: 8 yuan/meter, others are concealed with weak current.
High-voltage surface mounting: 2.5m25 yuan /m, others are the same as low-voltage concealed mounting.
Water meter: specification15,20, price 30 yuan/main valve: specification 25, price 30 yuan/valve.
Flushing valve: specification15,20, price 20 yuan/drain pipe: specification below 40, price 12 yuan/meter.
Fluorescent tubes: specifications 20W, 30W, 40W, price 20 yuan/root excluding wiring.
Ceiling grid lamp: specification 40W- 120W, price 40 yuan/set excluding wiring.
Decoration budget wallpaper
Low grade 10-20 yuan/square, middle grade 20-80 yuan/square and high grade 80-300 yuan/square.
Decoration budget wardrobe
Non-solid wood: complete cabinet doors 350-750 yuan/square, customized cabinet doors 450-900 yuan/square.
Solid wood: complete door 400- 1000 yuan/square, customized door 700- 1200 yuan/square.
How to save money by decorating a house
Base treatment of wall top surface
Tip: If your basic level is quite good, this part of the money can be saved. This part is invisible in the decoration quotation. Under normal circumstances, it will be indicated in the wall paint or wall matrix repair that the wall leveling repair is calculated according to the actual amount. But for general electronic slotting or internal wall insulation, it is necessary to carry out overall construction.
Generally speaking, the process is:
Mix gypsum powder and white latex into paste, fill the grooves, grooves and seams on the top wall, and roll the interface agent (wall cement);
The process seams reserved for the ceiling and background wall are made into paste with white latex mixed with gypsum powder, pasted with special sewing tape and brushed with anti-rust paint nail holes.
The top surface of the wall should be leveled with putty and polished with sandpaper.
Tip: The general technological requirements are that putty (taking Yao Xiaojindou as an example) is scraped twice and polished twice with a 200W bulb. The main materials used are putty, sandpaper, sandpaper holder, spatula, brush, roller, mixer, light bulb, etc. The material cost and labor cost of this part are basically the same. Calculation method of its area-building area *2.65= area of actual engineering quantity. If the old powder glue on the top surface of the original wall is eradicated, the labor cost per square meter needs to be increased.
Brush latex paint on the top surface of the wall.
Tip: Hand-brushed latex paint (take Nippon Meideli as an example) can generally be brushed twice, and the materials used are mainly latex paint, brushes, rollers, paper tapes, etc. In general, the material cost of this part is higher than the labor cost. Its area is calculated as above.
If the white latex paint is required to be mixed into multiple colors, it will increase the material cost and labor cost per square meter.
Buy 800*800 floor tiles (about 60- 120 yuan per square meter).
Tip: At present, there are three specifications of floor tiles pasted in guest rooms, restaurants, corridors, balconies, bedrooms and study rooms, namely 600*600, 800*800 and 1000* 1000, among which 800*800 is widely used. Because the tile will be damaged by cutting bricks, don't forget to add 3%-5% loss according to the calculated area when buying.
Simple method for selecting ceramic tiles: take one piece out of the box at will to see whether the surface is smooth and complete, and the glaze surface should be uniform, bright, without spots, lacking glaze and bumping, and the surrounding edges should be regular. Gloss, astringency, or bubbles in glaze are all quality problems. Take out another brick and align the two pieces. The smaller the gap in the middle, the better. If it is a pattern brick, it must be made up of four pieces into a complete pattern, and it is also necessary to look at whether the pattern of the brick is coherent and clear. Put these bricks on one by one and compare their sizes. The allowable deviation of small brick is ±65438±0mm, and that of large brick is 2 mm..
Buy kitchen and bathroom tiles (about 30 per square meter-take mid-range tiles in 60 yuan as an example)
Tip: At present, there are two specifications of floor tiles pasted in kitchens and bathrooms: 300*300 and 500*500, of which 300*300 is widely used. There are three main specifications of pasted wall tiles: 200*300, 300*450 and 300*600, among which 300*450 is widely used. Because more bricks need to be cut when pasting kitchen and bathroom walls and tiles, the damage is more serious, so don't forget to add 5%-7% loss according to the calculated area when buying.
Paste wall tiles and floor tiles
Tip: The general process requirements are-
1. Clean up the residual mortar, dust, etc. And clean it;
2. Remove the plain cement surface;
3. When bouncing lines, pop up mutually perpendicular positioning lines with the center of the room as the origin.
4. Before the shop is stuck, pull the reticle to the azimuth. When pasting, the bearing must be connected, and staggered joints are not allowed. The joint width of floor tile is 1, which shall not exceed 2;
5. When pasting, it must be firm, and there must be no defects such as skew, missing corners and cracks. Empty drum control in 5%, a single empty drum area does not exceed 8%;
6. Wall tile paste Angle of Yin and Yang must use a square to check into 90 degrees, brick paste Angle must be 45 degrees touch, touch Angle closely, gap penetration;
7. After paving and curing for 2 hours, jointing with jointing agent and wiping the surface of ceramic tile; The materials used are mainly cement, machine-made sand, building glue, towels, cleaning balls, toothpicks, spirit level, thin threads, steel nails and other accessories; Because bricklayers are very popular now, the labor cost of this part is higher than the material cost.
Special reminder to students: At present, most decoration companies and construction teams in this project are operating at a loss. In order to make up for this loss, most of them are marked in the budget-labor costs for cement and sand. Other processes are charged separately: the cushion with a thickness less than 3.5cm, and the excess part is calculated as cement mortar leveling layer; White cement jointing, such as jointing with "special joint filler for ceramic tiles", shall be calculated separately; Antique brick and special-shaped brick are calculated separately.
Install reinforced imitation solid wood flooring (60- 120 yuan per square meter, taking mid-range flooring as an example).
Tip:
1. thickness 1.2 cm. Including moisture-proof mat, skirting line and manual installation fee;
2. If you want to level, you can use cement mortar to level, and add about 26-30 yuan per square meter (thickness 3cm). 3. The reported loss rate of floor tiles is slightly higher than that of floor tiles, generally around 10%.
Kitchen and bathroom hung ceiling
Tip: The main materials used are light steel keel, clip bone, suspension spring, expansion wire, aluminum gusset plate, angle wire, all-purpose adhesive and sealant. Generally speaking, the material and labor cost of this part is 3:1; However, the loss of pinch plate is serious, and the loss rate is about 15%.
Special reminder to students: As far as I know, the quotations of merchants in the building materials market are relatively low, and the so-called contracted materials do not include all materials. After receiving your money, you have to increase the cost of corner line, all-purpose glue, sealant and so on.
Suite doors (take mid-range composite solid wood door as an example, each set is 900- 1200 yuan).
Tip: It is suggested to make door covers on site, customize semi-finished composite solid wood modeling doors and paint them with varnish. This kind of door is durable and easy to repair. Door locks, thickened hinges and door suction can be purchased by themselves for decoration workers to install.
If you choose finished painted solid wood composite doors, it is recommended that you buy hardware yourself. But the biggest disadvantage of this kind of door is that it can't be repaired after being damaged.
In addition, if it is not because of financial problems, it is recommended not to use paint-free doors, which are not very strong.
Toilet door
Tip: It is recommended to use titanium-magnesium alloy transverse door, which can play a very good waterproof performance, and the accessories are the same as others. Customize or entrust a decoration company.
Kitchen and bathroom equipment (according to your hobbies and economic situation, you'd better buy it yourself)
Tip: The kitchen-including cabinets, hanging cabinets, faucets, sinks, baskets and cupboards-is your choice. Toilet-including toilet, washbasin, shower head, faucet, mirror, paper box, soap box, towel rack, tray, floor drain and yuba.
Toilet floor waterproofing
Tip: the wall should be 160- 180 cm.
Waterway reconstruction
Tip: PP-R pipe, with a diameter of 20mm and a wall thickness of 3.4mm (35-45 yuan per meter for a single pipe), includes nuts, straight pipes, bridges, elbows, tees and sealing belts; Internal elbow, internal tee, internal straight-through and on-off valve are all charged separately; Most of this project is carried out according to the different requirements and actual needs of the owners. After the acceptance of the project, face-to-face measurement shall be made with the owner, and the project payment shall be settled according to the actual engineering quantity.
Circuit modification
Note: In general, the working current of the switch is 10A. 15A socket is selected for air conditioners above/0.5, and 10A socket is selected for air conditioners below10.5. The installation height shall be no less than 2.2m Rated current of leakage switch of socket circuit 16A-20A, lighting circuit breaker 10A- 16A, air conditioning circuit 16A-25A, and main switch leakage type 32A-40A. Switch off the ground 1m, socket off the ground 30-50 mm.
Now in Zhengzhou, the wires of Zhengzhou No.3 Factory are generally selected-2.5m insulated single-stranded plastic copper wire for lighting and socket wires, and 4m plastic copper wire for air conditioning wires; All walls, floors, top surfaces, ceilings and plastering lines should wear PVC rigid pipes; Open wire is not slotted, and dark wire is slotted; Most of this project is carried out according to the different requirements and actual needs of the owners. After the acceptance of the project, face-to-face measurement shall be made with the owner, and the project payment shall be settled according to the actual engineering quantity.
Garbage removal
Tip: This question has been mentioned by many people. The property management companies in the community have collected this fee. Why do they have to pay the garbage collection fee? Let me explain to the students here: the garbage clearing fee charged by the property is the cost of transporting it out of the community from the garbage point, and the garbage clearing fee charged by the construction party is responsible for transporting it from the owner's home to the garbage dump designated by the community property. If it can be put outside the door and the owner is responsible for cleaning it, then there is no charge. The decoration company or construction team must remove the decoration garbage, which is charged. It is very troublesome for the owner to find a car and so on. It is suggested that the decoration company or construction team remove the decoration garbage.
Material handling fee
Tip: Many people also have different views on this issue and think it should not be accepted. But I don't know if you ever thought about it. The decoration company must pay the transportation fee and moving fee for the purchased materials. Where does this cost come from? I'm sure the owner will have to pay the bill!
A few words of advice:
Because the price has a great relationship with the fluctuation of the market, the price will be different in different regions. If you find a qualified decoration company, it will be higher than this price. You can use the above as the basis of decoration price, and the price will fluctuate according to different regional time. At the same time, I suggest you go around more, but don't compare prices too much. There are 10,000 ways for decoration companies to reduce prices, but it is more troublesome for owners.
So I suggest you know what you are doing, don't blindly bargain with the decoration company (even lower the price below the direct cost), and leave a certain profit margin for the decoration company. Otherwise, it is oneself who will suffer in the end. Remember the most loyal sentence-no one will do business at a loss.
Four ways to save money:
1. Careful planning and perfect design are the first steps to save money. When you have a new house, how to plan begins. What are the main points of decoration? How to decorate? How to invest? Design beauty with the least cost. Whether it's your planning or asking a professional company to design it carefully for you, saving money is very important. A complete and unified design can minimize waste. If there is no design or only a simple design, it is difficult to save money while doing it.
2. Use the method of "making the finishing point". For key decoration places, you can choose high-grade materials and fine workmanship; Other parts are decorated in a simple and lively way, with materials in Mandarin and simple workmanship.
3. Relying on decoration companies and construction teams is also the best shortcut to save money. Because they have fixed outlets in material selection, the material price is excellent; Rich construction experience and fine workmanship; There are supporting services and guaranteed quality. Therefore, it is best not to directly ask workers for construction. On the surface, it seems to save money, but in fact, it may cause greater economic losses because of your wrong choice. Because the decoration of the house is a systematic project, it not only needs the close cooperation of the upper and lower processes, but also needs the interspersed construction of various types of work, and at the same time, it also needs strong organization and coordination, rigorous and thorough deployment. Once there is a problem in any link, it is difficult to clarify the responsibility and make up for it in time. Because of this, there are often many quality hidden dangers. Even though a series of remedial measures have been taken by all means, there are still unsatisfactory regrets. Even in the end, the cost is often much higher than the decoration budget of the previous decoration company and construction team.
4. Follow the rules and close the budget. In the process of construction, it is inevitable to make changes and modifications, and the process records should be made with reference to the original project list, so as to clean up the increase or decrease items in the final accounts.
Matters needing attention in decorating the house
Matters needing attention in kitchen decoration
1, kitchen lamps
The lamps in the kitchen should be waterproof, such as anti-fog lamps. The joint of the line should be carefully treated with waterproof insulating tape to avoid water vapor condensation, causing short circuit and fire. Kitchen lighting needs to be divided into two levels: one is the lighting of the whole kitchen, and the other is the lighting of washing, preparation and operation.
2. Carefully select the woodwork in the kitchen.
When a large number of wood products are used in the kitchen, we should pay attention to the improvement of the ventilation system in the kitchen to avoid the long-term accumulation of water vapor on the floor and walls, resulting in cracking, deformation and even decay of wood products.
3. Kitchen curtains
The choice of kitchen curtains should use aluminum alloy painted shutters, and try not to use fabric curtains to avoid being difficult to clean after being contaminated with oil.
4. Kitchen area
The use area of the kitchen should be moderate. If it is too big, it will be wasted. If it is too small, it will be crowded. The reasonable area should generally be around 10 square meter. We must also ensure the natural lighting and reasonable ventilation of the kitchen space. If the kitchen is big enough, you can put a small dining table, which can also be used as a dining room, so there is no need to find another space as a dining room. Carpets can be laid under the dining table to separate the space. If the kitchen area is small, we should pay attention to storage.
5, kitchen ceiling
The top surface and wall surface of the kitchen should be made of fireproof, heat-resistant and easy-to-clean materials, such as glazed tile wall and aluminum ceiling. Waterproof products should be considered for the ceiling of the kitchen, such as waterproof gypsum board, waterproof putty, high-performance waterproof latex paint, etc., which are both beautiful and not inconvenient to use.
6. Kitchen tiles
The selection of wall tiles should consider the illumination of indoor light, and use dull and elegant tiles in too bright and dark spaces to avoid light pollution and visual fatigue. The choice of floor tiles should not only consider the color, but also pay attention to the comfort of use. Non-slip tiles should be selected, and the interface should be small to prevent dirt accumulation and facilitate cleaning. Don't lay the floor with mosaics. In order to avoid slipping and falling, causing physical injury.
7. Kitchen storage
The function of the kitchen determines that it is the most easily "dirty, messy and poor" place in the home environment. How to make the kitchen beautiful and tidy is another important purpose of kitchen decoration besides convenience function. In order to make full use of space, use cabinets, hanging cabinets, etc. Hanging cabinets are generally made into multi-layer grids with a width of 30 to 40 cm. The furniture should be closed as much as possible, and all kinds of electrical appliances should be stored in cabinets in different categories, which is clean and tidy. The low cabinet in the kitchen is best made into a drawer, which is convenient to take and put when pushed and pulled, and has a better view. The gap between the operating tables of the hanging cabinet can be used to put some utensils needed for cooking.
8. Kitchen fume problem
The height of the range hood shall be subject to the user's height, and the distance between the range hood and the cooker in dosing pump shall not exceed 60 cm. Installing the cupboard first and then installing the range hood is the most prone to problems, so it is best to install it at the same time as the cupboard. When buying household appliances such as range hoods, China is more attractive than Europe.
Matters needing attention in bathroom decoration
1. When determining the location of the bathroom floor drain, we must first think about it and measure it well. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point no matter how inclined the brick is.
2. Install lights above the sink and gas stove. The air conditioning sockets in the bathroom are all equipped with special switches. Especially for the electric water heater in the bathroom, it is advisable to use a plug two-stage switch. If you want to turn off the electric heater, it is dangerous to unplug it.
3. If the bathroom floor is higher than the lobby, it can be solved by the transition of the doorstone.
4. The bathroom should be moisture-proof and waterproof.
When you make a bathroom basin cabinet, you should first consider the size of the basin, so as not to put it down in the future.
6. Make rational use of the sink storage space of the bathroom wall. Don't abandon it. Tiling is easy to use and beautiful. Can be used as a storage room.
7. The slope of the toilet floor should be considered before laying bricks. According to the national slope, the effect of rapid drainage cannot be achieved. It is suggested that the slope is slightly higher than the international slope, which is helpful for drainage.
8. The hole before the toilet is installed is so big that the floor drain cover can fall off. If your floor drain has been installed and the toilet is not installed, pay attention to the floor drain cover or put it away for safekeeping.
9. Lessons from installing faucets The water pipes connected to the faucets of bathtubs and showers need to be embedded in the walls. If you can install the faucet first, please install it first. You should buy a faucet first, then install hot and cold water pipes and tile them.
Matters needing attention in hydropower installation
electric installation
1, lamp installation
(1) When the weight of lamps is greater than 3kg, fix them on bolts or embedded hooks;
(2) Cord chandelier, when the lamps and lanterns are important at or below 0.5kg, shall be hoisted by cord itself; For lamps larger than 0.5kg, use a catenary, and weave a flexible cord in the catenary so that the wires are not stressed;
(3) The lamps and lanterns are fixed firmly and reliably, without using wooden wedges. There shall be no less than 2 screws or bolts for fixing each lamp. The rest shall be implemented with reference to Code for Construction and Acceptance of Electrical Lighting Devices in Electrical Equipment Installation Project.
Matters needing attention in house decoration
2, high voltage switch, socket installation
(1) Install the socket horizontally. The right pole of the socket is connected to the phase line, and the left pole is connected to the zero line and the ground line.
(2) Wiring: First, leave the wires thrown out of the box with a maintenance length (15-20CM) and cut off the insulation layer. Be careful not to damage the core. For example, if the switch and socket are terminals, wind the wire clockwise around the corresponding terminals of the switch and socket, and then tighten the pressure head. If the switch and socket are plug-in terminals, turn the wire core back and insert it into the round hole terminal (when the hole allows double wires to be pressed), and then press it with the top wire, paying attention that the wire core shall not be exposed.
(3) The installation height of the socket should comply with the design regulations. When there are no regulations in the design, the following requirements shall be met: the distance between the concealed socket and the ground shall not be less than 0.3m, and the concealed socket in special places shall not be less than 0. 15m. Safety sockets should be used in children's activity places. When using ordinary sockets, the installation height should not be lower than1.8m. ..
(4) Special attention: In order to avoid the interference of AC power supply to TV signals, the distance between TV feeder pipes and sockets and AC power supply pipes and sockets should be more than 0.5m (in special cases, TV signal lines should be shielded cables, and the spacing should not be less than 0.3m).
(5) Waterproof and moisture-proof sockets with good sealing should be adopted in wet places such as toilets and kitchens.
(6) The same model is installed in parallel, and the installation height of the same indoor switch is consistent, and the control is orderly and not bad. The distance between sockets installed in parallel shall not be less than 20mm.
3. The standard wiring mode of weak current twisted pair 568B: 1- white orange, 2- orange, 3- white green, 4- blue, 5- white blue, 6- green, 7- white brown and 8- brown.
Waterway installation
1, the sanitary ware manufacturer is responsible for installing good quality hoses and valves provided by the manufacturer.
2. The toilet should be fixed with expansion screws and cannot be sealed with cement mortar. The base should be flush with the ground and sealed with putty or silica gel.
3, wash your hands (vegetables) basin and sink drain should have a trap, drain pipe and the ground water nozzle should be sealed without leakage. Hydropower transformation is a systematic project, which requires netizens to combine their own understanding of hydropower design, construction and acceptance for reference in the implementation process.
Matters needing attention in decoration of second-hand houses
1. Due to aging, the circuit of the old house needs to be replaced. Because modern household appliances are widely used, the replaced wires need to meet the national standards, and galvanized iron pipes need to be set during construction. When laying wires, shunt arrangement should be made according to the new design scheme (generally divided into lighting, low-level socket, high-level socket and weak current).
2. Galvanized iron pipes and aluminum-plastic pipes are widely used in the waterways of old houses, which can no longer meet the needs of modern life. Waterway galvanized iron pipe is easy to corrode and harmful to human health, which has been banned by the state. Aluminum-plastic pipes are easy to fall off, and water seepage causes hidden dangers in later use. Therefore, PPR pipes are often used now, and experiments need to be suppressed after the construction of new pipes is completed.
3. Safety tip: Wall decoration safety comes first.
Remind consumers, whether it is a new house or an old house, not to change the structure without authorization, especially the load-bearing structural wall and the counterweight wall with balcony doors and windows. If the kitchen and bathroom space of an old house must be demolished, the original non-bearing wall must be waterproof again before laying floor tiles. The height of normal part is 30cm, and the height of shower part is 180cm. After waterproofing, do a 24-hour closed water test to ensure waterproof quality.
4. The acceptance of second-hand housing can not be ignored
Because the second-hand house has lived for a period of time or even more than 5 years to 10 years, whether there are quality problems and whether there are major repairs are all clear issues before renovation. In addition to some invisible hidden projects, some seemingly new parts should also be paid special attention to.
Concealed engineering: check the aging of wires, corrosion of water pipes and illegal buildings in the early stage of the old house;
Walls: For example, newly painted walls or roofs may be used to cover cracks in walls or water seepage in ceilings. In case of similar situations, buyers should pay special attention.
Furniture: it should be to see whether it meets your own needs and whether the old and new situations are changed; Whether the doors and windows are seriously damaged, etc. ; Therefore, it is safer to accept these in the mode of finely decorated houses.
Doors and windows: pay attention to whether the doors and windows are aging, and if the problem is serious, it must be removed and redone;
5. Second-hand houses must be demolished first, but be careful not to smash all the old ones. Some materials that have been demolished can be reused, such as floors and tiles.
Matters needing attention in new house decoration
1, preliminary design
Mainly according to their own living habits, a detailed measurement of their own rooms, we should not be lazy, it is best to personally measure it again, the measurement content mainly includes: clear the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area; Determine the main wall size. Especially it is necessary to design the wall size of furniture in the future.
Matters needing attention in house decoration
2. Demolition and transformation of the main body
When entering the construction stage, the main body removal is the first project, which mainly includes wall removal, wall building, wall skin removal, heating removal, plastic steel window replacement and so on. To put it bluntly, the main body demolition is to put up the framework of the construction site first.
3. Hydropower transformation
Before the water circuit reform, the main structure should be basically completed. Between the hydropower transformation and the main body demolition, the first test of the cabinet should also be carried out. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers.
Mainly includes:
See if the position of the lampblack machine socket affects the installation of the lampblack machine in the future;
See if the location of the water meter is appropriate;
See if the location of the water inlet is convenient for installing the sink in the future.
For the first measurement of cabinets, students with a little experience can do it by themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately. The kitchen generally doesn't need to be waterproof.
4. Woodworking
Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement.
In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.
5. Gaiwa
During the operation of "bricklayer's second child", the installation of the following three links is also involved:
Installation of lintel and marble window sill. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.
Install the floor drain. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. Therefore, students should buy a floor drain as soon as possible when they start shopping for building materials.
Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.
When the "second bricklayer" left the scene, it was time to measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, it is time to measure the cabinet for the second time.
6. Paint the wall
The "Third Oil Worker" enters the site, mainly completing the basic treatment of the wall surface, painting the top coat and brushing the furniture made by the "carpenter". Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting.
- Previous article:How to get to Fuyang Road in Parkson Garden?
- Next article:A subsidiary of Shanghai jiaotong university Nanyang co., ltd.
- Related articles
- Where is Anyang Jianye Tonghe House?
- What is the name of the film adapted from the novel Dracula?
- How to realize the lowest cost heating at home in winter?
- What are the better state-owned enterprises in Qingdao?
- Demonstration contract of garbage disposal
- Where is the building address of Yingkou Yiju Roman Manor?
- What about Binzhou Zhonglianghui Food Co., Ltd.?
- Where is Wujiashan brittle bone wholesale in Dongxihu District, Wuhan?
- What is the telephone number of Anyang Wen Lan Impression Sales and Marketing Center?
- What is the telephone number of the office building sales office of Hefei Wantou Vanke Industrial Finance Center?