Job Recruitment Website - Property management - Introduction of Bairuijing Central Living Area Project

Introduction of Bairuijing Central Living Area Project

There are Hongshan scenic spots with Baotong Temple and Hongshan Park as the main body, as well as large university areas represented by Wuhan University and Wuhan University of Technology, which are full of humanistic atmosphere. At the same time, there are mature and perfect community supporting resources in the region, and the project will build a commercial street with a scene of 65,438+10,000 square meters. The central living area of Bairuijing covers an area of 800 mu, with a total floor area of 6,543,800 square meters above ground, including 960,000 square meters of residential buildings, nearly 6,543,800 square meters of public buildings and 6,543,800 square meters of underground buildings.

The architectural forms are high-rise, small high-rise, garden houses and villas. It is a comprehensive property integrating noble residence, super high-rise commercial office building, top luxury hotel and scenic commercial street. The ultra-low plot ratio is 2.0, the green space ratio is 37%, and the building density is only 13.6%. In the garden design, around the theme of leisure and health, we should create a comfortable, leisure and high-quality community environment, and reasonably retain and utilize the original precious tree species with a history of 50 years in the project; Emphasize the hierarchy and three-dimensional landscape in the community.

The second phase is divided into east and west areas, and the east area consists of five 34-story high-rise buildings; The west area is composed of five small high-rise buildings 1 1 and five 34-storey high-rise buildings. The second phase covers an area of about 90,000 square meters, with a total construction area of about 250,000 square meters, with an aboveground construction area of about 2 1 10,000 square meters and an underground construction area of about 40,000 square meters. The total land area planned for the second phase is 89 193㎡( 133.8 mu), which is divided into residential groups and public green space supporting groups (and the land on the east side of Central Park).