Job Recruitment Website - Property management - Does the test specification for waterproof layer closure in toilet (bathroom) stipulate that it should not be less than 24 hours or 48 hours?
Does the test specification for waterproof layer closure in toilet (bathroom) stipulate that it should not be less than 24 hours or 48 hours?
Water is released from the ground to form a small pool with a depth of 20 ~ 30 mm. After 24 hours of water storage, the property management department and the corresponding neighbors downstairs in the bathroom will check whether the lower floor is leaking. * * * Signature acceptance. If there is leakage, do or repair the waterproof layer again, and then do the closed water test in the above order.
In the following process, when the ground is decorated and bricklaying, the closed water test and inspection and acceptance will be done in the above order, which is also a process that workers must do. As long as the owner has a general understanding of the process, he should carefully check whether there are any omissions according to the procedures.
Extended data:
water resistant paint
The base surface should be clean, otherwise it will be easily punctured and lose its waterproof function during construction; The moisture content is not more than 9%, otherwise, the phenomenon of "two skins" separating the base surface from the waterproof layer will be formed.
The humidity in Chongqing is high all the year round, and the sequence of toilet construction is backfilling, mortar leveling, waterproofing and bricklaying. The master will carry out waterproof construction after the mortar layer is solidified, which can't meet the requirement that the water content of the coating construction base surface is not more than 9%, and the waterproof effect of even the best material will be discounted.
Waterproof layer setting and standard construction method: it must be painted for 2-3 times, otherwise glass fiber cloth should be added, and the thickness of the cured product painted for each time should not be less than 1mm, and the next construction should be carried out after it is completely dried (about 5-8h).
- Previous article:Has the Marriott Hotel in Shangyu opened?
- Next article:Brief introduction of Huiri Central Development International Building
- Related articles
- How about the decoration of Hulunbeier Dayucheng Community?
- The end of spring for Lao Li, the maintenance worker
- Renting a house in Beijing, the owner does not pay the property fee, and the property threatens to stop warming up. Does the property have this right?
- Thoughts on Rereading Tibetan Life and Death Book!
- How about Hainan Jianxiang Property Management Co., Ltd.?
- Four-character idioms with auspicious meanings
- Defoe Yunling property
- What about Yunnan Li Hui Property Management Co., Ltd.?
- What are the classic words in Xuzhou dialect?
- Changsha Poly Tianhui Property Details