Quality management system and measures of shed reform project.
The first section quality objectives
Our company will send quality engineers to supervise the quality of this project, and the quality goal of this project construction is to ensure the quality of the project is qualified at one time.
Section 2 Establishment of Quality Management Organization
A, according to the provisions of the enterprise quality management documents, respectively, from the aspects of process control and quality supervision, the project intends to establish the corresponding quality management system, to control the engineering quality, and according to the requirements of relevant documents, clear the relationship between the project intends to and the company.
Second, the provisions of the project intends to management personnel quality responsibilities.
Project manager: The project manager is the first person responsible for the quality of the project and is responsible for the quality for life.
Technical person in charge of the project: the person in charge of the project quality management, who is responsible for the project manager and the quality for life.
Each foreman controls the process quality and implements lifelong responsibility system for some projects he constructs. In this project, the project department, full-time quality inspector and team will implement three-level quality management.
Three, the establishment of quality assurance and quality supervision system and effective operation.
Four, by the company's full-time inspectors stationed at the scene according to the process quality inspection plan tracking inspection, measuring unreeling, masonry, interior wall plastering, floors, roofs, bathrooms, etc. As a key process, as a quality control point.
Five, the implementation of total quality management, improve the quality of the main body, decoration and installation projects.
(A) improve the TQC awareness of combatants, strengthen ideological and political work, and ensure the quality of the project with personal work quality.
(2) Develop quality management system and objectives, implement them horizontally to people, vertically to teams and groups, and implement the responsibility system from the company to the project department. Take project quality control as the company's management focus, strictly follow the quality assurance system established by ISO900 1:2000: 2000 model standard, and fully implement scientific, standardized, procedural and institutionalized management with a scientific management system combining professional management with computer management. With first-class management, first-class technology, first-class construction, first-class service and strict work style, we will carefully organize the construction, fulfill our commitment to the owner and achieve the project quality goal.
(3) Set up QC teams for "Quality Control of Installation Project" and "Quality Control of Decoration Project", set up QC management points for all common engineering quality defects, carry out QC activities, and ensure the engineering quality through the whole process management.
Project quality management organization plan
Section 3 Project Quality Supervision System
First, establish a project quality supervision system.
Second, establish a project quality supervision and guarantee system.
Third, the operation of the project quality supervision system
(1) The chief engineer of the project is responsible for supervising the control of documents and materials, inspection and test status, equipment control, quality record control, internal quality audit and the concrete implementation of corrective and preventive measures.
(2) The builder and each team leader should seriously carry out self-inspection and mutual inspection, and stop and correct the operation that violates the technical and quality operation procedures in time. And implement the attached drawings according to the quality control flow chart.
(3) The quality inspector conducts quality inspection independently and objectively, and has the right to prohibit unqualified products from being released.
(4) When surveyors find quality accidents caused by inaccurate measurement data, they shall promptly notify the competent leader and take corrective measures.
(5) Test measurers participate in the investigation and handling of quality accidents caused by inaccurate test measurement.
Section 3 Quality Control Measures
A, foundation and main engineering quality control measures
(1) In engineering construction, implement total quality management, improve the TQC awareness of combatants, strengthen ideological and political work, and ensure the engineering quality with personal work quality. Formulate quality management system and objectives, implement them horizontally to people, vertically to teams and groups, and implement the responsibility system from company to project layer by layer, focusing on the construction of this project.
(2) The control of axis, elevation, verticality and flatness is one of the key measures to ensure the excellent quality of the main project, which is controlled by full-time survey; The workshop section shall be reexamined by the foreman or technician. It is required to measure and set out accurately, and the setting-out pile position is stable and firm.
(three) strict material entry system, the good raw materials. Cement and steel bars shall be identified and classified in batches during transportation and storage, and shall not be mixed. The factory certificate must be complete, and materials without material certificate and unqualified materials are not allowed to be used to ensure the engineering quality.
(4) In the engineering construction, targeted work instructions should be taken for problems prone to common quality defects and construction difficulties:
1, steel engineering, conform to the requirements of drawings and specifications, by the foreman, technicians and quality engineer level 3 inspection, ensure not to drop, not short of, not bad. The key parts, namely the column and beam slab, are welded firmly with stirrups, and positioning hoops are not used, so that the main reinforcement of the column does not move or deform, and the plate reinforcement is divided and cross-bound with stay wires. The lower point of the hook at the end of the negative bending moment steel bar of the plate is bound with the steel bar at the bottom of the plate to prevent it from moving and deforming. In order to prevent the construction personnel from stepping on the floor steel bars when pouring concrete, the floor is cast with iron, reinforced with steel bars, and paved with springboard, which moves with the pouring.
2. Formwork engineering is the key to ensure that reinforced concrete beams, columns and slabs are not deformed and feel good. The beam-slab structure of this project is relatively stereotyped, so we consider adopting high-quality stereotyped steel formwork and plywood to ensure the construction quality of the project. Beam-column joints are made of 12 thick waterproof plywood and battens, beams and columns are made of composite steel formwork, and plates are made of plywood formwork. It is required that the formwork shall be tight and not collapse, with stable support and firm internal support and external hoop, so as to truly prevent formwork from expanding, necking and slurry leakage.
3. In order to ensure the construction quality of concrete, a concrete field monitoring test group was set up during the construction. Concrete pouring shall be managed by special personnel in sections, and each section shall be watered continuously, cut by layers and vibrated by layers to ensure compactness, so that concrete is solid inside and light outside, components are square and the appearance is good.
4. In the process of construction, it is necessary to strengthen the cooperation of various types of work, interspersed with construction, unified arrangement and coordination, make the process scientific and reasonable, reduce mutual interference, and avoid the occurrence of wall digging and damage rework.
5. Eliminate common quality faults and assign special personnel to be responsible for the construction.
6, adopt advanced management methods in the process of engineering construction, formulate scientific and feasible quality management methods, and ensure the engineering quality.
Quality management control measures of formwork engineering
Quality management control measures of reinforcement engineering
Control measures of concrete engineering quality management
Second, the decoration engineering quality control measures
(a) in order to ensure the quality of decoration engineering, we should conscientiously do a good job in the sample room and sample wall of decoration engineering during construction, and work out the sample color and specifications of decoration materials together with the construction unit and design unit * * * to make them meet the design requirements and meet the requirements of the construction unit.
(2) Guided by the set model, according to the different decoration parts and requirements of the project, and according to the construction technology and operation procedures, we will work out our own construction technology and implementation details. Technical disclosure shall be conducted by professional foreman, with clear practices, quality requirements put forward, and comprehensive construction of decoration engineering shall be carried out according to model standards and operation technology, so as to ensure the engineering quality and meet the requirements of building use functions.
(3) The decoration project should start with the quality of grass-roots construction, and do a good job of sticking cakes, leveling at the grass-roots level, wetting at the grass-roots level, layering plastering, etc., so as to ensure that the grass-roots level is firmly bonded, without hollowing and cracks, and the surface is flat and vertical, which is the key to ensure the quality of decorative surfaces.
(4) According to the design requirements, different facing materials should be constructed according to their respective construction technology requirements. Cement mortar should be plastered in layers, and it is forbidden to survive at one time. Strictly control the thickness of plastering, so that the surface is firmly bonded and the angle of yin and yang is straight. When painting the wall, you must carefully clean up the surface defects and scars, scrape putty, put the surface sand in place, and brush it in strict accordance with the operating procedures. During construction, it is necessary to prevent the pollution of construction waste or other dust, prevent dirty water from splashing out, and ensure the beautiful and clean surface quality of the coating.
(5) During the ceiling decoration construction, in order to ensure the construction quality, the bottom edge line of the ceiling should be strictly controlled to make the bottom elevation of the ceiling smooth and consistent. Strict plastering process, do a good job of cleaning the bottom of the board, make cakes, scrape the bottom ash first, and then smooth the ash in layers. After the base is dried, blow putty and spray sand paint. Ensure that the ceiling base is firmly bonded, the surface is smooth and crack-free, and the spraying is uniform and beautiful.
(6) In the construction of ceramic tile wall, the ceramic tile should be wetted before construction, and the layout should be tried at the construction site, and the horizontal sticking line and the corner blocks of Yin and Yang should be controlled. During construction, the tiles should be fully plastered from top to bottom, and special attention should be paid to the fullness of the corners of the tiles. After the construction is completed, the mortar joint should be done in time, and the dust and dirt on the surface should be cleaned up to ensure that the surface of ceramic tile wall is vertical and flat, the flat-fell seam is horizontal and vertical, there is no empty drum crack, and the angle of yin and yang is straight.
(7) For decorative projects with special requirements, the quality control should be based on the performance, construction technology and design requirements of these decorative materials, and the construction details, operating procedures and quality standards of the project should be done in detail.
Three, waterproof engineering quality assurance measures
Roof waterproofing is a key sub-project that affects the normal use of buildings and must be carried out in strict accordance with the current construction technical specifications.
(a) waterproof materials should have the main technical performance test report and factory quality certificate.
(2) There is no water or leakage on the roof. Generally, after the rain, check the water leakage, and if necessary, choose some places to sprinkle water to check. No water, water seepage or back slope.
(3) impinges mouth, drainage perforated strainer and other parts immediately after installation cover or wear tight, to ensure smooth drainage.
(4) The concrete used for plugging the reserved holes should meet the design requirements, and should be watered in layers to prevent capillary leakage.
Four, installation engineering quality control measures
(1) Inspection and storage measures for materials and equipment
The performance and quality of the installed equipment and materials shall conform to the current national or ministerial technical standards. And have a certificate of approval, equipment should have a nameplate. After the arrival of all equipment, the project foreman, the quality inspector, the supplier representative and the buyer * * * accept unpacking inspection, and fill in inspection records according to regulations, which shall meet the following requirements:
1. The model, specification and quantity of the selected equipment shall meet the approved design requirements.
2, certificate and specification and other technical documents are complete.
3, appearance, paint intact without damage and deformation.
4, internal instruments, interfaces, etc. No damage, no crack, no damage.
5. Accessories and spare parts are complete and in good condition.
6, when necessary, use the instrument for targeted inspection.
(2) Water supply and drainage engineering construction measures
1, water supply and drainage professional construction reserve, embedded, should be carried out in strict accordance with the requirements of professional drawings, at the same time meet the requirements of architecture, structure and other professional drawings.
2. In this project, the steel pipe is used as the hole formwork for the pipeline crossing the floor (the diameter of the hole formwork is 50mm larger than that of the pipeline crossing), and the dirt on the surface of the hole formwork should be cleaned before use, so as to avoid sticking to the poured concrete and causing slag inclusion in the floor, thus causing leakage along the slag of the floor after it is put into use. Install the formwork according to the position of design drawings, and then use a d6 round steel as stirrups on both sides of the formwork to prevent displacement when pouring concrete. After the initial setting of floor concrete, slowly rotate and take out the formwork.
3. The holes reserved for water supply and drainage specialty in construction drawings and construction drawings shall be checked and proofread with civil construction personnel according to professional drawings before concrete pouring or bricklaying.
4, concrete pouring, the installer should stick to the hole mould, in order to quickly deal with and solve the displacement problems that may be caused by concrete pouring and vibrating.
(3) Construction measures of strong and weak current (fire fighting) project
1, the direction of junction box should be coordinated with other installation divisions, and the water supply pipeline should be guaranteed first, and then the power pipeline should be guaranteed.
2. In this project, in order to ensure that no holes are left and the conduit is good, special personnel will be appointed at the site to check the reserved holes in civil engineering and the reserved embedded work.
3, piping to avoid overlapping.
4. After the installation of the pipe wall bushing, it should be carefully checked to prevent the legacy and dislocation of this standard. And mark it. Embedded iron parts should also be marked with red paint.
5. When pouring concrete, the installer should cooperate at the scene and take remedial measures at any time when problems are found.
(4) finished product protection measures
1. After the pipeline and equipment are installed, plug the nozzle to avoid falling into sundries during the cross construction of civil engineering, installation and decoration.
2, drainage plastic pipe and electrical box after installation, should be in the outsourcing thickness of 0.2mm plastic film, for protection.
3. After the sanitary equipment is installed, a layer of corrugated paper shall be wrapped outside it to prevent collision.
Five, strengthen the quality control in the process of construction
(a) the implementation of production control and qualified control of the whole process of quality control, improve the quality management system of production control and qualified control.
(two) to strengthen the acceptance of the main materials, semi-finished products, finished products, building components, appliances and equipment used in construction projects and the re-inspection of important building materials.
(three) to strengthen the quality control of each working procedure, in the quality control of each working procedure in strict accordance with enterprise standards, and shall not be lower than the industry and national standards.
(four) after the completion of each working procedure, self-inspection, full-time quality inspector inspection and process handover inspection should be carried out, and intermediate handover inspection should be carried out between related professional processes.
Block diagram of quality control program in construction process
The fourth quarter waterproof engineering construction quality assurance measures
A, external wall leakage prevention measures
(a) to ensure the fullness of masonry mortar is an important measure to prevent external wall water seepage, masonry group should be carried out in strict accordance with the requirements of construction specifications and operation specifications.
(2) Double-row scaffolding should be erected on the external wall to minimize scaffold holes. Before painting the exterior wall, the residual slurry and sundries in the construction holes should be removed, watered and moistened, and then laid with mortar and brick of the same label.
(3) For the infilled wall under the frame beam, the top skin brick should be obliquely attached to the bottom of the beam, and the masonry should be dense.
(4) Cement mortar priming must survive twice.
Second, the external wall doors and windows engineering seepage prevention measures
(a) When the horizontal and vertical members are combined, the socket method should be adopted, the socket size should not be less than 10mm, and sealed with sealant.
(2) The outer sealing strip is an important part of gas insulation and waterproof. Pay special attention to the aging resistance of the sealing strip when installing, and the specifications are appropriate. The sealing strip should be firmly embedded in the sash, cut into 450 angles at the corner and firmly bonded with silica gel, without gaps. After the doors and windows are closed, all sealing strips must be compressed. The sealant embedded between outdoor glass beads and glass must be full and firmly bonded to prevent water seepage from here.
(3) The riser on the frame should be provided with a drainage groove, and the sealing strip at the corresponding position should also be slotted.
(4) There should be notches on the outside of doors and windows near the door frame. When filling the sealing material, the base surface of the notch must be dry and clean, and there should be no gaps and pores on the surface of the sealant.
(5) In order to prevent water from infiltrating into the tiny gaps in the window frame and mortar, a film-forming waterproof material can be used to block the capillary holes.
Three, roof and toilet water leakage prevention measures
(a) Toilet (roof) should check the elevation of floor drain before laying leveling layer, and plug the joints of riser, casing and floor drain through the floor with fine stone concrete and seal them. Leave 8- 10mm deep groove around the pipeline, and wrap the nozzle and floor drain with waterproof paint. The intersection of leveling layer and wall surface is made into small rounded corners.
(2) After paving, a water storage test shall be conducted, with the water storage depth of 20 ~ 30 mm and no leakage within 24 hours, and records shall be made.
(3) After passing the test, the mortar protective layer on the waterproof layer shall be prepared immediately.
(four) the prevention and control measures of water accumulation on the roof and bathroom floor
1. During structural construction, attention should be paid to ensuring the indoor and outdoor height difference of the bathroom and the flatness of the roof.
2, copy flat pay-off, unified elevation, to ensure that the bathroom floor tile is much lower than the outdoor ground by 2cm.
3. Install floor drain and toilet at uniform elevation to ensure the direction of toilet drainage. For floor drain or toilet, the slope of ground drainage should also be ensured to be not less than 65438 0%.
4, strengthen inspection, do water splashing test and record.
Section 5 Management System of Project Department
I. Comprehensive training
(A) quality awareness education
Strengthening the quality consciousness of all employees is the primary measure to create high-quality projects. Before the project starts, according to the characteristics of the project, the chief engineer of the project is responsible for organizing relevant departments and personnel to prepare the quality awareness education plan of the project. The plan includes the company's quality policy, engineering quality objectives, engineering excellence plan, engineering quality plan, technical regulations, procedures, processes, construction methods and quality inspection and evaluation standards. Improve the quality awareness of all kinds of managers and constructors through education, and run through practical work to ensure the smooth realization of the project excellence plan. Quality awareness education for project managers at all levels shall be organized by the chief engineer and site manager of the project management department; The person in charge of project quality is responsible for organizing and educating the management personnel at all levels of subcontractors involved in the construction; Subcontractors should educate construction operators, and on-site responsible engineers and professional supervision engineers should supervise and inspect the education of subcontractors.
(B) to strengthen the subcontracting training
Subcontracting is the direct operator. Only by improving their management level and technical strength can the project quality reach the set goal. Therefore, we should focus on technical training and quality education for subcontractors to help subcontractors improve their management level. In view of this project, the sub-contract team leader and main construction personnel shall be comprehensively trained in technology, technology and quality according to different majors, and the sub-contract team without training or unqualified training shall not enter the site for construction. The project department will guide subcontractors to establish a responsibility system, implement the project quality assurance system into their respective construction quality management, and urge them to implement all the work.
The second is the selection of material suppliers and the management of material entry.
In the structural construction stage, the template processing and manufacturing, the determination of suppliers of concrete raw materials, the adoption of raw materials and finished products of steel bars, the materials and equipment suppliers in the decoration stage and the electromechanical installation stage should adopt an all-round and multi-angle selection method, with excellent product quality, reasonable material price and excellent finished product quality as the criteria for material selection and positioning. At the same time, the files of qualified material suppliers are established and evaluated, and the files of materials suppliers with the best reputation are determined and evaluated, and the materials suppliers with the best reputation are determined. Inspect materials, semi-finished products and finished products in strict accordance with specifications, drawings and construction requirements, and return unqualified products immediately. After materials enter the site, they should be stacked according to the material performance and the requirements of the manufacturer, and flammable and explosive materials should be stored separately.
Third, strictly implement the construction management system
(A) the implementation of the model first system
Before the construction of sectional works, the responsible engineer of the project manager department shall organize subcontractors to carry out model sectional construction according to the special construction scheme, technical disclosure and current national standards, and the construction can only be carried out after it is confirmed that it meets the design and specification requirements.
(two) the implementation of inspection and acceptance system.
1. self-inspection: after each sub-project is completed, the construction team shall conduct self-inspection on the construction products. Meet the requirements of quality acceptance standards, the team leader shall fill in the self-inspection record form.
2. Mutual inspection: Under the organization of the professional supervision engineer of the project management department, the subcontractor foreman and the quality engineer will organize the construction team in the upper and lower order to conduct mutual inspection on the sub-projects that have passed the self-inspection, and the problems found in the mutual inspection should be seriously and timely solved by the upper and lower teams.
3. Handover inspection: the teams of the upper and lower working procedures have passed the mutual inspection and found that they meet the requirements of the quality acceptance standards of subdivisional works. Both parties shall fill in the handover inspection record and sign it by the subcontracting foreman before proceeding to the next working procedure. The professional supervision engineer of the project requires to participate in the supervision in person.
(3) Quality meeting system, quality consultation system and quality evaluation system.
1, weekly production meeting quality evaluation
The project management department holds a production meeting once a week, and the site manager puts quality evaluation on the important agenda of the meeting. In addition to arranging production tasks, he also comprehensively summarized the quality trends of the construction site last week, and pointed out the quality problems existing in the construction and the measures to solve these problems. And form the minutes of the meeting, so as to check the implementation item by item when holding the regular meeting next week. Give verbal praise to subcontractors with good performance, warn subcontractors with poor performance, and make rectification within a time limit. For subcontractors with poor project quality performance, the project may consider canceling the contract and ordering them to leave.
2. Weekly quality meeting
Presided over by the quality director of the project management department, all the administrative leaders and technical directors of subcontractors involved in the project construction attended. First of all, the subcontractors involved in the project construction report the quality of the construction project last week, the operation of the quality system, the existing problems in quality and their solutions, and the matters that need the assistance of the project management department.
The person in charge of project quality should listen carefully to their reports and analyze the shortcomings or problems existing in the quality activities last week. Participants * * * discussed the measures that should be taken to solve the quality problems and implemented them after the meeting. Minutes of regular meetings should be made at each meeting and distributed to the participants as the basis for checking the implementation of regular meetings next week.
3, monthly quality inspection and evaluation
At the end of each month, the person in charge of project quality shall organize the administrative and technical heads of subcontractors to conduct physical quality inspection on the projects under construction, and subcontractors shall write a summary report on the quality of the projects under construction this month and submit it to the relevant leaders of the project quality headquarters, departments and subcontractors. In the briefing, the contractors with good quality should be praised, and the parts that need rectification should be clearly marked with the rectification period. Next week, the quality will check item by item whether the rectification is thorough.
(4) listing system
1, technical disclosure list
Before the start of the working procedure, the key points and difficulties in the construction are listed on the site, and the specific requirements of the construction operation, such as steel bar specifications, design requirements and specification requirements, are written on the board, which is not only beneficial for managers to make on-site disclosure to workers, but also convenient for workers to consciously read the technical disclosure, so as to achieve the unity of theory and practice.
2, the construction site list
Implement the system of listing on the construction site: hang a "construction site card" on the construction site, indicating the construction site, process name, construction requirements, inspection standards, inspection responsible person, operation responsible person, punishment provisions, etc. , to ensure that the problem can be traced to the end, the implementation of the reward and punishment regulations, improve the sense of responsibility and professional level of relevant responsible persons, and achieve the purpose of training teams and cultivating talents.
3. List of operation management systems
Indicate the operation flow, process requirements and standards, responsible person, management system and related requirements and precautions. For example, the curing system of concrete test blocks with the same conditions must indicate that the curing conditions must be the same as those of the concrete in the representative parts.
4, semi-finished products and finished products listing system
Steel raw materials, semi-finished products, cement, sand and gravel used in the construction site shall be listed and identified, and the identification shall indicate the use position, specifications, place of origin, time of entry, etc. , storage requirements must be indicated if necessary.
If you want to know more about the construction information such as "Quality Management System and Measures of Shed-to-Residential Area Project", you can search in Zhong Da Consulting Building.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:How about Anhui Haohua Construction Engineering Co., Ltd.
- Next article:What about Qingdao Sequoia Investment Development Co., Ltd.?
- Related articles
- I want to open a nursing home. What should I do?
- What is the greening rate of Genting in Jingshan Country Garden in Jingmen?
- What seven places do "Qizi" refer to?
- Is it the same for Zhumadian to introduce talents to campus recruitment?
- What is the price of Tianjin Binhai Ligao Sunshine Coast Villa?
- How much is the profit of the annual report of American real estate?
- Where is Guilin Xingjin Lijiang County Villa?
- What is the surrounding environment of Yue Ying, Washington? Is life convenient?
- What is the telephone number of Fuyang East Lake Century City Sales Center?
- A contract between big property and small property