# Model rural housing contract (1)#
Party A: —————
Party B: —————
Party A builds a house in a village in the city, with a total construction area of about square meters, which is contracted by Party B. Through consultation, both parties agree to sign the following contract:
First, the contracting method.
Take the way of contracting without contracted materials. Party A shall provide building materials, including red bricks, river sand, gravel, lime, cement, steel, water pipes, sewer pipes, nails, wire ties, water and electricity, etc. Party B provides labor services, construction technology, templates, supports, scaffolding materials, code nails and production and living appliances.
Second, the construction project
Party B shall carry out the construction according to the design drawings or the requirements put forward by Party A. The buildings of Party A's main building project include walls, beams, columns, stairs, floors, formwork installation, formwork removal, steel bars, cast-in-place concrete and concrete cushion for the ground and front steps; Paint the interior decoration, paste the front exterior wall tiles, cement mortar back wall, paste the bathroom floor and wall tiles, and install porcelain pots, toilets, sewers and downspouts; The top layer is polished with cement slurry, and at the same time, it is well impervious.
Third, the contract price
Rmb per square meter, and the construction area is calculated according to each external wall. The parapet is calculated per meter 10 yuan, and plastered with cement mortar. The ground concrete will be compacted by another construction team, and the required expenses will be borne by both parties-%.
Four. mode of payment
Pay RMB for tamping the first layer of bricklaying, RMB for the second layer of bricklaying and RMB for the third layer of bricklaying, which will be completed at one time after the project acceptance.
Verb (abbreviation for verb) The responsibility of both parties.
Party A is responsible for the water and electricity supply and the timely entry of raw materials. Party B must ensure the quality of the project, carry out the construction according to the design drawings and Party A's requirements, save materials, take good care of them and not lose them.
Six, quality requirements
Party B shall organize the construction according to the housing quality standards and requirements stipulated by the state, and Party B shall be responsible for reworking the unqualified ones, and the rework expenses shall be borne by Party B. ..
Seven, pay attention to safety
Civilized construction, if Party B's construction personnel have accidents such as work-related injuries due to construction, Party B shall be responsible for everything, and Party A shall not bear any responsibilities and expenses. Civilized construction, pay attention to professional ethics, pay attention to cleanliness.
Eight, the time limit for a project requirements
The construction period of the main project is-months, counting from the date of signing the contract, Party B must complete the main project before-days, and the completion time cannot exceed-days, and Party B shall not delay the completion time of Party A's construction for various reasons. Party B shall submit the plan to Party A two days in advance for quick preparation.
9. Other matters not covered shall be settled by both parties through consultation.
This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.
Party A's signature (seal): Party B's signature (seal):
# Model rural housing contract (Chapter 2) #
I. Overview of the Project
Project name:
Private residence.
Project location:
Party A's original residence is Xiazhai Village Cooperative in Luojiang Town, huixian city .. Editor's recommendation: Prepare party member _ _ _ _.
Project content:
All construction projects in the design drawings.
Building area:
*** 148.8 square meters.
Second, the scope of project contracting
Scope of contract: The contractor does not include materials.
Third, the term of the contract.
Commencement date: March 8 (the first day of the second lunar month).
Completion date: July 8 (the sixth day of the sixth lunar month).
The total calendar days of the contract period is 102 days.
Four. Contract price
The salary is per square meter 180 yuan, the total construction area is 148.8 square meters, and the total contract price is 26,780 yuan.
Payment method: Party A shall pay the total contract price in four installments. For the first time, after the foundation project is completed, Party A shall pay Party B 30% of the total contract price, namely 8,000 yuan; After the second main project is completed, Party A shall pay Party B 30% of the total contract price, namely 8,000 yuan; For the third time, after the project is completely completed, Party A shall pay 30% of the total contract price to Party B, namely 8,000 yuan; The remaining 65,438+00% (i.e. 2,780 yuan) shall be used as the quality guarantee, which shall be paid by Party A to Party B in full when there are no major quality problems one year after the project delivery.
Verb (abbreviation of verb) quality standard
Engineering quality standard: construct according to the drawing to ensure the engineering quality.
The rights and obligations of both parties of intransitive verbs.
1. Rights and obligations of Party A:
(1) Party A provides Party B with three links and one leveling.
(2) Pay on schedule.
(3) Provide all necessary information to Party B in time.
(4) Before the project starts, provide Party B with two sets of design drawings.
(5) In the process of construction, if quality problems are found or the design drawings are changed without authorization, Party A has the right to require Party B to rework.
2. Rights and obligations of Party B:
(1) Construction according to the drawings. If the original design needs to be changed during the construction, it can only be modified with Party A's consent. ..
(2) Ensure the engineering quality.
(3) Ensure the construction period and finish the project on time.
(4) During the construction, Party B shall inform Party A of the materials needed 2-3 days in advance so as to purchase them in time. Party B shall adhere to the principle of economy and shall not waste materials.
(5) After each subdivisional work is completed, Party B shall obtain Party A's acceptance before proceeding to the next working procedure.
(6) Party B shall pay attention to safety in production, and all safety responsibilities shall be borne by Party B. ..
Matters not covered in this contract shall be settled by both parties through consultation.
This contract shall come into effect as of the date of signature by both parties.
This contract is made in duplicate, one for each party.
# Model rural housing contract (Chapter 3) #
Party A (Employer): Name: (hereinafter referred to as "Party A")
Party B (Contractor): Name: (hereinafter referred to as "Party B")
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the specific conditions of this project, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached an agreement on matters related to the construction of this project.
I. Overview of the Project
Project name: self-owned residence, project location: Party A's housing construction project is contracted out to Party B in the way of no material, and the settlement method is manual single contract, according to the actual construction area of RMB (in words) per square meter.
Second, the engineering construction requirements
1. Party B shall construct according to the design drawings provided by Party A, and the wall of the whole building shall be constructed in cm, with the height of the first floor being cm (cladding) and the height of the second floor being cm (cladding). The diagonal of the room shall not be less than or greater than cm, the angle of yin and yang shall reach one degree, the wall shall be vertical, the wall plastering shall be smooth, and the living room on the first and second floors shall have girders.
2. In the process of wall building, Party B must ensure that the mortar is full, the assembly method is correct, the axis deviation is not greater than the specification requirements, and the masonry brick body shall not fit up and down.
3. Before the constructional column and beam are closed, re-check whether the installation position, quantity and spacing of steel bars are correct, and there shall be no less leakage of steel bars, and whether the protective layer is retained correctly. The mold can be closed only after passing the inspection. Template support should be solid and reliable, and concrete should be fully vibrated to ensure the quality of concrete forming. After concrete pouring, it must be fully cured.
4. In the process of earthwork backfilling, compaction is required, and no concealment is allowed without compaction.
5, wall and floor tile installation, paste firmly, mortar full without empty drum, cracks, smooth surface.
6. All materials such as steel and cement put into use in this project shall not be wasted in the construction, and the ground ash laid every day shall be collected in time. At the same time, it is forbidden to cut corners, and construction must be carried out with good quality and quantity.
Third, the project quality
1. The project quality shall be inspected and accepted by Party A according to the national quality inspection and evaluation standards for construction projects. In case of building quality problems, Party B shall rework and repair them until they meet the quality requirements of Party A, and all expenses for rework (including rework hours and materials) shall be borne by Party B. ..
2. The building quality problems mentioned above include the following aspects:
(1) The main wall is not perpendicular to the horizontal ground, and the wall is uneven and cracked;
(2) The main column is not perpendicular to the horizontal ground, broken or exposed;
(3) The beams and ring beams are broken, exposed and obviously distorted;
(4) The beams and columns are hollow;
(5) The mortar on the wall and roof falls off;
(6) The roof leaks and is flooded;
IV. Term of the contract:
Start date:
Date of completion:
# Model rural housing contract (Chapter 4) #
Both parties to the contract:
Transferor (hereinafter referred to as Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B): _ _ _ _ _ _ _ _ _ _ _ _.
Article 1: Location and nature of the leased land:
Party A's _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. (Attached with photos and the attachment of the homestead plan signed by both parties)
Article 2: Land transfer price and payment method
Party A and Party B * * * agree that the transfer price of the homestead is in figures: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 3: Rights and obligations of Party A and Party B:
1. After the signature of Party A, before receiving the payment for Party B's homestead, Party A shall provide Party B with the land title certificate, and ensure that the homestead is free from property rights disputes and financial disputes. If there is any dispute before and after the handover, Party A shall bear all the responsibilities.
2. When Party B handles the house property right and various formalities in the process of land use and construction,
Party A shall actively cooperate with Party B's work and provide assistance to Party B without regret or any conditions. After the contract comes into effect, all the property rights of the homestead, including the houses under construction in the future, such as all the money collected by the state, any unit or individual, shall be owned by Party B, which has nothing to do with Party A. Party A must cooperate and support in handling the land use and house property certificate in the future, and the house property rights shall be owned by Party B. ..
3. In the process of construction, if there are disputes such as land ownership, inability to handle legal building procedures, land use certificate, real estate license, adjacent disputes, and government departments preventing building due to Party A's reasons, Party A shall actively cooperate with mediation to ensure the smooth completion of building the homestead. The expenses incurred during this period shall be borne by Party A. ..
4. After this contract comes into effect from the date of signing, the ownership of the house and land shall be owned by Party B. ..
5. Ownership of the house. In the future, if the government department allows private transfer, Party A shall actively cooperate with Party B to handle the transfer formalities without any additional conditions (note: Party B shall bear the expenses when handling the transfer formalities).
6. After this contract comes into effect, Party A shall ensure the smooth completion of the self-built house. If the government department delays or stops work due to incomplete construction procedures, and the Law Enforcement Bureau stops the construction, Party A shall refund the self-built house funds of the homestead according to the actual situation.
7. Party A's original tap water and electricity contract shall be transferred to Party B at the same time after it takes effect.
Article 4: Liability of both parties for breach of contract
After this contract is signed by both parties, Party A and Party B shall not go back on their words or break the contract.
After the Contract comes into effect, Party A fails to deliver the homestead to Party B within the time stipulated in the Contract.
Party B has the right to require Party A to bear the liability for breach of contract and pay a daily penalty of RMB 65,438+0,000. After one month, it will be regarded as a serious breach of contract, and Party A shall pay Party B a penalty of ten times the total house price of the homestead and the house under construction. Party A shall not refuse to pay liquidated damages to Party B for any reason.
Article 5: Settlement of disputes
If there is any dispute between Party A and Party B during the performance of this contract, it shall be mediated by witnesses first. If mediation fails, it shall be settled through litigation in the local people's court.
Article 6: Entry into force of the contract
The signing date of this contract is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
The place of signing this contract is: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 7: This contract is made in quadruplicate, one for each party and witness.
Article 8: Signature of the parties and witnesses (by handprint)
Party A (Seller) (name: husband and wife): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B (the buyer)
Contact number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ : _ _ _ _ _ _ _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 9: The floor plan, photos, copies of ID cards and original vouchers shall be attached to this contract and have legal effect.
# Model rural housing contract (Chapter 5) #
Party A: _ _ ID number: 44030__904 17
Party B: _ _ ID number: 4409__ 1574 18.
Party A purchased a residential land in Beixin Village, Danzhutouling, Shawan, Buji Town, Longgang District, Shenzhen, with the construction land planning permit number of. 199 14463 and construction project planning permit number 19926483; Land use notice: 18 144; Due to lack of funds, Party A and Party B agreed to jointly build a seven-and-a-half-story residential building through friendly negotiation. Details of the agreement are as follows:
1. Party A is responsible for providing the above-mentioned land, and Party B contributes RMB 680,000.00 Yuan to acquire a set of two bedrooms and one living room in Block A of Bujidan Zhutou Complex Building, with a construction area of about 60 square meters. (Area is subject to the measurement of building area)
2. Party A shall assist Party B in handling the real estate license of the house jointly built by Party B, and the expenses shall be paid according to the floor and suite. Party B owns the ownership of the unit and has the right to lease, transfer, donate, inherit, mortgage and dispose of the unit. The right to use the house is 70 years.
Three. Building decoration requirements: 1. The house is a frame structure (Party A shall be responsible for the fine for the overbuilding part). 2. Decoration: the exterior wall is pink high-grade brick, the interior wall hall and room are glass smooth rubber walls, the kitchen and bathroom are tiled, equipped with stainless steel dishwashing basin, gas station, vegetable cutting table, faucet and toilet basin. Floor tiles are used, and aluminum alloy windows are used for windows. Each room is equipped with wooden doors and locks. The water and electricity facilities shall be installed by Party A, and the urban land acquisition and road construction expenses shall be borne by Party A (according to the original layout, the expenses for Party B's second decoration and alteration shall be borne by Party B).
4. Payment method: one-time payment after witnessing. If Party B fails to pay the money to Party A on time, it will be regarded as an automatic waiver of property rights, and the receipt of Party B's cooperative housing construction will be invalid, and the lawyer's witness fee will be borne by Party B. ..
5. Both parties have the right to public access facilities in the building, and must abide by national laws and regulations and social ethics, maintain public access facilities, and pay management fees for public access facilities (security salary, public electricity fee, security office and other related households * * * *) according to relevant regulations. When public facilities need maintenance, they shall be paid according to the proportion of the property area occupied by both parties.
Six, after the delivery of the property, if it needs to be modified, it shall not affect the overall structure, otherwise all economic losses shall be borne by the damaged party.
Seven. Liability for breach of contract: this agreement shall come into effect after being signed by both parties and witnessed by the witness department. If either party breaches the contract and causes losses to the other party, the breaching party shall pay corresponding economic compensation.
Eight. Any dispute arising from this cooperation agreement shall be settled through negotiation between both parties. If negotiation fails, it can be submitted to Shenzhen Arbitration Commission for arbitration.
Nine. If the house is damaged due to force majeure or other factors, both parties shall compensate, and the compensation amount shall be divided according to the proportion of the construction area, and the related expenses shall also be paid according to this proportion.
X. Party A will not charge any other management fees and other miscellaneous fees in the future.
XI。 This agreement is made in triplicate, one for each party and one for the witness department, with the same legal effect.
Party A (signature and fingerprint): Party B (signature and fingerprint):
Year, month, year, month, year
##
- Related articles
- Touching topic composition 600 words
- What is the telephone number of Shijiazhuang Sunac Fortune 1 Marketing Center?
- Advantages and disadvantages of Yulin Nanxing Shi Sheng Xiyuan
- How about qingtian county Shixinyuan Art Sculpture Factory?
- When can Xunxian Sunshine New Town deliver the house?
- How many kilometers is it from Shiyan City, Hubei Province to the port of Shaanxi Province?
- How about Feng Dan Jianfa Property Management Co., Ltd.
- What's the telephone number of Mianyang Yujie Property Service Co., Ltd.?
- Where is Pingnan Second Community?
- Is Parkview longting convenient for transportation? How should I get there?