Hydropower transformation is one of the most important links in home improvement, which needs careful design and construction. This paper will introduce the key points of hydropower transformation from waterway design, cabinet measurement, suppression test, floor drain and drainage.

Waterway design should be careful

Waterway design should be considered comprehensively, from the water purifier to the washbasin, the location, installation method and whether hot water is needed for each device should be planned in advance. At the same time, the choice of electric water heater or gas water heater should be decided as early as possible to avoid repeated reconstruction of waterways in the later period. It is best to leave an extra water outlet in the bathroom to facilitate daily cleaning such as mopping the floor.

Cabinet measurement provides replacement of water main machine.

When measuring the cabinet, don't forget to make an appointment with the water changing master to facilitate on-site communication. Waterproofing should be done before construction to ensure that there is no water seepage downstairs.

Inhibition tests should be serious.

After the waterway reconstruction is completed, remember to carry out suppression test. Keep it at 6-8 atmospheric pressure for 30 minutes to confirm that there is no leakage. It is best to have property present and strengthen supervision.

Floor drain drainage should be checked.

After the kitchen and bathroom floor tiles are laid, check the drainage of the floor drain. Excess floor drain should be closed to prevent water from overflowing.

Pay attention to safety in hydropower transformation

Hydropower transformation is one of the most important links in home improvement, so we need to pay attention to safety. The slotting cutter is simple to operate, but the coordination between electrician and bricklayer is very important. Wires should be made of conventional products, and conduits and cassettes should be flame-retardant to ensure safety. The water pipes shall be of reliable brands, and the connection mode shall be reliable and leak-free, and the pressure test shall be conducted according to the standard. Choose a large-diameter sewage pipe, avoid the right angle direction, and the length of gas pipeline and line should be appropriate, not exceeding 2m.