Zhengzhou latest property decoration price

The decoration is not easy, the raiders are in hand, and it is easy to deal with! From preparation to acceptance, a strategy is ready.

Preparation before installation

Want a great decoration effect, or do you want to save money and effort? Prepare 10 days in advance to make your renovation road smoother! Determine the decoration company, measure the house, make charts, communicate and design, and the plan is in place in one step! Four or five days before the start of construction, the budget proposal and quotation, renovation contract, materials should be read clearly! Finally, in a day or two, we are ready to enter school and go through the property formalities. Everything is ready. Let's start!

construction stage

Take 100 flat family residence as an example, it takes two days for demolition and reconstruction, ten days for hydropower construction, and then 15 days for mud and water works (waterproofing, tiling, etc. ). Woodworking time depends on the situation. If you buy it as a whole, you can rest assured! If necessary, it can be done in about ten days. Finally, 10 days of paintings (wall, ceiling, ceiling, wallpaper, etc. ). The overall construction is expected to take 50 days. Wait patiently, a beautiful home will be presented soon!

Construction acceptance

After the renovation is completed, the acceptance link is essential! Mainly depends on whether the construction quality is up to standard. At the same time, you can arrange to install water heaters, sanitary ware, sofas, televisions, etc. These don't interfere with each other, and they can be done in two or three days!