Job Recruitment Website - Property management - Property disinfection mode

Property disinfection mode

After receiving the house, you can consider looking for a decoration company, and determine the design plan after checking the house and measuring the house. At this stage, we must pay attention to the measuring room, and design according to the data obtained from the accurate measuring room can avoid certain construction errors and hidden dangers. This paper will introduce the decoration strategy in detail from the whole process of closing the house to moving in.

Precise measuring room

According to the data obtained from the accurate measurement of the house, the design can avoid certain construction errors and hidden dangers.

sign a contract

After the design scheme is passed, consider choosing the all-inclusive, half-inclusive or clear-inclusive decoration mode. After signing the contract, you can apply for a construction permit to the residential property accompanied by the constructor.

Preparation before construction

Formally go through the decoration formalities and submit the drawings to the property audit. On the day of commencement, check the construction time of the construction team, make clear the construction node and disclosure time with the construction project, and also confirm whether the brand specifications of the decoration materials used are consistent with the contract on site.

Finished product protection

Before construction, protect finished products such as doors and windows, public stairs and corridors with protective film.

Main body demolition

Determine the wall to be demolished according to the design drawings.

Hydropower transformation

Hydropower transformation is a hidden project, which will directly affect future life if it is not done well. Hydropower transformation requires designers to make disclosure at the scene, make clear the switch positioning of each space, and pay attention to the fixed points of strong and weak electricity boxes and water supply and drainage. Before the hydropower transformation, you should tell the designer your own needs completely, so that the designer will determine the transformation scheme of the circuit and waterway according to your needs when formulating the design scheme.

Masonry method

Mainly for the ground, walls, bathrooms, kitchens and other waterproof decoration. After the floor tiles and wall tiles are laid, pay attention to whether there is any empty drum.

Cabinet installation

Customized cabinets and background walls are convenient for on-site installation.

Completion cleaning

Furniture plays a role in soft decoration. After the house is cleaned, you can install beds, mattresses, wardrobes, shoe cabinets, sofas, dining tables, refrigerators, air conditioners and other furniture and appliances in the venue.

Ventilation and ventilation

Ventilation can remove formaldehyde and other decoration pollutants, and can be checked in after passing environmental protection testing.