The general decoration process is as follows:
First, the preliminary design: mainly according to their own living habits, detailed measurement of their own rooms, we should not be lazy, it is best to personally measure it again, the measurement mainly includes: clear the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area; Determine the main wall size. Especially it is necessary to design the wall size of furniture in the future.
Second, the demolition and reconstruction of the main body has entered the construction stage, and the demolition and reconstruction of the main body is the first project, mainly including wall demolition, wall building, wall covering, heating, plastic steel windows, etc. To put it bluntly, the main body demolition is to put up the framework of the construction site first.
Third, hydropower transformation Before the water circuit transformation, the demolition of the main structure should be basically completed. Some students may know that it is the first time to measure the cabinet between hydropower transformation and main body demolition. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. Mainly includes:
See if the position of the lampblack machine socket affects the installation of the lampblack machine in the future; See if the location of the water meter is appropriate; See if the location of the water inlet is convenient for installing the sink in the future. For the first measurement of cabinets, students with a little experience can do it by themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately. The kitchen generally doesn't need to be waterproof.
Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement, which I will mention later. In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.
5. The bricklaying process in the "bricklayer's second child" operation also involves the installation of the following three links:
1. Installation of lintels and marble windowsills. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.
2. Install the floor drain. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. Therefore, students should buy a floor drain as soon as possible when they start shopping for building materials.
3. Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood. "The second child of the bricklayer" left the scene. At this time, you can measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, the second measurement of the cabinet can be carried out.
Sixth, painting the wall "The third oiler" comes into play, mainly completing the basic treatment of the wall, painting the wall and painting the furniture played by the "carpenter boss". Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting.
7. The ceiling of the kitchen and bathroom cabinet is the first line in the installation process, or it is a continuation of the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best for students to install ceiling lamps and exhaust fans (Yuba) in the kitchen and bathroom at the same time, otherwise thread ends and holes will be left.
Eight, after the installation of the kitchen cabinet ceiling, you can install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.
Nine, wooden doors installed on the second day of cabinet installation. As early as more than a month ago, after the wooden door was measured, it can be installed now. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed. Students should prepare related hardware in advance. If you want the wooden door manufacturer to install the window cover and pass it, you should also measure it when the wooden door manufacturer measures it, and install it at the same time on the day when the wooden door is installed. At the same time, you should consider putting the installation time of marble windowsill backward after the window cover is installed. Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, wooden door manufacturers should go to the door to measure the size of the door opening as soon as possible after the main body is demolished and rebuilt. Regarding the treatment of the doorway, it should be noted that if the height of the doorway at home is inconsistent, workers need to treat it at the same height-beautiful.
X. Floor installation The floor can be installed the next day after the wooden door is installed. If all goes well, it will take a day. The floor installation needs to pay attention to the following issues:
1. Before the floor is installed, it is best to let the manufacturer come to the door to investigate whether the ground needs leveling or partial leveling. Some decoration companies or teams will advise students to level the ground or partially level it, subject to the actual investigation of the floor manufacturer;
2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.
3. When installing the floor, if possible, the floor must be cut in the corridor. The forum also discussed this issue before, and some students thought it was immoral to cut the floor pollution area in the corridor. My idea is to clean up after completion, which doesn't matter. Cutting the floor indoors has serious pollution to the wall surface, and there is also the cutting of artificial stone countertops in cabinets. I believe all the students who have been decorated have some experience.
Eleven, the second day after the floor wallpaper, home clean, you can spread wallpaper. If it goes well, it's also a day. If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to leave the wallpaper glue left on the floor to Pioneer for cleaning. Before pasting the wallpaper, try to make the wall "nothing".
Twelve, install the radiator the day after wallpaper. Students who change or remove radiators can hang radiators on the wall in a down-to-earth manner. It's also a day. Wooden door-floor-wallpaper-radiator, which is recognized as the correct installation sequence. Install the wooden door first to ensure that the skirting line of the floor can be closely connected with the door cover of the wooden door; After installing wallpaper, the main reason is that the floor is dirty and dusty, which seriously pollutes the wallpaper. Here I use the principle of "whoever is dirty first" again. Finally, install the radiator, because the radiator can only be installed after the wallpaper is laid on the wall.
Thirteen, switch socket installation students should have a detailed understanding or record of the number and location of switch sockets in various natural rooms at home, especially those who paste wallpaper. Sometimes the wallpaper worker is irresponsible, and the wallpaper is laid at once, and there is no need for wallpaper knife to mark the position of your switch socket. So students still need to know for themselves.
Fourteen, lamps and lanterns installation, there is nothing to say. After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration-it felt really good.
15. All pipe fittings, bathroom fittings, toilets, clothes hangers, etc. All the hardware and sanitary wares bought before installation have been installed. After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive", really "alive". It is no exaggeration to say that it will be beautiful to open the dragon water for the first time and watch the water flow out. Convenient, the newly installed toilet at home for the first time will have a great sense of accomplishment.
Sixteen. Installation of curtain rod The installation of curtain rod marks the basic end of home improvement.
17. Don't install curtains before the start-up cleaning. Remember to remind everyone in the post of "explaining curtains" When cleaning, don't have furniture and unnecessary household appliances at home, leave as many "planes" as possible, so that the cleaning can be thorough.
As for the purchase time of furniture, my suggestion is that it should be completed after the renovation of water circuit at the earliest, so as to get a general understanding of the basic size range of furniture. Therefore, some students have been eager to book all the furniture before the decoration, and personally feel that it is unnecessary.
Nineteen, home appliances enter the market at this time, home appliances should enter the market, the installation of the installation, ready to move in!
Twenty, home accessories Home accessories, the last step of home improvement, and have changed from decoration to decoration, including the installation of curtains are home accessories. As for buying curtains, it is best to book furniture first to avoid style conflict. Home accessories also include buying some green plants, hanging murals, decorative handicrafts and so on ... in short, you can play freely after staying.
- Previous article:Suihua college fractional line
- Next article:Do you need the ID number of the downstairs residents for property maintenance?
- Related articles
- Which is the fastest way from Xiba intersection to Jingniu intersection?
- Where is the international address of Qiannan Prefecture?
- When will Bi Shuiyuan from Wuxue deliver the house?
- The idea of Vanke's happiness plan
- Who should I ask to repair the broadband of Quangang Shicuo Telecom?
- Who pays the property fee and heating fee for renting a house in Xi 'an?
- What is the sales service hotline of Yao Xing Wuzhou Villa?
- Huimin Shanghai City Delivery Time
- What's the price of Beijing Xianghe Villa?
- Advantages of Huizhou Meibo City