Job Recruitment Website - Property management - 20 19 Taiyuan heating time+payment standard+payment guide

20 19 Taiyuan heating time+payment standard+payment guide

The temperature in the north is slowly cooling down, so the heating time is beginning to be determined. In Taiyuan, the heating time starts from next month and lasts for five months. As for the heating fee, the price will be different in different regions. The following is a detailed introduction.

The heating time starts from 20 19, 1 1 and ends on March 3, 2020, ***5 months.

Payment standard: the residential heat price of central heating is 3.60 yuan per square meter per month according to the construction area (4.80 yuan per square meter per month according to the use area), and the non-residential heat price is 7.50 yuan per square meter per month according to the construction area. (excluding electricity, oil, gas and other energy sources for heating)

Room temperature reaches 18 2 degrees.

How to pay? At present, four enterprises provide heating services to the public. Due to the different payment procedures and methods, please take a seat according to the service enterprises in your heating area and pay in time in an appropriate way.

1, Guodian Taiyuan No.2 Heating Company

If the heating in your home is provided by Guodian Taiyuan No.2 Thermal Power Company, then each user will have a coded card number, and the mobile phone can easily and conveniently pay the Internet access fee.

Log in to the company website, the website of China Construction Bank or the official account of WeChat of Taiyuan No.2 Thermal Power Company, and enter the user number for independent online payment. At the same time, you can also pay at the nearest toll station.

Payment time:

From now until 2065438+09165438+10/0/5.

Payment method:

Online payment

Users must have a "heating payment card" user. If you have issued a payment card and forgot the card number, you can check the payment receipt of previous years. Users who have not received the heating payment card can call customer service.

609 1699, get the heating payment card number.

1. Online banking payment of China Construction Bank: login to the website of China Construction Bank: hppt://www.ccb.com for payment.

2. CCB mobile banking payment: log in to CCB mobile banking client and select "yue life" platform for payment.

3. Alipay payment: enter the living payment-heating fee, select Taiyuan No.2 Thermal Power Company, and enter the user card number to pay the fee.

4. WeChat payment: enter: heating payment in Taiyuan Local Treasure dialog box.

Office address:

Marketing Department of Taiyuan No.2 Thermal Power Co., Ltd. (West Jinlian Building12nd Floor, southwest corner of Qianfeng South Road, Changfeng West Street).

Residential property charges heating fees.

Service telephone number:

035 1——609 1699

Deferred payment:

Users who have not paid the heating fee as of 10/015 will be charged a late fee of 1‰ of the total heating fee every day from 10/0/6.

For users who have not paid the heating fee as of June165438+1October 15, a notice of payment within a time limit will be issued. If they still don't pay the fee within 15 days after the notice is issued, their heating will be restricted and the heating valve will be closed.

If the user closes the valve due to arrears or other reasons, and the heat user reapplies for opening the valve after paying the arrears, the heating company will open the valve for the user in the order of application.

Invoice:

Users who need to issue invoices for heating fees will exchange invoices with the Finance Department of Jinlian Building 10/5, southwest corner of Changfeng West Street, Qianfeng South Road during the heating period (202011-March 3 1). Users who pay through online platforms exchange electronic certificate for invoices. Tel: 609 1699

Tips:

In order to save your waiting time, users with heating payment card numbers can choose CCB online banking, CCB mobile banking and WeChat payment. For the safety of your funds, please try to pay by credit card.

2. Taiyuan Thermal Power Group Company

Taiyuan thermoelectric group company users pay fees, which are divided into two situations:

As a unit or individual user, if there is no "three supply and one industry" contract with the heating enterprise, it is necessary to charge the heating fee from the residential property or property right unit before handing it over to the heating enterprise.

If you sign a "three for one industry" contract with a heating enterprise, there will be a user code card number. You can log in to www.tyrl.com, enter the company's official website heating payment column, enter the user's card number and name, and realize online self-service payment.

You can also pay attention to the official WeChat account of Taiyuan Heating Group Co., Ltd. through the mobile phone, and enter the user number and name through "hot payment" to complete the payment of heating fees. You can also enter: heating in the official account dialog box of Taiyuan local treasure WeChat.

prompt payment

In addition, you can also log in to Alipay-Living Payment-Heating Payment, choose Taiyuan Thermal Power Group Company, and enter the user card number to pay for it yourself.

Query the user card number, you can contact the residential property or the heating branch in your jurisdiction to obtain the corresponding user number.

3. Taiyuan Chengbei Thermal Power Company

Users of Taiyuan Chengbei Thermal Power Company shall collect heat fees from residential properties or property rights units. At present, online payment cannot be realized.

4. Taiyuan Renewable Energy Heating Company

Users of Taiyuan Renewable Energy Heating Company are currently collecting heat fees from residential properties or property rights units.

Heating service coverage 1, the service scope of Taiyuan Thermal Power Group Company.

First heating branch

Service area east of Fenhe River: from Binhe East Road in the west, Jiefang Road, Liuxiang, Jiefang South Road and Kouzhuang West Road in the east, Fuxi Street, fu tung street and Zhonglou Street in the north and South Inner Ring Street in the south;

Service area to the west of Fenhe River: Binhe West Road in the east, West Central Road in the west, Xiaojingyu Street and Yingze West Street in the north, South Inner Ring West Street in the south and Lihuayuan in Changfeng West Street in part.

2 nd heating branch

The main service scope includes Hedong, Hexi and Xin Ying Street.

East of Fenhe River: east of Binhe East Road, south of North Central Street, west of North Tongpu Railway (near Jianshe North Road East Railway), north of fu tung street and Fuxi Street;

West of Fenhe River: east of Qianfeng North Road, south of Beipai Hongqu (north of North Central Street), west of Binhe West Road and north of Pengxi Sixiang;

Xin Ying Street area: Lan Xin Road in the east, Xinying South Lane in the south, Datong Road in the west, Nanzhai Park and Yangxing Avenue in the north.

3 rd heating branch

On both sides and east of Tiyu Road and Tiyu South Road, on both sides and west of Yu Tai Road, north of Longcheng Street and south of Qinxian North Street.

4 th heating branch

South of South Inner Ring Street, east of Binhe East Road, west of Tiyu Road and north of Dianzi Street.

5 th heating branch (Dongshan branch)

It starts from North Central Street in the north, Xuefu East Street in the south, Wuyi Road in the west and Dongshan border in the east.

6 th Heating Branch (Guo Jin)

South of xiaodian district Electronic Street, east of Taimao Road, west of Dayun Road, part of the load in Qingxu County, centralized heating area in Yaocun Town, Jinyuan District.

7 th heating branch

Guo Pu Road in the east, Huyu River in the south, Guandi and Duerping Mine in the west, and Xiji Road Machine Repair Factory in the north.

Chengxi heating branch

The service scope of electric heating heat source starts from Xizhang in the north, ends at Zhonghuan Street in the south, ends at Binhe West Road in the east and ends at Chaicun in the west.

Service scope of Taikoo heat source: North Central Street, South Inner Ring West Street, East Binhe Road and West Guo Pu Road.

Chengnan heating branch

South of Yingze Street, north of South Central Street, South Jiefang Road, Changzhi Road, East of Tiyu Road and west of Dongzhonghuan Road.

Taigu heating branch

Low-level network: Xinghua West Street in the north, South Inner Ring West Street in the south, Shangzhuang North Road in the west and West Central Road in the east.

High-altitude network: north to the foot of Yuquan Mountain, south to Huyu River, west to Xiaoximing, and east to Ring Expressway (West Ring).

Jinyuan heating branch

It starts from Binhe West Road in the east, reaches both sides of Jinyang Avenue in the west, reaches Yaocun Town in the south and Mengshan Street in the north.

2. Service scope of Taiyuan Renewable Energy Heating Company

South of South Central Street, west of Binhe West Road, north of Jinyuan South Boundary and east of Ring Expressway.

3. Service scope of Taiyuan Chengbei Thermal Power Company

It reaches Shengli Street in the north, Binhe East Road in the east, Dongshan Transit Ring Road in the west, Xin Ying Street in the south and Taiyuan Stainless Steel Industrial Park in the north, providing heating services such as operation and maintenance, emergency repair and emergency rescue for residents and industrial and commercial enterprises and institutions within the area of about 1.900 square kilometers in Xinghualing and Jiancaoping City.

4. Scope of service of Guodian Taiyuan Second Thermal Power Company

It starts from the South Inner Ring West Street in the north, the original power plant in the south, the Binhe West Road in the east and the Ring Expressway in the west. Jinyuan District and Wanbailin District have two heating management departments, which are divided into five central stations.

Taiyuan Digital Urban Management Center Tel 1

Users can call 123 19 urban management hotline for consultation and reflection; Or pay attention to online consultation of Taiyuan Digital Urban Management Weibo and Taiyuan Micro-Urban Management WeChat applet on the mobile phone to get the latest heating service information.

2. Taiyuan Thermal Power Group Company

Users can log in to official website of Taiyuan Thermal Power Group Company for online interactive consultation and reflection; Call the service telephone number of each heating branch in the jurisdiction to reflect:

First heating branches 776025 and 7776026;

Second heating branch 334629, 3334786;

The third heating branch 2770200;

The fourth heating branch 2411567;

The fifth heating branch 2770609;

The sixth heating branch 5281060;

Seventh heating branch 7782795;

Chengxi heating branch 2837661;

Chengnan heating branch 2418017;

Jinyuan heating branch 2791661;

Swire heating branch 5225 197.

3. Taiyuan Renewable Energy Heating Company

Users can call the service telephone number 703 10 18 for consultation and reflection.

4. Taiyuan Chengbei Thermal Power Company

Users can call the service telephone number 2863023 for consultation and reflection.

5. Guodian Taiyuan Second Thermal Power Company

Users can call the service number 609 1699 for consultation and feedback, and pay attention to the online interactive consultation and feedback of Taiyuan No.2 Thermal WeChat official account on the mobile phone.

6. Taiyuan Heating Management Center

Users can call the service telephone number 3350259 for consultation and reflection.

FAQ: How long is the heating season this winter? What is the room temperature?

A: According to the Regulations on Urban Heating Management in Taiyuan, the heating period in Taiyuan starts and ends from1October1day to March 3 1 day of the following year, which is five months.

According to the heating management regulations of Taiyuan City, the room temperature reaches 18 2 degrees.

What is the cost of central heating this winter?

A: At present, the notice of heating price adjustment has not been received, and it is still implemented according to the heating fee charging standards stipulated in Shanxi Provincial Price Bureau documents Jin Jia Shang Zi [2008] No.301and [2009] No.281. The residential heat price of central heating is 3.60 yuan per square meter per month according to the construction area (4.80 yuan per square meter per month according to the use area), and the non-residential heat price is 3.60 yuan per month according to the construction area. (excluding electricity, oil, gas and other energy sources for heating)

How to pay the heating fee for urban and rural low-income households?

Answer: For the low-income households in Taiyuan, if the housing area is less than 45 square meters, they will bear 15% of the heating cost according to the current heating charging standard, and the remaining 85% will be borne by the finance. Beyond the prescribed area, according to the current heating fee.

It should be reminded that you must go to the heating branch (or heating station or affiliated unit) to complete the authentication, accounting and payment with your ID card, the original real estate license and the information form downloaded by official website.

The requirement of real estate license is to guarantee the minimum living standard. If not, please go to the community to issue a certificate to explain the relationship between the two. It is suggested that citizens in need consult the Civil Affairs Bureau, and the heating company is only the handling unit.

What is the charge for district heating and other energy heating?

A: The Regulations on the Administration of Urban Heating in Taiyuan clearly stipulates that the charging standard for regional coal-fired boilers shall be implemented with reference to the charging standard for central heating in Taiyuan; Due to the high cost, the charging standards of fuel, gas, electricity and other heating methods are generally negotiated by both parties. If the property unit imposes this fee on individual owners, the public can call the price service hotline 12358 to reflect.

How do high-rise and super-high-rise units calculate and charge heating fees?

Answer: If the height of residential buildings exceeds 2.8 meters and that of non-residential buildings exceeds 3.2 meters, 3% heating fee will be charged according to the heating area for each building exceeding 0. 1 meter. Public welfare facilities such as culture, education and protection of buildings are charged at 100%.

Formula for calculating the height of apartment: Floor 1 construction area * 1.85 (coefficient) *0.75*4.8 yuan/square meter *5 months; Or the floor area of the first floor * 1.85 (coefficient) *3.6 yuan/square meter *5 months.

The charge is based on the Administrative Measures for Urban Heating Charge in Taiyuan issued on 20 10.

How to reduce the heating cost if the heating effect is not up to standard?

A: There are many reasons why the indoor temperature of heating effect is not up to standard. According to the "Regulations on the Administration of Urban Heating in Taiyuan City", if residents can't provide normal heating due to heat source plants or heating stations, the property right unit can apply to the management department of the heating company after the heating is over, and the user needs to fill in the application form and fill in the specific situation, and after verification, reduce part of the heating fee; The design of the pipe network of the property right unit is unreasonable or the pipe network is in disrepair, and the room temperature is not up to standard due to force majeure such as running, running, dripping, leaking, blocking the pipe, unauthorized modification, valve failure, water cut-off and power failure. , not included in the scope of nuclear reduction.

How to solve the problem of stopping heating due to overdue payment of heating fee?

A: According to the Regulations on Urban Heating Management in Taiyuan City, heat users use 1 every year.

1 heating fee paid in advance. For those who have paid the heating fee, the heating unit shall provide timely heating; If it is not paid within the time limit, the heating unit will issue a notice of payment within a time limit to the heat users. If it is not paid within fifteen days after the notice is issued, the heating unit has the right to limit or suspend heating, or bring a lawsuit to the people's court. Therefore, users must pay the heating fee in full and on time in order to enjoy heating normally.

How much should I pay for the application for stopping heating of vacant houses?

Answer: according to the answer, no. 20 1040 and no 20 12 169, the heating fee will be charged at 30% after the vacancy room applies for heating stoppage.

If the house is vacant, the user shall submit a written application to the property management company or the property right unit (before each year 10 when household control has been implemented, and before September 30 when household control has not been implemented), the property management company shall apply to the heating station in the area where it is located, and the heating station shall review it in advance, and block the valves of the heating pipe network of residents' homes. Then the application submitted by residents will be reported by the heating station to the management office of the heating company, and then reviewed by the monitoring team and fed back to the management office. However, the use of heat cannot be stopped if it endangers the use of heat by other users or affects the safe operation of indoor public facilities.

What necessary information do citizens need to provide when complaining that the heating in their homes is not hot?

Answer: For central heating users, it is necessary to inform the specific address and heating service unit, whether the heating is not hot, whether the heating fee is paid, and whether the neighboring neighbors have similar situations.

For regional heating users, it is necessary to inform the specific address and heating service unit, and what heating methods are used in the community, including self-provided boilers, gas heating, electric heating, sewage heating, etc. And whether the heating is hot or not, whether the heating fee is paid or not, and whether there is a similar situation in the surrounding neighbors. Make records after verification, and send the list to the urban area for coordination and supervision.