My nephew bought a house in Building 3 in China, but because he didn't know much about Huaibei when he went to work in other places, he was tricked into paying the money by the state, went through the formalities of handing over the house, and went back to work without checking the quality of the house. On weekends, when I am free, my brother and sister-in-law will inspect the interior of the house accompanied by the inspector of the house purchased by the state.

Problems found:

1, the center line error of building wall, the maximum error of diagonal measurement is 50mm, which is the first time I have encountered in the business for more than 30 years. This is the unqualified building subject!

2. On the surface, the strength problem of wall mortar reflected by everyone is that the cement dosage is not enough, and the mortar is white, not mixed mortar. The proportion of cement mortar shall not be less than 1:3. Only by checking the construction drawing can we know what domestic powder is. Listen, there are enough people in this country. Dare to announce the matching method of interior wall plastering for everyone's supervision?

3. The ceiling surface is uneven, and the maximum height error is 22mm. I remember that the standard requirement of ceiling flatness is not more than 5 mm, and not all the 25mm errors mentioned by relevant personnel in your country are qualified.

4. All the angles of Yin and Yang are not straight. Because the guide ruler is too big to carry on site, there is no measured data, and the impression is very poor. Uneven ceiling and uneven angle of yin and yang affect decoration, which will bring great trouble. If the ceiling error is large, gypsum powder or mortar will be used for repair and lining. If the lining is too thick, it will cause the ceiling to crack and fall off in the future. By the way, the error of wall flatness is less than 3mm, so when you check the house, take a ruler to lean against it, or find a 2m long aluminum alloy square tube to stick on the wall. If there is a gap greater than 3mm, it is unqualified, and the angle of yin and yang is also unqualified.

5. All plastic steel windows are not sealed inside and outside, and will seep into the room in the future. The fixing method of plastic steel window is invisible because of plastering. Starting from the bottom of the plastic steel door, directly nail it with cement. It can be inferred that the plastic steel window is also fixed in this way, which is strictly prohibited. It should be drilled with an electric drill and fixed with expansion screws. If the cement nail is directly nailed to the retaining wall, it will not absorb the nail, causing the whole window to fall off and come down from dozens of floors. Let's think about the consequences.

6. Almost all angles are not 90 degrees, and the maximum error is 7 degrees. This is annoying, too. You'll know when you tile it later. It's not how to put tiles at right angles.

7. The household has no water and electricity, so it is impossible to conduct water storage test and electricity inspection. How did hydropower pass the completion acceptance?

There are still some problems, so I won't go into them here. There is no 100% problematic house. Let's overcome small problems by ourselves! We are good citizens and don't want to get entangled with unscrupulous developers. It's not worth getting angry about.

For the above problems, fill in the acceptance record and ask the national procurement personnel who participated in the acceptance. When will the rectification be completed? We are still waiting for the renovation. Guess what they said: I don't know, just give you a report, but I can't promise you. Damn it, you have to rectify for two years, so don't worry about delaying my housing. After the warranty period, who should I repair it, or pay for it myself? What a rogue answer! In order to have the answer, let their personnel direct them to run before and after, and shuffle back and forth.

Later, in a room, I found a little fat man, took a look at the acceptance record and said, I have never seen you inspect the house like this. I have to measure the angle. Originally, I was very annoyed with the quality of the house, and I was even more annoyed when I pushed it again and again. I also answered him angrily: you haven't seen much. What do you use to measure the angle without an goniometer? You haven't seen the proof that you know too little. Later, I learned that that person is the so-called general manager Mao of the project department, and the boss is at this level. It is not surprising that he can say such ignorant, immoral and unprofessional words. It is conceivable that the national procurement project department is at what level and can build such a poor quality house.

I regret it. Why did I pay the money and go through the formalities? They will be uncles after paying the money. Anyway, you have accepted the house, so you can do whatever you like. How can a small ordinary person treat a big enterprise like me?

Niu B, "China Purchase is a key investment project in Huaibei City, with an investment of several billion yuan. If you say that my quality is not good, I will sue you for framing and pursue your legal responsibility. " For the above reasons, you have to sign and seal so many problems. It cannot be signed by anyone. Without the official seal of the unit, anyone who admits it in the end may accuse us of framing you. We can wait from 10: 30 until 12: 30, but we just don't want to stamp for approval. The leader of national procurement said that there was no such precedent. I don't understand: we just want to make a promise and have a maintenance period. Now all the developers are hiring. If it can't be repaired by then, it is a personal act to say that the signatory has left. Who are we going to find? If the personnel purchased by the state don't stamp, they are shirking their responsibilities and laying the groundwork for the future. Dog, you are shameless! Have you ever bullied the owner like this? With your reputation, whoever dares to buy your house will accept it!

At three o'clock this afternoon, the negotiation results of five owners' representatives and the state purchase.

make it clear

1, the developer overturned the previously admitted quality problem of the internal powder. It is proposed that the owner pay the money first and then inspect the house. If the house has quality problems, fill in the form one by one (attached at the back of the form), and the state will confirm that the quality proposed by the owner does exist. Then carry out rectification or pay according to the so-called industry standard.

2.5 representatives of the owner agree with the conditions proposed by the developer (see Article 1), and sign for confirmation. Once the representative signs and confirms, the relevant departments will give the developer several qualified seals, so that it can be determined that the developer has the conditions to hand over the house. If the owner refuses to accept the house, it is the owner's breach of contract, and the liability for breach of contract shall be borne by the owner.