In accordance with the provisions of the Civil Law of People's Republic of China (PRC), the Building Law of People's Republic of China (PRC), the Measures for the Administration of Residential Interior Decoration and other relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness, honesty and credit, and combining with the specific construction conditions of this decoration project, both parties reached the following agreement through consultation.

1 project overview

1. 1 Project location: 1.2 Project content: room and hall; The total construction area is square meters. 1.3 contract scope: 1.4 contract mode: both parties agree to adopt the following contract mode: (1) the contractor contracts all materials; (2) The contractor contracts some materials; (3) the contractor and the employer guarantee materials. 1.5 commencement date: completion date: total calendar construction period (including legal holidays) date: day Article 2 Contract price and payment 2. 1 Contract price amount (RMB in words): ¥;

2.2 Method for Determining the Contract Price Both parties agree to adopt the 1 method to determine the contract price. (1) adopts a fixed price. Fixed price plus% total risk coefficient calculation. All-in risks include (2) adopting adjustable prices, calculating expenses in accordance with relevant national engineering valuation regulations, and making adjustments and final settlement in accordance with relevant regulations. (3) Cost plus remuneration

2.3 After the project advance payment contract comes into effect, the Employer shall pay% of the project payment to the Contractor, that is, the time and proportion of deducting RMB (in words) advance payment:

2.4 Payment of project funds (progress payment) (1) Method of payment of project funds: (2) Amount and time of payment of project funds: The contract price adjusted due to engineering changes and the additional contract price agreed in other terms shall be adjusted and paid at the same time as the project funds (progress payment). If the employer fails to pay the project payment (progress payment) as agreed in the contract, and both parties fail to reach an agreement on deferred payment, the contractor may stop the construction, and the employer shall bear the liability for breach of contract.

Article 3 Construction Drawings Both parties agree that the construction drawings shall be provided in the following ways: (1) The employer shall provide the construction drawings in duplicate, one for the employer and one for the contractor. (2) The contractor's design and construction drawings are in duplicate, one for the employer and one for the contractor (the cost is included in the contract price).

Article 4 Work of the Employer 4. 1 Appoint as the representative of the Employer at the construction site, and be responsible for the performance of the contract. Supervise and inspect the project quality, progress and materials entering the site, and handle matters such as acceptance, change and registration. 4.2 Before the decoration project starts, apply for registration with the property or housing management agency, sign a decoration management service agreement with the property management unit, and take the initiative to accept supervision and management. If it is really necessary to dismantle or change the original building main body and load-bearing structure or equipment pipelines (water, electricity, heating and gas pipelines), be responsible for going through the examination and approval procedures with the relevant departments. 4.3 Provide the contractor with water and electricity needed for the construction, and explain the matters needing attention. Responsible for coordinating the relationship with the surrounding neighbors. 4.4 Be responsible for removing obstacles that affect the construction. Take protective measures for furniture and furnishings stranded in the house.

4.5 Before commencement, the construction drawings or work instructions shall be confirmed, and on-site disclosure shall be made to the contractor. 4.6 Responsible for handling the garbage generated by decoration. Unable to handle, you can also entrust the contractor to handle, and bear the corresponding expenses.

Article 5 Contractor's Work 5. 1 shall be appointed as the contractor's representative on the site, responsible for the performance of the contract. Organize the construction as required, and complete the construction task on time with good quality and quantity. 5.2 Carry out the construction in strict accordance with the drawings or work instructions and quality standards, and make records of various quality inspections. Strictly implement construction specifications, safety operation procedures, fire safety regulations and environmental protection regulations. Participate in the completion acceptance and prepare the project settlement. 5.3 Strictly abide by the stipulated decoration construction time, reduce construction noise and reduce environmental pollution. Dealing with the nuisance caused by construction and its relationship with surrounding units and residents. 5.4 Without the consent of the Employer and the approval of relevant departments, the original building structure and various equipment and pipelines shall not be dismantled and changed at will during construction. 5.5 Before the project is completed and handed over to the owner, be responsible for protecting all facilities and finished products on site. 5.6 Ensure the cleanliness of the decoration site, and do a good job of cleaning and handling before completion.

Article 6 Material Supply 6. 1 Materials and equipment used in decoration projects must meet national standards, have quality inspection certificates and indicate the product name, specification, model, manufacturer's name and address in Chinese. It is forbidden to use building decoration materials and equipment that have been explicitly eliminated by the state. 6.2 If the materials and equipment supplied by the Employer have quality problems or differences in specifications, thus causing losses to the project, the responsibility shall be borne by the Employer. 6.3 All materials and equipment purchased by the contractor shall be purchased according to the requirements of design, specifications and samples, and those that do not meet the quality requirements or have different specifications shall not be used. If it has been used, the contractor shall be responsible for the losses caused to the project.

Article 7 Safety in Production and Fire Prevention 7. 1 The construction drawings or instructions provided by the Employer shall comply with the Fire Protection Law of People's Republic of China (PRC) and relevant fire protection design specifications. 7.2 In case of safety or fire accident due to violation of relevant safety operation regulations, fire prevention regulations and fire prevention design specifications, the Employer shall bear all economic losses. 7.3 The contractor shall strictly abide by the construction safety operation procedures when carrying out decoration activities, take necessary safety protection and fire control measures in accordance with the regulations, and shall not use naked flame and conduct welding operations without authorization, so as to ensure that the operators and the surrounding houses and

Property safety. 7.4 The contractor shall bear all economic losses in case of safety or fire accidents caused by violation of fire laws and regulations and relevant safety operation procedures during decoration design and construction.

Article 8 Project Quality and Acceptance 8. 1 Both parties agree that the quality of this project should meet the national quality evaluation standards (excellent or qualified can be selected). 8.2 Economic expenditure increased by excellent engineering grade 8.3 This project takes construction drawings, practice descriptions, design changes and current decoration construction and acceptance specifications formulated by the state as quality evaluation and acceptance criteria. 8.4 The Contractor shall handle the concealed works and intermediate acceptance formalities in time. If the Employer fails to take part in the concealed works and intermediate acceptance on time, the Contractor may accept it by himself, and the Employer will recognize it. 8.5 After the completion of the project, the Contractor shall notify the Employer for acceptance, and the Employer shall organize acceptance within two days after receiving the acceptance notice, and go through the acceptance handover procedures. 8.6 After the completion of the decoration project, if the contractor is responsible for purchasing the decoration materials and equipment, it shall submit the instruction, warranty and environmental protection statement to the Employer.

Article 9 Project Change 9. 1 If the Employer needs to change the project and construction method, both parties shall handle the change negotiation visa in time before the project can be started, and the price and construction period can be changed accordingly. 9.2 The rationalization proposal put forward by the contractor involves changing the design and changing the raw materials, which must be approved by the Employer.

10 completion settlement. . . . . .