What are the procedures for building construction permit?
(1) The construction site has basically met the construction conditions;
(2) Having gone through the formalities for examination and approval of the land for the construction project;
(three) the construction project in the urban planning area has obtained the planning permit;
(4) If demolition is needed, the demolition progress shall meet the construction requirements;
(5) The construction enterprise has determined; According to the regulations, the project that should be entrusted to supervision has been entrusted to the supervision unit.
(6) There are construction drawings that meet the requirements of relevant design specifications;
(seven) in the quality supervision and safety supervision departments to handle the corresponding quality and safety supervision and registration procedures;
(8) The construction funds have been implemented, and if the construction period is less than 1 year, the funds in place shall not be less than 50% of the project contract price; If the construction period exceeds 1 year, the funds in place shall not be less than 30% of the contract price of the project.
apply for
(1) Submission:
1, housing construction projects, the applicant shall submit the following application materials:
(1) Completed and stamped building construction permits Application Form in triplicate;
2) The original construction project planning permit and a copy of its attachments;
(3) a copy of the approval procedures for land use (state-owned land use certificate or relevant approval documents);
(4) The original notice of review of construction drawing design documents;
(5) Construction contract filing form issued by the bidding management department;
(6) Supervision contract filing form issued by the bidding management department (submitted for projects that should be entrusted with supervision according to law);
(7) The safety production assessment certificate of the safety production management personnel of the construction enterprise (Grade B and C) and the original of the Data Handover Form for Underground Pipelines and Buildings (Form AQ-A-2) (for the record of construction safety supervision);
(8) the original proof of the implementation of the project construction funds;
(9) the civil air defense construction drawing filing receipt issued by the civil air defense department;
(10) power of attorney of legal person;
(1 1) Classification Registration Form of Beijing Building Energy Efficiency Design Review (in triplicate).
2 to apply for municipal infrastructure projects, the applicant shall submit the following application materials:
(1) Completed and stamped building construction permits Application Form in triplicate;
(2) A copy of the original construction project planning permit and its attachments;
(3) The original notice of review of construction drawing design documents;
(4) Construction contract filing form issued by the bidding management department;
(5) Supervision contract filing form issued by the bidding management department (submitted for projects that should be entrusted with supervision according to law);
(6) The safety production assessment certificate of the safety production management personnel of the construction enterprise (Grade B and C) and the original of the Data Handover Form for Underground Pipelines and Buildings (Form AQ-A-2) (for the record of construction safety supervision);
(7) Original certificate of implementation of project construction funds;
(8) Permission procedures for digging and occupying roads (digging and occupying roads need to be handled);
(9) Power of attorney of legal person.
3, decoration engineering applicants should submit the following application materials:
(1) Completed and stamped building construction permits Application Form in triplicate;
(2) The original construction project planning permit and a copy of its annex (submitted only when the facade is renovated);
(3) a copy of the property right certificate (a copy of the lease agreement and a certificate of consent to decoration issued by the property owner are required for renting the house);
(4) Construction contract filing form issued by the bidding management department;
(5) Supervision contract filing form issued by the bidding management department (submitted for projects that should be entrusted with supervision according to law);
(6) The original (copies B and C) of the safety production assessment certificate of the safety production management personnel of the construction enterprise (the construction safety supervision shall be filed and returned to the applicant after verification);
(7) Original certificate of implementation of project construction funds;
(8) Power of attorney of legal person.
(2) Precautions:
If a copy of the above materials is submitted, the copy shall be stamped with the seal of the applicant and the original shall be submitted at the same time, and the original shall be returned to the applicant after verification.
Work that the applicant needs to participate in
reconnaissance trip
Standard:
(1) The location and scope of the project land shall be consistent with the planning permission;
(two) the construction site demolition progress within the red line of land use and the scope of land acquisition determined by the planning permission meets the construction requirements;
(3) There should be safety protection measures at the construction site, and the setting of construction enclosures, the protection or relocation measures of underground pipelines, the safety protection measures of adjacent buildings, and the removal of obstacles erected in the air should comply with the provisions;
(4) Water supply and drainage, power supply and construction roads on the construction site meet the construction requirements, and the construction site is flat;
(5) There is no illegal construction.
Treatment result
(1) Form of results:
1. If the permit is granted, the handling result and the notice of building construction permit shall be made within 1 working days, and the permit certificate shall be delivered to the applicant within 10 days.
2. If the license is not granted, a notice of the processing result shall be made within 1 working day, explaining the reasons and the right of the applicant to apply for administrative reconsideration or bring an administrative lawsuit according to law, and the application materials shall be returned to the applicant.
(2) Precautions:
1. Time limit for completion: 8 working days.
2. Charging standard: There is no charge for this project.
Re-apply for a license, change the license and lose the replacement license.
Preparation and treatment conditions before application
It complies with the Administrative Measures of Beijing Municipality on Re-application, Change and Renewal of Construction Permit for Construction Projects (J.J.G. [2006] No.435).
apply for
(1) Submission:
Submit a new application for construction permit:
1, the construction unit changes, the construction unit to apply for a construction permit, it shall submit the following materials:
(1) Description of legal person change and power of attorney;
(2) The original and photocopy of the construction permit;
(three) a new application form for construction permit;
(4) The safety production assessment certificate of the safety production management personnel of the construction enterprise (Class B and Class C) and the original of the information transfer sheet of the above-ground and underground pipelines and buildings (format AQ-A-2)
(5) the changed state-owned land use certificate and construction project planning permit. The certificate of consent of the owner of the house shall be submitted for the house decoration project;
(6) For the project under construction, submit the record form of construction supervision contract change;
(7) For the completed project, submit the registration form for the termination of the contract between the original construction unit and the construction unit and supervision unit;
(eight) if it is necessary to dig roads, submit the certificate that the competent department of roads and the traffic management department of the public security organ agree to dig roads and occupy roads;
(9) If proof of funds is required and the construction period of the expansion project is less than 65,438+0 years, the funds in place shall not be less than 50% of the contract price of the expansion project; If the construction period of the expansion project exceeds 1 year, the funds in place shall not be less than 30% of the contract price of the expansion project;
2, the construction unit changes, the construction unit to apply for a construction permit, shall submit the following materials:
(1) Description of legal person change and power of attorney;
(2) The original and photocopy of the construction permit;
(3) The originals of the safety production assessment certificates (B and C) of the safety production management personnel of the construction enterprise and the information transfer sheet (Table AQ-A-2) of the above-ground and underground pipelines and buildings.
(4) Newly filled and stamped application form for construction permit;
(5) Construction contract cancellation record form issued by the bidding management department;
(6) A statement that the original construction unit has been evacuated from the construction site confirmed by the construction unit and the original construction unit;
(7) Change the construction contract filing form.
Submit the construction permit change:
1. If the supervision unit changes, the construction unit shall submit the following materials when applying for change:
(1) Change of written application and power of attorney of legal person;
(2) The original and photocopy of the construction permit;
(3) building construction permits application form;
(4) Termination agreement with the original supervision unit;
(5) the supervision contract record after the change.
2 design units change, the construction unit shall submit the following materials when applying for change:
(1) Change of written application and power of attorney of legal person;
(2) The original and photocopy of the construction permit;
(3) building construction permits application form;
(4) The agreement between the construction unit and the design contract;
(5) Notice of review of the design documents of the changed design unit;
(6) Change the construction project planning permit and attached drawings of the new design unit.
3. If the project name is changed, the construction unit shall submit the following materials when applying for change:
(1) Change of written application and power of attorney of legal person;
(2) The original and photocopy of the construction permit;
(3) building construction permits application form;
(four) the construction project planning permit after the change;
(5) The construction supervision contract filing form issued by the bidding management department shall also be submitted for the project under construction.
4, the construction scale changes, the construction unit shall submit the following materials when applying for change:
(1) Change of written application and power of attorney of legal person;
(2) The original and photocopy of the construction permit;
(3) The certificate of safety production assessment for the safety production management personnel of the construction enterprise (Grade B and C) and the original "Data Handover Form for Underground Pipelines and Buildings (Structures) on the Ground" (Form AQ-A-2) (for the record of construction safety supervision);
(four) the original construction project planning permit after the change and a copy of the annex;
(5) The house decoration project shall obtain the certificate that the owner of the house agrees to increase the decoration scale;
(six) the need to review the construction drawing, it shall submit a notice of review of the construction drawing design documents; Civil air defense projects, the need to submit construction drawings for the record notice; (7) The record form of the changed construction supervision contract;
(8) If it is necessary to dig roads, submit the certificate that the competent department of roads and the public security traffic management department agree to dig roads and occupy roads;
(9) Capital certificate: If the construction scale is increased within 1 year, the capital in place shall not be less than 50% of the contract price of the newly signed project; If the construction scale increases by more than 1 year, the funds in place shall not be less than 30% of the contract price of the newly signed project.
5. If the commencement date and completion date of the contract are changed, and the construction unit proposes that the construction permit is lost, the construction unit shall submit the following materials when applying for the replacement of the construction permit:
(1) reissue application and legal person power of attorney;
(2) A copy of the organization code certificate of the construction unit;
(3) Publish a statement on the loss of the construction permit in a newspaper at or above the municipal level.
(2) Precautions:
The application materials are complete and conform to the statutory form.
Work that the applicant needs to participate in
reconnaissance trip
On-site reconnaissance personnel can decide whether to conduct reconnaissance on the project site according to the actual situation. If site reconnaissance is required, the inspection standards, post responsibilities and authority are the same as the newly promulgated standards for site reconnaissance of construction permits. If on-site reconnaissance is not required, after stating written opinions and reasons, the application materials and reconnaissance record form shall be handed over to the first-instance personnel.
Treatment result
(1) Form of results:
1. If the permit is granted, the handling result and the notice of building construction permit shall be made within 1 working days, and the permit certificate shall be delivered to the applicant within 10 days.
2. If the license is not granted, a notice of the processing result shall be made within 1 working day, explaining the reasons and the right of the applicant to apply for administrative reconsideration or bring an administrative lawsuit according to law, and shall be returned to the applicant together with the application materials.
(2) Precautions:
1. Time limit for completion: 8 working days.
2. Charging standard: There is no charge for this project.
From Baidu Encyclopedia
- Related articles
- What does Sheqi County 1050 special rectification mean?
- Return to the original! I was admitted to Tsinghua only to be a security guard. Why do men have this kind of coquettish operation?
- What is the international greening rate of Chengdu Red Star?
- How about Yu Zi Property Management Co., Ltd.?
- Which is better for Yantian property uniform washing?
- Why is Cuijinyuan in Lijiang Garden in Guangzhou cheap and expensive?
- Who should compensate for the loss of water?
- How about Ningbo Economic and Technological Development Zone United Property Co., Ltd.?
- How about Sujin Shuozhou Coal Gangue Power Generation Co., Ltd.
- What is the ending of Black Clover?