What are the procedures for property takeover acceptance?

Part I: Pre-construction data

1, bid-winning notice and construction permit.

2. Construction contract.

3. Supervision contract of entrusted supervision project.

4, construction drawing review approval and construction drawing review report.

5, quality supervision registration.

6, quality supervision disclosure points and quality supervision work plan.

7. Geotechnical engineering investigation report.

8, construction drawing came record.

9. Construction organization design or construction scheme approved by the supervisor (or owner).

10, commencement report.

1 1, quality management system registration form.

12, construction site quality management inspection records.

13, technical disclosure record.

14, measurement and positioning record.

Part II: Sub-quality acceptance data

1, inspection record of foundation trench.

2, foundation pile engineering quality acceptance report.

3, foundation treatment engineering quality acceptance report.

4, foundation and foundation division engineering quality acceptance report.

5, the main structure division project quality acceptance report.

6, special division project quality acceptance report.

7, line laying acceptance report.

8. Quality acceptance records of foundation and foundation divisions, sub-divisions, sub-items and inspection lots.

9. The main structure division and its sub-divisions, disciplines and inspection batch quality acceptance records.

10, decoration division and its sub-divisions, disciplines and inspection batch quality acceptance records.

1 1, roof division and its sub-divisions, sub-items and quality acceptance records of the inspection lot.

12, water supply and drainage and heating division and its sub-divisions, sub-items and inspection batch quality acceptance records.

13, quality acceptance records of electrical division and its sub-divisions, sub-items and inspection lots.

14, quality acceptance records of intelligent division and its sub-divisions, disciplines and inspection lots.

15, quality acceptance records of ventilation and air conditioning division and its sub-divisions, sub-items and inspection lots.

16, elevator division and its sub-divisions, disciplines and inspection batch quality acceptance records.

17, quality completion acceptance record of unit project and sub-unit project.

18, outdoor engineering division (a branch), disciplines, inspection quality acceptance records.