Is there a charging pile in the community that can be charged?

Of course, according to the regulations. The specific regulations depend on how each place is formulated. According to the specific requirements of each place, you can apply for installation by submitting the corresponding application procedures. However, in the actual process, each community has the restrictions of community management and will not be installed. This requires consulting the residential property for installation.

Most of them are stipulated in this way. 1, the charging pile operation needs a large number of electric vehicle users, and the charging utilization rate of the community reaches a certain level. If the utilization rate is not high, the possibility of installation is very small. If there are cars and few electric cars in this community, it means that the demand for charging is not great and the utilization rate will certainly not be high. What is needed to operate charging piles is utilization rate. If you encounter such a community, it is recommended to consider it carefully, or you can install a part less, and then gradually increase the utilization rate.

2. The community meets the requirements of charging facilities, and all management conditions are in place. When installing the charging pile, it is necessary to confirm the charging conditions or whether the installation conditions are available. This is the most basic. If installation is not allowed, nothing else needs to be considered.

3. In addition, there must be a power of attorney issued by the property agreeing to install charging equipment and a certificate of use of fixed parking spaces. If the charging pile is to be installed, it must be approved by the property. This mainly depends on the communication between the owner himself and the property. If the property agrees and meets the installation conditions, apply to the power supply station where the community is located.

First: confirm with the property whether it supports the installation of charging piles.

This is very important and must be confirmed in advance. If the property does not support it, you can call the mayor's hotline to complain.

Second: prepare materials and follow the process.

After buying a car, go to the property with the car purchase certificate, download the online State Grid APP as required, fill in the application information according to the prompts, and receive the construction permit certificate. Then go to the business hall to apply for an electric meter. To apply for an electric meter, you need to prepare the following materials:

1) Proof of parking space use right (parking space title certificate or lease certificate, or subscription agreement)

2) ID card of parking space owner

3) Real estate license construction certificate

4) Site photos of parking spaces

If the materials are correct, the other party will sign a contract with you, and then go home and wait for the master of State Grid to contact you for a field trip.

Third: preparation for the construction link.

1. The main state grid will provide you with a survey data after the site survey, focusing on the distance between the power receiving position and the power using position, and prepare cables with corresponding lengths, only cables within1006 years and cables exceeding1000 meters are needed.

2. Some users are free installation services of 4S shops, and generally they will charge service fees. These users communicate well with the 4S shop in this link. Generally, it is free within 30m, and some users over 30m need to pay their own expenses. Please ask clearly in advance.

3. After the materials are ready, you can contact the construction. After the completion of low-voltage construction, the network main equipment of the associated country is connected to the power grid. After the debugging of the charging pile installation program is completed, the whole charging pile installation is completed.