Job Recruitment Website - Property management - Brief introduction of Chongqing Korea center

Brief introduction of Chongqing Korea center

This building is also called: Korea Center.

Urban area: Yubei District

Developer: Hong Kong Hanguo Property Co., Ltd.

I. Project ownership:

Hong Kong Haohui Investment Co., Ltd. is a wholly-owned subsidiary of Hanguo Real Estate Co., Ltd. (listing number: 160 HK0 160), a company listed on the Hong Kong Stock Exchange. Haohui Real Estate (Chongqing) Co., Ltd. is a wholly-owned enterprise invested and established by our company in Chongqing on June 5438+ 10, 2005, and holds all the rights and interests of this project. The registered capital of the Company is USD 654.38+04.3 million, and its business scope covers real estate development, operation and property management.

Second, the project location:

Three. Economic indicators (area and design purpose):

Building area/land area: 26828/21675m2.

Total construction area: 10836 1 m2 (2 floors underground and 25 floors above ground).

These include:

1 layer: 1 1833.06 m2 layer 2: 8489.56 m2 layer 3: 9360.68m2.

Office buildings and business apartments on floors 4 to 25: 58,205.35 square meters.

Club area on the fourth floor: 25 13m2.

1 2 underground garage and equipment room: 20,472 square meters.

Parking spaces: 552

Four. Project status:

Has obtained the construction land planning permit, land property certificate, construction project planning permit and construction permit. The preliminary work was carried out in June 5438+February 2005, and it was officially started in July 2006. On October 30th, 2007, the main structure project was completed and passed the acceptance. At present, mechanical and electrical installation and indoor and outdoor decoration works are under way. It is estimated that the overall completion date is March 2009 and the official delivery date is June 2009. Meet the pre-sale conditions of commercial housing, and are handling the pre-sale permit. Up to now, the civil engineering and general hydropower installation projects have been basically completed, the external curtain wall has been installed with all the keels, the fire water system and smoke exhaust system have been completed, the elevator equipment has entered the site, the fire elevator hall door and track have been completed, the high and low voltage power distribution equipment has been ordered and will be installed in the site at the end of this month, the outdoor project has been installed with sewage pipe network, and the biochemical pool is under construction.

Architectural design: Spanish Marcia Architectural Design Office and Shenzhen University Architectural Design and Research Institute.

General contractor: Chongqing No.3 Construction Co., Ltd.