Simple version of indoor contract

With the deepening of legal concept, the legal effect of contract is increasing day by day, and signing a contract is also one of the best ways to avoid disputes. Do you know what the main contents of the contract are? The following is a simplified version of the indoor contract template (6 in total) that I have compiled for you. Welcome to read the collection.

Indoor Contract Simplified Edition 1 Employer (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, on the basis of equality, voluntariness and consensus, Party A and Party B have reached the following agreement on matters related to Party B's contracting of Party A's family room decoration project (hereinafter referred to as the project):

Article 1 General situation of the project

1, project location:

2, engineering decoration area:

3. Project Type:

4. Contents and practices of the project (see the quotation sheet and construction drawing in Annex I to this contract for details);

5, project contracting way:

□ Party B shall contract the project and all materials.

□ Party B contracts some materials, and Party A provides the rest.

□ Party B only works as a contractor.

6. Project duration (calculated according to actual working days);

Start date: year month day.

Completion date: year month day.

Commencement: After both parties complete the design scheme, the first-phase project payment is in place, and the technical disclosure of the project, the materials and construction personnel arrive at the construction site to start operations, which is regarded as commencement.

Completion: All the contents of the project agreed in the contract are completed, and it will be regarded as completion after the acceptance by both parties and the supervision unit.

7. Project cost: The project cost of this contract is RMB (in words: RMB), and the above price is □ tax included/□ tax excluded.

Article 2 Project supervision

Where the project is supervised, Party A shall sign a project supervision contract with the project supervision company approved by the construction administrative department, and notify Party B of the name, unit, contact information and responsibilities of the supervision engineer.

Article 3 Construction drawings (and pre-evaluation calculation of indoor environmental pollution control)

1, provide construction drawings:

(1) Party A shall provide Party B with the construction drawings (□ and pre-evaluation calculation of indoor environmental pollution control) before the commencement date.

(2) Where Party A entrusts Party B with the design, Party B shall provide the construction drawings (□ and pre-evaluation calculation of indoor environmental pollution control) before the commencement date.

2. The construction drawings (□ and pre-evaluation calculation of indoor environmental pollution control) provided by both parties must conform to the requirements of Code for Indoor Environmental Pollution Control of Civil Construction Projects.

3. Both parties shall sign the construction drawing for confirmation (□ and pre-evaluation calculation of indoor environmental pollution control).

4. Both parties shall not copy or transfer the construction drawings, design schemes and other materials provided by the other party to a third party without authorization, nor shall they be used for projects other than this contract.

Article 4 Obligations of Party A

1. Three days before commencement, on the principle of not affecting the construction, create conditions for Party B to enter the site for construction.

2. Free water supply, power supply and winter heating during construction.

3. Be responsible for the commencement formalities of the property management department and the related expenses that should be paid by the owner.

4. Abide by the rules and regulations of the property management department.

5. Be responsible for coordinating the relationship between Party B's construction personnel and the neighborhood.

6, shall not have the following acts:

(1) Change the main body and load-bearing structure of the house at will.

(2) Open doors and windows on the external wall or expand the size of the original doors and windows, and dismantle the wall connecting the balcony doors and windows.

(3) Pave stones more than one centimeter indoors, build walls, and increase the floor load.

(4) Destroy the waterproof layer of the kitchen and bathroom floor, and tear down the heating, heating, gas and other pipeline facilities.

(5) Other behaviors that force Party B to operate illegally.

7. If the contents listed in the sixth paragraph of Article 4 must be involved, Party A shall apply to the housing management department, and the original design unit or design unit with corresponding qualification grade shall review the safety of the change scheme and issue a written certificate, which shall be approved by the housing management department.

8. If Party A still needs to use part of the living room during the construction period, Party A has the responsibility to cooperate with Party B in safety and fire control.

9. Participate in the supervision of project quality and construction progress, and participate in project data, concealed works and completion acceptance.

Article 5 Obligations of Party B

1. In the construction process, the construction specifications, quality standards, safety operation procedures and fire prevention regulations shall be strictly implemented, and the project contents agreed in this contract shall be completed safely, with high quality and on schedule.

2. Strictly implement the regulations of the municipal construction administrative department on the management of the construction site, ensure the cleanliness of the construction site, and clean up the construction site after daily completion.

3. Provide Party A with the consultation conditions of various written materials such as standards, specifications, calculations and reference prices involved in the signing and performance of this contract through the notification website and unified publicity.

4. If Party A is a minority, Party B shall respect its national customs and habits during the construction.

Article 6 Engineering changes

During the construction period, if it is necessary to change the project contents agreed in the contract, both parties shall reach an agreement through consultation. Both parties to the contract * * * sign a written change agreement, and at the same time adjust the related project cost and time limit for a project. Engineering change agreement, as the basis for completion settlement and extension of construction period.

Article 7 Material supply

1. Party A shall notify Party B before the materials and equipment provided by Party A arrive at the construction site. Both parties shall check and accept the quality of materials and equipment and environmental protection standards, and handle the handover procedures.

2. The building decoration materials provided by both parties must meet the limit of harmful substances in interior decoration issued by the General Administration of Quality Supervision, Inspection and Quarantine, and have qualified inspection reports issued by professional inspection institutions recognized by relevant administrative departments.

3. If one party disagrees with the materials provided by the other party and needs to re-inspect, the inspection fee shall be paid in advance by it; If the materials are really unqualified after testing, the testing expenses shall be borne by the other party.

4. After the materials and equipment provided by Party A are accepted by Party B and the handover procedures are confirmed, Party B is responsible for the storage and quality control in the construction process.

Article 8 Time limit for a project is delayed

1. In case of any of the following circumstances, the construction period will be postponed, and Party B will not be responsible:

(1) Party A fails to provide the starting conditions as agreed in the contract.

(2) Increase of engineering quantity and design change.

(3) Party A fails to accept the concealed works on time.

(4) Party A fails to supply the materials and equipment agreed in the contract on time.

(5) If the water supply or power failure exceeds _ _ _ _ hours due to reasons other than Party B, the construction cannot be carried out within _ _ _ _ days. ..

(6) Party A fails to pay the project payment on time.

(7) The construction period is delayed because Party A or Party A's representative insists on the wrong instructions.

(8) Work stoppage caused by force majeure and other reasons not attributable to Party B. ..

In case of the above situation, Party B shall promptly notify Party A in writing.

2. If the project cannot be completed on schedule due to Party B's responsibility, the construction period will not be postponed; The rework cost of the project quality problems caused by Party B shall be borne by Party B, and the construction period shall not be postponed.

Article 9 Quality standards

1. The project quality shall meet the national standards. If both parties dispute the project quality and indoor air quality at the time of completion and acceptance, they shall apply for certification to a professional testing institution recognized by the relevant administrative department; The expenses related to the certification process shall be paid by the applicant in advance and finally borne by the responsible party.

Article 10 Project acceptance

1 The construction process is divided into the following stages for joint acceptance of project quality:

(1) Material acceptance;

(2) Acceptance of concealed works;

(3) Completion acceptance.

2. After the completion of the project, Party B shall notify Party A for acceptance, and Party A shall organize acceptance within three days after receiving the completion acceptance notice. After the acceptance, both parties shall go through the handover procedures, settle the final payment, sign the warranty, and Party B shall submit to Party A the hydropower transformation drawings of its construction part. ..

3. Before the completion acceptance by both parties, Party B shall be responsible for protecting the safety of finished products and the project site.

4. If both parties fail to go through the acceptance formalities, Party A shall not move in. If Party A moves in without authorization, it will be deemed as qualified, and the losses caused thereby shall be borne by Party A. ..

5. Individual problems such as project quality, indoor air quality, economy, etc. not involved in the completion acceptance can also be settled by both parties through consultation (as an annex to the completion acceptance form).

6. The warranty period of this project is two years under normal use conditions, and the warranty period of the kitchen and bathroom anti-leakage project with waterproof requirements is five years from the date when both parties sign the project.

Article 11 Method of payment for project funds

1. Payment terms:

(1) Party A shall pay% of the total project cost to Party B within days from the date of signing this contract;

(2) When the project progress is halfway, Party A shall pay Party B% of the total project cost;

(3) Party A shall pay the balance of the project to Party B the day after the project is completed and accepted.

2. More than half of the project progress means that all the water and electricity pipelines in the project have been laid, the wall and top foundation have been completed according to the technical requirements, and the basic installation of doors, windows and joinery products is completed as the standard definition project.

3. After the acceptance of the project, Party A shall review the project description submitted by Party B. If there is no objection within two days from the date of submission, it shall be deemed that Party A agrees to pay the final payment of the project to Party B..

4. After all the project payment is settled, Party B shall issue a formal unified invoice to Party A as the project payment settlement certificate.

Article 12 Liability for breach of contract

1. If one party fails to perform its contractual obligations as agreed, causing losses to the other party, it shall be liable for compensation; If you are punished for violating relevant laws and regulations, the ultimate responsibility shall be borne by the responsible party.

2. If one party cannot continue to perform the contract, it shall notify the other party in time, and the responsible party shall bear the losses caused by the termination of the contract.

3. If Party A fails to pay the second and third phases of the project payment within the time limit agreed in the contract without justifiable reasons, it shall pay Party B a penalty of ten thousandths for each day overdue.

Article 13 Dispute settlement methods

Disputes arising under this contract shall be settled through negotiation or by applying to market organizers and consumers' associations for mediation. If negotiation or mediation fails, bring a lawsuit to the people's court where Party B is located.

Article 14 Supplementary Provisions

1. This contract shall come into effect after being signed (sealed) by both parties.

2. After this contract is signed, the project shall not be subcontracted.

3. Both parties may modify or supplement this contract in written form, but if the modification or supplement reduces or exempts Party B from the responsibilities stipulated in this contract, this contract shall still prevail.

4. If the performance of the contract is affected or losses are caused due to reasons not attributable to both parties, both parties shall settle the matter through consultation based on the principle of fairness.

5. If Party B withdraws from the market, the market organizer shall be liable for compensation first; After assuming the responsibility, the organizer has the right to claim compensation from Party B. ..

6. This contract will be automatically terminated upon completion of performance.

Article 15 Other agreed matters

Party A (seal):

Party B (seal):

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Entrusting party (Party A) of indoor contract version 2:

Organizer (Party B):

Engineering project:

Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the facade house. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, this contract (including its annexes and all supplementary contracts) is hereby signed for * * * to abide by.

Article 1: Project Overview

1, project address: _ _ _ _ _ _ _

2. The construction area is _ _ _ _ square meters.

3, the construction content:

1), the removal of the intermediate partition wall shall not affect the original fire fighting and load-bearing columns and beams of the main structure.

2) Decorate the ceiling, dado, floor tile, wood floor and decorative lines of the whole hall without destroying the original ceiling.

3) Add a private room and decorate the hall.

4) Party B shall reasonably plan and decorate the kitchen according to Party A's requirements.

5) The billboard and bar on the facade shall be decorated according to Party A's wishes.

6) A vegetable washing pond, fish pond and sunshade shall be built behind the kitchen.

7) Improve all water and electricity facilities in the store.

4. Project Commencement Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5. Project completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 2: Project Price (amount in words) _ _ _ _ _.

Article 3: The quality requirements for Party B's construction must be strictly in accordance with Party A's requirements.

Article 4 Payment method: After the project is completed and accepted by Party A, the full amount shall be paid.

Article 5: Liability for breach of contract

1. Party B must complete the project within the project period, otherwise Party A has the right to refuse to pay the project payment and hold Party B accountable.

2. If Party B's construction does not meet the quality requirements, Party A has the right to order Party B to take full responsibility.

Article 6: Changes to the Contract: After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation.

Article 7: Entry into force of the contract

1. This contract shall be sealed by both parties and come into force after being signed.

2. This contract is made in duplicate, with each party holding one copy.

Party A (seal):

Party B (seal):

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Client (Party A) of the simplified version of the indoor contract: ID card: _ _ _ _ _ _ _ _ _ _ _ ID card: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contractor (Party B): _ _ _ _ _ _ _ _ _ ID card: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

After friendly negotiation, Party A decided to entrust Party B to lay floor tiles and wall tiles, and signed this agreement for both parties to abide by.

I. Project site

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Room

Second, the formal structure

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Third, the project

1, the floor of the room is paved with _ _ _ _ _ _ _ _ tiles, and the corner line is required to be flat; _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Grinding corners and floor tiles _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. If no details are involved, Party A shall propose a plan and discuss it.

Fourth, the way of contracting.

Party A must, according to Party B's requirements, ensure the materials needed during the renovation period (Party B shall notify Party A in advance) and the lunch supply during the construction period, and Party B shall be responsible for the construction.

Verb (abbreviation of verb) quality standard

The construction quality shall meet the safety requirements, and the decoration quality shall not be lower than the decoration standard of the same building type, which shall be approved by both parties. After the project is completed and accepted, if there are quality problems in Party B's construction within 3 months, Party B shall be responsible for rework and maintenance for free.

Six, the project cost

Materials shall be provided by Party A, and Party A shall pay Party B the renovation labor fee of RMB.

Seven. terms of payment

In order to ensure the project quality, the deposit of RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ After the project is completed, Party A shall pay Party B the labor cost within three days if it meets the above construction project and design requirements upon acceptance.

Eight. This agreement was signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A (seal):

Party B (seal):

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Indoor Contract Abbreviation 4 Party A (Seal):

Party B (seal):

This agreement is reached by both parties through consultation, and both parties shall abide by it. With the consent of both parties, this agreement was drafted by _ _ _.

I. Project:

1, three rooms (two rooms and one living room, hereinafter referred to as three rooms) shall be marked with corner lines, including heating and pipes (the living room shall be symmetrical), and plaster lines shall be marked around the roof to cover the doors and windows of the three rooms; The living room and bedroom are covered with laminated wood floors; Remove the original paint from all rooms, putty from the living room and bedroom, and paint with Nippon paint twice.

2. Put a crossbar at the doors and windows of the balcony, and make a shelf on it according to Party A's requirements (drawings); On the east side of the balcony, a multi-purpose cabinet (shoes below and bookcases above) and a hanging cabinet on the west side are used to cover the balcony, lay tiles and hang C boards.

3, bathroom, bathroom, kitchen tiles to the top, the roof hanging C board; The kitchen floor was tiled and a stove was built.

4. The power supply circuit of the room should be properly adjusted according to the requirements of Party A, and there is a multi-purpose cabinet behind the living room door (shoes are placed below and clothes are hung on it).

5. If no details are involved, Party A shall put forward a plan and discuss it.

Second, the way of contracting:

Party A must ensure the materials needed during the renovation according to Party B's requirements (Party B shall notify Party A in advance), and Party B shall be responsible for the construction. Renovation contract sample of individual residence

Three. Quality standard: the construction quality meets the safety requirements, and the decoration quality is not lower than the decoration standard of the same construction type, which is recognized by both parties.

Fourth, the construction period:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Five, the project cost:

The materials are brought by Party A, and Party A only pays Party B 5,600 yuan for renovation labor.

Terms of payment for intransitive verbs:

After the completion of the project, if Party A meets the above-mentioned construction projects and design requirements after acceptance, the decoration labor cost shall be paid in one lump sum within three days.

Seven, other issues:

The specific requirements of the renovation project shall be put forward by Party A and implemented by Party B. Matters not covered in this agreement shall be settled by both parties through consultation. This agreement shall come into effect as of the date of signature by both parties.

Eight. This agreement is made in duplicate, each party holds one copy, which has the same effect.

Party A (seal):

Party B (seal):

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Indoor Contract Simplified Edition 5 Customer (Party A):

Organizer (Party B):

Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, this contract is hereby signed in accordance with relevant national laws and regulations for * * * to abide by.

Article 1: Project Overview

1, project location:

2. Regarding the project contracting mode, both parties agree to adopt the following (1) contracting mode:

(1) Party B contracts all materials;

(2) Party B contracts some materials and Party A provides some materials.

(3) Party B undertakes the work and Party A undertakes all the materials. Standard contract and total price of house decoration:

4. Start date: YY.

Article 2: Quality Requirements

1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties.

2. The acceptance standard of this project shall be implemented with reference to the relevant provisions of the state.

3. In the process of construction, if Party A has special construction projects or special quality requirements, both parties shall sign a supplementary contract for the increased cost.

4. Party A shall be responsible for the product quality of all materials and equipment purchased by Party A, and Party B shall be responsible for the construction quality. ..

5. If Party A hires a project supervisor, it shall notify Party B before the project starts, so as to facilitate the work connection.

Article 3: Material supply

1. Party B shall clearly price the materials used in this contract in strict accordance with the relevant national price regulations. The materials brought by Party A shall be used in the decoration project stipulated in this contract, and shall not be used for other purposes without Party A's consent ... If Party B uses them for other purposes, Party B shall compensate Party A at double the price of the misappropriated materials.

2. If the materials and equipment brought by Party B do not meet the quality requirements or have different specifications, they shall not be used. If it has been used, all losses caused to the project shall be borne by Party B. ..

3. The materials and equipment that Party A is responsible for purchasing and supplying shall be qualified products that meet the design requirements, and shall be supplied to the site on time. Delayed arrival, postponed construction period and delayed punishment. Pay Party B 10% of the total materials brought by Party A as the management fee. After the materials are accepted by Party B, Party B shall be responsible for keeping them, and Party B shall be responsible for compensating the losses caused by improper keeping.

Article 4: Method of Payment

1. After the contract is signed, Party A shall pay 30% of the project cost; The remaining 70% will be settled by Party A after the project is completed and accepted. Party A's failure to pay on time is a breach of contract, and Party B has the right to stop the construction. If the project price is not settled after acceptance, it shall not be delivered for use.

2. If there is any increase or decrease in the project or need to be changed during the construction, both parties shall sign a supplementary contract, and Party B shall be responsible for the construction change order and notify the person in charge of the construction site. Increase or decrease the project price and settle on the spot.

3. If Party A fails to prepay the project price within the time limit stipulated in this contract, Party A shall pay 1% of the unpaid project price to Party B for each day overdue.

Article 5: Liability for breach of contract

After the contract comes into effect, during the performance of the contract, the party that terminates the contract without authorization shall pay the other party 5% of the total contract amount as liquidated damages. If the actual loss caused to the other party by the unauthorized termination of the contract exceeds the liquidated damages, it shall be compensated.

Article 6: Entry into force of the contract

1. This contract and its annexes shall be sealed by both parties and come into force after being signed. Matters not covered shall be settled by both parties through consultation.

2. The supplementary contract has the same legal effect as this contract.

3. This contract is made in duplicate, with each party holding one copy.

Party A (seal):

Party B (seal):

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A of the sixth edition of the Indoor Contract: (Buyer) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: (supplier) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In accordance with the Contract Law of People's Republic of China (PRC) and relevant national laws, industry standards and norms. Both parties follow the principles of equality, voluntariness, honesty and trustworthiness. Party A and Party B have reached an understanding on this matter and reached the following agreement through consultation: Party A entrusts Party B to manufacture and install the garage door.

I. Contract Price

The total contract price is RMB, totaling RMB (in words) _ _ _ _ _.

Second, product specifications and quantity.

Meeting schedule.

Three. Installation and acceptance

Party A shall provide electricity for installation and related conditions. After the installation is completed, Party A shall conduct acceptance. If Party A fails to organize the acceptance within seven days and has no objection, it will be deemed as qualified, and Party B will go through the completion formalities and settle the project payment.

Fourth, payment and settlement.

Party A shall pay an advance payment of RMB not less than 30% of the total purchase price, and Party B shall begin to perform the contract after receiving the advance payment. After the goods arrive at the construction site, Party A shall pay the balance to Party B in RMB.

Five, product after-sales maintenance

Party B shall be responsible for free maintenance, repair and replacement of spare parts in case of quality problems within one year after normal use from the date of acceptance. Lifelong maintenance.

Other matters of intransitive verbs:

This project is a turnkey project.

7. Party B shall not be responsible for the delay in the construction period caused by irresistible factors (natural disasters, power failure, etc.). ).

Eight. This contract shall come into effect after being signed and sealed by both parties, and it is guaranteed to be implemented according to the agreed terms. If it is necessary to change the contents of the contract under special circumstances, it must be agreed by both parties through consultation. If one party breaches the contract, the breaching party shall bear the losses caused thereby. In case of any dispute, both parties shall settle it through negotiation. If negotiation fails, it shall be accepted and settled by the court of Xingtai City, Hebei Province, where the contract is signed.

Party A (seal):

Party B (seal):

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _