Emergency plan for hospital power failure
In study, work or life, unexpected things may happen. In order to minimize the adverse effects caused by accidents, it may be necessary to make emergency plans in advance. So what problems should we pay attention to when preparing the emergency plan? The following is my emergency plan for hospital power failure, for reference only. Let's have a look.
Emergency plan for hospital power failure 1 1. purpose of the exercise:
Improve the ability to deal with sudden power outages and ensure the normal development of medical work.
Second, the practice content:
Quickly switch the departments that have power failure due to constant 1 transformer failure, and the power is supplied by constant 2 transformer.
3. Exercise time: 31afternoon of May 20xx 13: 30.
4. Exercise site: outpatient building, inpatient building and high-rise room.
Five, emergency command team:
Commander in chief:
Deputy commander:
Working group on intransitive verbs
Team leader:
Deputy team leader:
Team members: Engineering Department and Security Department.
Seven, preparation before the exercise:
Notify all power outage departments of the exercise plan and prepare emergency lights.
Eight. Exercise description:
On May 30th, 20xx, the transformer in the high-voltage distribution room 1 suddenly broke down, resulting in power outages in many departments of the outpatient building, medical technology building and inpatient building. The property engineering department quickly carried out emergency repairs according to the plan. 15 minutes later, the power supply is switched to Chang 2 transformer to restore power supply. (This drill will not affect key departments such as operating room, hemodialysis room and ICU, because these departments are equipped with automatic terminal switching equipment, which can automatically switch to Chang 2 transformer instantly in case of emergency to ensure normal power supply. )
Nine, exercise procedures:
1, the commander-in-chief announced the start of the exercise.
2. The transformer fault light in the high power distribution room 1 is always on, and the staff quickly reports to the logistics support department and the property supervisor, and at the same time carries out emergency repair.
3, the logistics department immediately after receiving the report command security center, using public * * * broadcast system issued a sudden power outage notice, notify the emergency department, ward medical staff to maintain order. Carry out appeasement propaganda in emergency room and elevator to stabilize the mood of patients or their families (implementation of elevator trapped plan).
4. After learning about the property, six staff members of the engineering department were divided into three groups, and entered the high-rise room and the general high-rise room of the guard room and the inpatient building respectively, and switched the power supply transformer from constant 1 to constant 2 to restore power supply, and troubleshooting the constant 1.
5, the elevator class is responsible for the elevator patrol.
6, security is responsible for emergency inspection.
7. Fill in the emergency afterwards and report to the hospital.
X. Precautions:
1, the preparation before the exercise should be sufficient, and the propaganda work should be in place.
2, electrician should switch power supply in strict accordance with the operating procedures.
Emergency plan for hospital power outage II. Work to be done at ordinary times:
(1) The water level of the softening water tank should be above 3 molecules, and the high-level water tank should be filled with water.
(2) The boiler should keep the normal water level.
(3) The power emergency light should be in good condition and have a high-power flashlight for ready use.
(4) Strict equipment inspection system to ensure that the equipment has emergency capability.
2. Emergency measures in case of power failure:
(1) It is necessary to keep calm and judge the accident.
(2) It needs to be judged as a sudden power failure accident of the whole plant, and immediately open the flue gas emergency discharge valve to let the flue gas be discharged from the emergency discharge channel to prevent deflagration.
③ Turn the power supply of all equipment in the electrical cabinet of the central control room to the "stop" position to prevent sudden call and false start.
(4) At the distributor, open the connecting valve from the high water tank to the distributor, and check whether the water jacket next to the feeder overflows. ⑤ Check whether the outlet valve of the high-level water tank is always open, observe the water level in the high-level water tank, and estimate how long the water storage capacity of the high-level water tank can last.
⑥ Turn down and gradually close the cylinder outlet valve to reduce the boiler water consumption.
⑦ Turn down the cooling water replenishing valve of the furnace jacket, the primary cooling water valve of the blanking jacket, the cooling water valve of the top cover of the second combustion chamber and the cooling water valve of the flue, and check whether there is overflow.
⑧ Check the water consumption and water level drop of the high-level water tank, and re-estimate the water retention time of the high-level water tank. Pet-name ruby check silo, silo material level, silo iron bar, prevent silo burning through. Attending contact power plant, ask about the power outage, and determine the time to restore power supply.
If it is necessary to report to the leader, report to the leader the site situation, emergency measures, power plant power outage feedback information and existing problems.
Always monitor the boiler water level, whether the water in each jacket overflows, the water stored in the high-level water tank, the cylinder pressure, the drum pressure, the field situation and the power failure.
3. Measures after the call:
(1) Conduct a comprehensive inspection on the equipment of the whole plant, make sure that there is no major loss, and prepare to resume the system operation. ② Turn the power supply of the electric cabinet equipment in the central control room to the "automatic" position, start the induced draft fan, and purge the flue of the production line to restore the flue to the negative pressure operation state. Close the emergency smoke exhaust valve.
(3) Start the circulating water pump to replenish water to the high water tank. When the high-level water tank is full, close the connecting valve between the water distribution cylinder and the high-level water tank, restore the opening and closing degree of the water distribution cylinder to each water jacket valve, and ensure that there is enough cooling water to cool the water jacket.
(4) Start the boiler feed pump to feed water to the boiler.
⑤ After everything is normal, restore the normal combustion of incinerator and secondary combustion chamber, and restore the normal operation of medical waste incineration treatment system.
Emergency plan for hospital power outage 3 I. Setting purpose
In order to deal with the sudden large-scale power outage accident in the hospital, quickly and orderly organize the restoration of power supply, ensure the safety of patients, reduce property losses, ensure the smooth use of electricity in the hospital, and promote the institutionalization and standardization of accident emergency work, this plan is formulated in accordance with relevant national laws and regulations and the actual situation of our hospital.
Second, the scope of application
The term "sudden large-scale power outage accident" as mentioned in this plan (hereinafter referred to as "large-scale power outage accident") refers to the damage or destruction of important facilities caused by serious natural disasters, which leads to sudden failure of safety lines of large-scale power system in the whole hospital and large-scale paralysis or collapse of power grid.
Third, the emergency principle.
The principle of "prevention first and constant vigilance" and the principle of "unified leadership, perfect mechanism, clear responsibility, strengthened cooperation, quick response and decisive measures" are implemented in dealing with large-scale power outage accidents.
Fourth, organization
The hospital has set up an emergency leading group for large-scale power failure accidents and an emergency repair team.
1, emergency leading group for large-scale power failure accident in hospital
Team leader: general manager
Deputy Head: Dean
Member: Manager of Personnel Administration Department
Logistics Supervisor
Electrical maintenance responsibility:
(1) Do a good job in daily safe power supply, implement the responsibility system for safe production, and prevent accidents caused by large-scale power failure.
(2) In case of large-scale power failure, do a good job in emergency treatment of power failure and restore power supply as soon as possible.
(3) According to the severity of the large-scale power failure accident, decide to start and terminate the emergency plan.
(4) Report the accident to the superior in time and make it public.
(5) Request external support when necessary.
(6) The leader of the leading group is the first person responsible for fulfilling the provisions of this plan. Under the unified command of the leading group, all member units should carry out their duties and cooperate with each other to do a good job in social comprehensive emergency work in case of large-scale power failure.
2. Emergency maintenance team
Captain: logistics supervisor
Member: Electrical Maintenance Worker
Responsibilities: Organize personnel to carry out rescue in case of accident; Report the accident to the command team, send help to the power supply department when necessary, and summarize the experience and lessons of emergency rescue work afterwards.
Verb (abbreviation for verb) emergency procedure
(A) the logistics department electrician class emergency procedures
1, emergency procedures for planned power outage
(1) When an electrician receives a call from the power supply company or other forms to notify the power failure, he must ask about the time of power failure, how long it will stop, and the reasons for the power failure, and make records. If he is not in this shift, he should be handed over clearly.
(2) Notify the leader of the emergency leading group (notify the chief attendant at midnight), explain the power outage reason, specific power outage time and how long it will take to stop, and make preparations for the standby second power supply.
(3) During normal working hours, if time permits, the Personnel Administration Department will issue a written notice to all departments.
Model essay on emergency plan for hospital power failure
(4) If the time is urgent, notify the leader of the emergency leading group immediately after receiving the notice from the power supply company (notify the chief attendant at night) to explain the situation, and the personnel administration department will send a notice to all departments. Important departments should tell the head nurse, director of the department, when to stop sending electricity and make a plan for stopping sending electricity.
(5) Go to the transformer room 30 minutes before the power failure, and make a preliminary inspection of switching the standby secondary power supply. In case of power failure, the standby second power supply should be started within 15 minutes and supply power normally.
(6) Stop all passenger elevators at 10 minutes before power failure.
(7) When the external network is out of power, start the power supply of the generator to ensure the power supply of key departments such as the emergency department of the operating room.
(8) Make a good record of the operation of the standby second power supply and the record after the commercial power is restored.
2, temporary power outage emergency procedures
(1) In case of temporary power failure, you should immediately call the power supply company to find out the reason and duration of power failure.
(2) Inform the emergency team leader or shift supervisor to explain the situation.
(3) If the power outage time is short (within 10 minute), wait for the mains supply before sending the high and low voltage piezoelectric devices.
(4) If the power outage lasts for a long time, immediately prepare to switch the standby second power supply.
(5) When the dual power supply cannot be started for various reasons, the standby generator should be started as soon as possible to ensure the power supply of key departments.
(6) Record the operation of the standby second power supply.
(7) When there is a power outage due to internal reasons in the hospital, it is necessary to find out the cause of the power outage, whether it is a high-voltage circuit or a low-voltage circuit. If the high-voltage circuit fails, the hospital electrician will immediately introduce the standby power supply, and should contact the emergency repair class of the power supply department in time to recover as soon as possible to ensure the electricity consumption; If the hospital mortgage circuit fails, it is necessary to quickly find out the reason and restore the circuit according to the operating procedures.
(2) departmental emergency procedures
1. After receiving the power outage notice, all departments should cut off all power supplies and put them into use after the circuit returns to normal.
2. After receiving the power outage notice, immediately prepare for the power outage. If there is a rescue patient, use the backup power supply.
3, after a sudden power outage, immediately find a power outage method to rescue the patient and its operation, maintain the rescue work, and turn on the emergency lights, etc. And shall promptly notify the electrician or the person in charge on duty.
4. Patients who use a ventilator in critically ill patients' surgery should usually put a simple ventilator next to the machine. Once the power is suddenly cut off, the medical staff will immediately disconnect the ventilator and use a simple respirator to maintain breathing. For patients who use electric nitrogen absorption, use a 50ML syringe to connect the nitrogen absorption tube to absorb nitrogen.
5, such as double line suddenly power failure, before the hospital generator power supply, medical staff should first ensure the patient rescue; Nurses should be calm. Those who go to the ventilator should hold the ball, those who go to the monitor should measure their blood pressure and pulse manually, and those who go to the electric nitrogen inhaler should take a 50 ml syringe and suck it with a nitrogen suction tube. Observe carefully and ask for change. The remaining employees should immediately call the electrician and personnel administration department and use emergency lights for lighting.
6, strengthen the patrol ward, appease patients, and pay attention to fire prevention and theft.
7. After the elevator encounters a sudden power failure, the logistics personnel should do a good job in the ideological work of passengers, make a phone call to the outside world, and manually release all passengers.
Safeguard measures of intransitive verbs
1, the electrician should do a good job in the daily maintenance of the generator to ensure that the generator is put into use at any time.
2. Electricians should master power supply knowledge and operation specifications at ordinary times, and pay attention to operation safety.
3, clinical departments are routinely equipped with emergency lights, flashlights and other lighting objects, regular inspection, keep in good condition.
4. The logistics department should organize emergency power failure drills, twice a year 1-2 times. Through drills, be familiar with the emergency handling procedures of sudden power failure to ensure the safety of patients.
;
- Previous article:How many years will Zunyi Poly have in the future?
- Next article:What is the sales service hotline of Shanghai Huazheng Business Building?
- Related articles
- How many years is the property right of Chongqing He Yi's ideal city?
- In view of the owner's intentional damage to the property access control system and refusal to pay the property management fee, how can the property send a letter to inform the owner? How to write the
- What about Luoyang Yuexiang Property Management Co., Ltd.?
- Who knows how many kilometers it is from Nanning, Guangxi to Chengdu, Sichuan?
- Is Shanghai Zhongzhi Xuhui Human Resources Co., Ltd. a state-owned enterprise?
- Subordinate enterprises and management units of Southwest Ordnance Industry Company
- Who is responsible for the burning out of the electricity meter, and what is the basis for paying the electricity bill?
- What is the telephone number of Jinchang Baye Medical Happiness E Marketing Center?
- What is the telephone number of Tongchuan Central Gong Yuan (Store) Business Department?
- What is the telephone number of the private sales office of Huaibei Guogou Plaza?