Effectively prevent coal mine water disasters in rainy season and ensure the safety of coal mines in the province. The following is my 20 17 rainy season three prevention work plan, welcome to read!

20 17 rainy season three prevention work plan 1 In order to do a good job in the rainy season of 20 17 in Quanqi Coal Mine? Three defenses? Work, conscientiously implement the "Emergency Notice of the State Council Safety Committee on Further Strengthening Work Safety in Flood Season" (Office of the Safety Committee [17]1/No.), to ensure the safety of coal mines in flood season in the whole flag, and in combination with the actual situation, this plan is formulated.

One is to strengthen organizational leadership.

Strengthen the rainy season in coal mines? Three defenses? Organize and lead the work, improve the working system, and set up the rainy season of flag coal mine? Three defenses? Work leading group, members are as follows:

Team leader: folding navy

Deputy Team Leaders: Zhao Yaozhong and Feng Jiang.

Members: Hu, Li Xiangbing, Zhang Xiaodong, Li Zhimin, Ren, Dabboura Gan, Gao Chuan, Luo Hucheng.

The leading group is specifically responsible for organizing, coordinating and supervising the three defenses in rainy season in coal mines.

Second, the overall requirements

According to the relevant regulations and the characteristics of safe production in rainy season in coal mines, each coal mine enterprise studies and formulates a targeted and feasible rainy season plan. Three defenses? Work implementation plan. All coal mines are required to report their rainy season three prevention plans to the Flag Coal Bureau for the record.

Third, pre-flood investigation.

Before the arrival of the flood season, Quanqi Coal Mine should conduct a comprehensive and detailed investigation of hidden dangers of water disasters, focusing on:

(1) Preparation for rainy season? Three defenses? Work plan and implementation plan, establish and improve the post responsibility system and management system for mine water disaster prevention and control.

(two) to conduct a comprehensive inspection and maintenance of the mine drainage system, pumps, pipelines, electrical control equipment should be kept in good condition, adequate accessories, and joint debugging, to ensure that the mine drainage capacity meets the specified requirements.

(three) to conduct a comprehensive excavation of water storage, ditches and so on. , to ensure the effective volume.

(four) to conduct a comprehensive inspection of the flood control and drainage system of the industrial square around the mine.

(5) Inspect and test the lightning protection devices of ground buildings, power distribution stations, power supply lines, derricks, monitoring and other facilities, conduct preventive tests on power supply and transformation facilities such as main transformers and underground cables, and check the electromechanical protection of power supply system to ensure sensitivity and reliability.

(six) the completion of the pump room, substation, flood control materials warehouse and other important places on duty, the implementation of the personnel on duty, to maintain smooth communication.

(seven) the mined-out area is easy to accumulate water and the overlying strata have confined water.

Fourth, supervise implementation.

We must resolutely overcome the idea of carelessness, carry out regular inspection activities continuously in flood season, and strictly inspect coal mines in rainy season? Three defenses? Implementation of the work plan and various measures. Coal mines should be confirmed in strict accordance with all kinds of water disasters? Five realization? Make rectification. In rainy season, water disaster prevention measures are not strictly implemented, and all coal mines with major water disasters will be stopped (built) for rectification.

Verb (abbreviation of verb) emergency management

All coal mines should strengthen communication with meteorological, flood control and other departments, timely grasp the meteorological early warning and forecasting information, and must stop production and evacuate people in case of extreme weather such as heavy rain. Every time there is a rainstorm in a coal mine, professionals should be sent to observe hydrological changes and ground subsidence to ensure safety before resuming production. Establish and improve the rainy season? Three defenses? Special emergency rescue plan, and exercise before the flood season.

20 17 rainy season three prevention work plan 2 this year, the extreme weather such as rainstorm and lightning in rainy season in our city has increased, posing a serious threat to coal mine safety production. In order to effectively cope with the impact of extreme weather and ensure the safe production and construction of coal mines in the city, relevant matters are hereby notified as follows:

First, strengthen organizational leadership and arrange deployment in advance.

Provincial coal mines, county (district) coal management departments and municipal coal mines should fully understand the rainy season of coal mines? Three defenses? The extreme importance of work, persistence? Who's in charge? Who's in charge? Principle, strictly implement the regulatory responsibility of the regulatory authorities and the responsibility of coal mine safety production. Strengthen the rainy season? Three defenses? Organize and lead the work, dispatch duty and investigate underground water disasters, firmly establish the awareness of advance prevention, resolutely overcome paralysis and luck, base on flood control and disaster relief, and plan, prepare and deploy early. Should all departments and coal mines set up a rainy season? Three defenses? Leading group, set up a flood fighting and emergency rescue team, reserve enough emergency rescue materials, make the task clear, the responsibility lies with people, and take their respective responsibilities to ensure the safety of coal mines in flood season.

Two, highlight the key points of prevention and control, comprehensive investigation and management.

(a) to strengthen the basic work of mine hydrogeology, find out the catchment and leakage of surface water system in the mining area and its vicinity, the water volume and water pressure in the old kiln, goaf and other areas prone to water accumulation in the mining area, and determine the water warning line, especially the integration of technical transformation mines. Integrating mine hydrogeology and roadway layout must be accurately drawn on underground control chart and mining engineering plan.

(two) improve the mine drainage system, the underground pumps, pipelines, transmission lines and other facilities to conduct a thorough investigation; Strengthen the maintenance of alleys, stone gates and main inclined lanes, and clean ditches and water silos to meet the needs of mine drainage. And conduct an emergency drill of underground drainage system before the flood season. If the drainage system is not perfect, stop production and construction immediately.

(3) Do a good job in lightning protection and improve lightning protection and grounding facilities, including lightning protection and grounding of cables, pipelines, tracks and belt racks entering the well, and insulating plywood of tracks entering the well; Strengthen the inspection of mine power supply lines, prune or cut down the trees that affect the safety of power supply lines, overhaul the pole-Tara line in place, strengthen the observation of landslide areas around towers, and take immediate measures to deal with the danger when it is found, so as to ensure the normal power supply of power transmission lines; Substation and all kinds of relay protection, lightning arrester, etc. It must be sensitive and reliable to prevent lightning from damaging various facilities, and the staff must standardize the operation of the substation and wear necessary protective tools.

(4) For coal mines located near surface rivers, mountain torrents and reservoirs, dams and ditches should be built at wellhead and industrial square to prevent surface water from flowing back into the mine. When there is water leakage in surface water body, coal mining subsidence area and outcrop of coal measures strata. Therefore, it is necessary to carry out anti-seepage reinforcement treatment for the basement of the leaking water body. Strengthen the prevention and control management of raw coal piles and gangue piles, dredge ditches, build flood control ditches, and prevent storms and floods from washing away coal piles and gangue piles.

Should we strictly follow the hidden dangers found in the safety inspection? Five realization? (measures, responsibilities, funds, time limit, plan), timely and thorough rectification, eliminate hidden dangers.

Third, strengthen emergency measures and increase monitoring.

(a) seriously study and formulate the rainy season? Three defenses? contingency plan

It's rainy season everywhere? Three defenses? As the top priority of water prevention and control work, the rainy season was revised in strict accordance with the requirements of "Regulations on Water Prevention and Control in Coal Mines" and combined with the characteristics of coal mine safety production in our city. Three defenses? Emergency plan. Should the emergency plan include the rainy season? Three defenses? Leading organization, project management plan, inspection and test plan, emergency rescue team organization, emergency rescue plan, emergency rescue material reserve, leadership duty plan, communication methods and security measures, etc. At the same time, it is necessary to do a good job in education, training and drills of emergency plans and give full play to the role of the plans.

(2) Strengthen the rainy season? Three defenses? Emergency management work

All coal mines should further strengthen contact and communication with meteorological, flood control and other departments, timely grasp the flood warning and forecasting information, establish and improve the disaster weather warning and disposal mechanism, do a good job in emergency material reserves, and achieve special inventory and special personnel management. In case of the following dangers, the production must be stopped immediately, and the personnel should be evacuated first, and then the reasons should be analyzed: First, it is located by the river, reservoir or low-lying place during the rainstorm; Second, there is obvious leakage in ditches, river beds, potholes, shafts and subsidence areas. , resulting in abnormal recharge of surface water underground; Third, the underground water inflow suddenly increased and there was an abnormal situation; Fourth, there are other dangers that endanger the safety of underground workers.

(3) Strengthen coal mine safety supervision and inspection.

All units should resolutely overcome paralysis and do a good job in rainy season? Three defenses? Supervision and inspection work, focusing on the rainy season? Three defenses? Implementation of work plan, analysis of water situation and flood disaster, implementation of various measures, progress of the project, and on-duty scheduling. During the flood season, we should adhere to the uninterrupted inspection route and carry out regular inspection activities. City coal bureau will be on the rainy season of coal mines? Three defenses? Supervise the work. Informed criticism will be conducted for coal management departments and coal mining enterprises with poor work, slow action and many problems. At the same time, surface water is a serious threat; The hydrogeological conditions are unclear, and no water exploration and drainage measures have been taken. The design of underground waterproof gates, retaining walls and other water prevention projects is unreasonable, the construction quality is problematic, and other major water disasters have not been effectively prevented. Ordered all mines to stop production and rectify.

The fourth is to do emergency duty to ensure flood control safety.

(a) all departments and units should establish and improve? Three defenses in rainy season? Dispatching duty and leadership duty system must ensure smooth communication for 24 hours, and ensure timely response, decisive decision-making and effective response according to the emergency plan in case of danger.

(2) Will there be rainy season in provincial coal mines, county coal management departments, Chemei Group and Guantun Coal Mine? Three defenses? Please submit the duty list and contact telephone number to the Municipal Bureau before June 12.