Supplementary agreement of construction contract
With the popularization of legal knowledge, there are more and more interest disputes about contracts, and signing contracts is an important measure to reduce and prevent disputes. What is the contract you have seen? The following is a sample of supplementary agreement of construction contract that I collected for you, hoping to help you.
Supplementary Agreement to the Construction Contract 1 The following supplementary agreement is reached through negotiation between Party A and Party B:
I. Overview of the Project
1, project name: Jiangsu Liang Yong 1# factory building.
2. Address:
3. Building area: 72,000 square meters.
4. The frame structure has two layers.
Second, the project content and contract scope:
1. Party B undertakes the general construction contract of this project, including contract scope, foundation, main body, decoration, etc.
2. Party B shall not use Suqian local migrant workers in the construction of this project. If local migrant workers are found to be used, Party B will handle any accidents by itself, and Party B will be responsible for any accidents in the whole construction process, and Party A will not bear any economic responsibilities.
3. The increase or decrease of the project caused by the design change within the contracted scope of Party B shall be negotiated by both parties.
Three. Payment terms:
1. After receiving the notice of commencement from Party A, Party B enters the site for construction, and the construction process of this project. Party A does not pay the advance payment.
2. The payment for this project is 30% of the total project price after the 1# workshop is capped, 60% of the total project price after the second floor is capped, 80% of the total project price after the indoor floor is completed, 95% of the total project price after the completion acceptance, and the balance is used as the quality guarantee, which will be used normally two years after the house is completed.
3. Party B shall be responsible for the consequences of the wage riots of migrant workers in this project, and Party A shall not bear the responsibility and pay the wages of migrant workers and any other expenses.
Four. Commencement and completion dates:
Commencement and completion: In case of water cut, power failure, local government policy adjustment and force majeure, the construction period will be postponed.
Verb (abbreviation of verb) liability for breach of contract:
All materials of this project (cement, steel bars, concrete test blocks, water pipes and wires) must be removed from the acceptance report before the next working procedure can be carried out. If the construction is brutal and the circumstances are serious, Party A can unconditionally let Party B go out. Party B's completion date is 5,000 yuan ahead of schedule, and it will be rewarded every day. If the construction period is delayed, it will be fined 5,000 yuan every day.
This agreement is made in duplicate, one for each party, and shall come into force after being signed.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Supplementary Agreement II to the Construction Contract Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws, regulations and rules, both parties, following the principles of equality, voluntariness, fairness, honesty and credibility, enter into this agreement through consultation for mutual compliance.
1. Because Party B has projects outside the contract during the project construction.
Second, the contract content:
1, water exchange pipe
Step 2 ditch
3. Isolation pier
4. Remove the temporary network
Three. Contract quantity: see annex 1.
Four. Total contract price: 2365438 yuan +0.235 yuan. (In words: two hundred and thirty-one thousand two hundred and thirty-five Yuan only)
Verb (abbreviation of verb) payment method: implement the original contract terms.
This agreement is made in quadruplicate, three for Party A and one for Party B, which shall come into effect after being signed and sealed by both parties, and automatically become invalid after the project is completed and accepted.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Supplementary Agreement III to the Construction Contract Party A: _ _ _ _ _ _ _
Party B: _ _ _ _ _ _
Subject matter of the agreement: Party A's room in "_ _ _ _ _ _", hereinafter referred to as the subject matter. Through friendly negotiation, both parties sign the following supplementary agreement on matters not covered in the construction contract (ContractNo.: 2005) of family room decoration project. : _ _ _ _ _ _, hereinafter referred to as "renovation contract") is signed by Party A and Party B on the target room. As an annex of renovation contract, this Supplementary Agreement has the same legal effect as renovation contract.
A, construction personnel standards:
1. During the construction, Party B's construction personnel shall work hard and shall not drink or spit in the target room. If construction workers smoke, they must stay away from inflammable and explosive materials.
2. Party B's construction personnel shall not use the facilities and equipment installed in the target room (such as cooking utensils, sanitary ware and other facilities and equipment) (except water, electricity, cooking utensils and sanitary ware provided by the construction personnel).
3. Party B's construction personnel shall not cook with naked fire, and shall not pile tableware, leftovers and discarded objects on the materials. Tableware, leftovers and discarded items should be sorted out immediately after meals.
4. Party B shall set up a special garbage dump to clean up the garbage in time and keep the room clean and hygienic.
5. After the floor and floor tiles are installed, Party B's construction personnel must wear soft-soled shoes to construct in the target room, and it is strictly forbidden to directly place sharp or corrosive items that are easy to pollute the floor and floor tiles. All items should be handled with care, and it is forbidden to drag items on the floor and floor tiles.
6. Party A may deduct _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7. If Party A's facilities, equipment and bedrooms are damaged due to the fault of Party B or its construction party, or the facilities, equipment and bedrooms of third parties such as residential quarters and property management companies are damaged, Party B shall be responsible for compensation or deduction from the project payment, and bear all responsibilities.
8. Party B shall pay attention to safety during construction, and Party A shall not be responsible for any casualties caused by improper operation of Party B. ..
Second, materials.
9. It is stipulated in the contract that all materials provided by Party B shall not be unpacked before acceptance (except materials that need not be unpacked), and they must be accepted by both parties on the spot after arriving at the target room, and can be unpacked only after being approved and signed by Party A according to the name, quality, quantity, specification and grade specified in Schedule 5 of renovation contract. If the materials delivered by Party B are not in conformity with the contract, Party B must take replacement and remedial measures.
10. Party B shall show Party A the purchase voucher (invoice or shopping list), environmental protection certificate, warranty, material source, instructions and other relevant materials for the materials provided by Party B, and Party A has the right to verify the authenticity of the materials with the manufacturers or distributors. If the materials are found to be fake and shoddy, Party B must replace them with the products indicated in the contract and compensate Party A at twice the price indicated in the contract; If Party B can provide legally recognized evidence, which fully proves that it is the supplier's responsibility, Party A can appropriately reduce the compensation amount according to the specific situation, and Party B can pursue the corresponding responsibility from the material supplier.
1 1. If the quality and specifications of materials provided by Party B cause engineering quality problems, Party B shall make up for them through replacement, supplement and repair; If it cannot be made up, Party B shall make compensation in other ways, and Party A may deduct the project payment according to different circumstances; Due to the quality and specifications of the materials provided by Party B, Party B shall be responsible for compensation or deduction from the project payment, and assume all responsibilities.
12. Party B promises to be responsible for the quality of the materials purchased by Party B, and be responsible for the maintenance and replacement during the warranty period of the decoration project. Under the normal use of Party A, Party B shall bear all the responsibilities for any losses caused by the quality problems of materials provided by Party B. ..
13. If the materials agreed by Party B in renovation contract cannot be purchased or delivered to the target room due to special circumstances such as market shortage, Party B must replace the materials with the same or higher quality, grade and specification, and sign and agree with Party A.
14. After the materials provided by Party A and Party B enter the target room, Party B must stack the materials in a proper place and keep them properly. If the materials are deteriorated, deformed, damaged, lost or lost due to improper storage, Party B must replace, supplement and compensate according to Party A's requirements.
15. Party B has no right to change the information provided by Party A without authorization. If problems are found, Party B shall promptly raise them with Party A, and Party A shall take remedial measures such as replacement and supplement. If Party B has confirmed and used the materials provided by Party A, and then disputes the quality of the project, Party B shall not refuse to repair or compensate the unqualified materials provided by Party A.. ..
16. If Party B causes abnormal losses to the materials provided by Party A, Party B shall be responsible for compensation.
17. In the annex of renovation contract, all _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Third, architecture.
18. Party B must provide Party A with a written project schedule and a list of materials purchased by Party A on the project disclosure date, that is, _ _ _ _ _ _ _ _ _ _ _.
19. Before the start of the construction project, Party B and its designers should train the foreman and workers on the design ideas and key points of the project.
20. After the construction starts, the quality inspection personnel of Party B shall keep abreast of the project status and progress.
Situation, at least every three days to Party A's target room to check the engineering situation, and make a written registration. Party B's quality inspection personnel must strictly implement the quality inspection system, and the relevant acceptance forms must be complete, which will serve as one of the references for Party A's acceptance.
2 1. During the construction, Party B is obliged to explain the construction method to Party A, and the construction can only be started after Party A confirms it. If there are any problems that do not meet Party A's requirements after construction, without Party A's confirmation, Party B shall unconditionally rectify and compensate the losses caused thereby.
22. If there is any problem with the project quality, Party B shall immediately correct it after Party A puts forward it. If Party B fails to correct in time according to Party A's requirements, the project payment will be deducted according to different situations.
23. If the construction personnel violate renovation contract and this supplementary agreement, and the circumstances are serious, Party A has the right to propose to replace the foreman or workers, and Party B shall replace them the day after Party A's request.
24. When installing facilities and equipment, Party A shall confirm the installation location before installation. If there are any problems that do not meet Party A's requirements after installation, Party B shall unconditionally rectify them without Party A's confirmation.
25. After the contract is signed, if Party A puts forward design modification opinions and reduces engineering projects in the construction process, it must contact Party B in advance and inform Party B, and the two parties can only carry out engineering change construction after signing a change order for the decoration and decoration of family houses and determining the change amount and related procedures.
26. Party B's construction personnel must remove the decoration garbage to the designated place of the property. The garbage removal fee has been included in the project payment, and Party B will not charge it separately.
27. During the circuit construction of Party B, the wiring shall be reasonable, and the lines passing through the same place shall be wrapped with the same pipe or sheath line. The construction length shall be calculated as a single pipe, not separately.
28. Tiles must be completely soaked for 12 hours before they can be used.
29. Floor tiles are caulked with caulking agent, and the caulking agent is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
30. When painting the wall paint and finish paint of all parts in the target room (including living room, master bedroom, auxiliary bedroom, study room, storage room, corridor and balcony), if it is necessary to remove the original surface putty, Party B will not charge extra; Brush the same brand primer as the top coat 1 time, and brush the top coat twice.
3 1. All wall paints are in _ _ _ _ _ _ _ _
32. Before painting, Party B shall confirm the water mixing ratio of Party A in writing. If painting is carried out without Party A's confirmation or the process is improperly used, and the water mixing ratio exceeds _ _ _ _ _ _%, Party A has the right to request the same type of paint to be repainted, and relevant expenses shall be borne by Party B. ..
33. All doors and door covers are made of _ _ _ _ _ _ _ brand putty.
Fourth, the project acceptance
34. For all concealed works, Party B's construction personnel can only carry out subsequent construction after Party A's acceptance and signature.
35. The project quality acceptance shall be carried out in accordance with the Regulations on Quality Acceptance of Family Decoration Engineering and the Standard for Quality Acceptance of Family Room Decoration Engineering. During the project quality guarantee period, if there are quality problems due to Party B, Party B shall be responsible for all the repairs. If it cannot be completely repaired, Party B shall compensate the losses according to the corresponding part of the project cost.
36. After the completion of Party B, Party A has the right to test the air quality of the house. The indoor air quality of Party A's target room shall be independently tested by a nationally recognized indoor environmental quality testing unit, and the test report (including formaldehyde, voc, etc.) shall be submitted. ) sent by the unit to Party A. If the test results are unqualified, Party B shall be responsible for improving the unqualified items within the specified _ _ _ _ days until they reach the qualified standards, and the expenses involved shall be borne by Party B. ..
Verb (abbreviation for verb) to pay
37. The renovation deposit charged by the property is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The fine deducted from the deposit of the property shall be deducted by Party A from the deduction, and the remaining part shall be returned to Party B, and the insufficient part shall be made up by Party B.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ refers to any one of _ _ _ _ _ _ _ _ _ _
38. The renovation management fee charged by the property is _ _ _ _ _ _. The management fee increased due to the delay of Party B's responsibility shall be paid by Party B in full. At the same time, Party B shall pay for the construction personnel's pass.
39. The budget prepared by Party B should fully consider the actual workload of Party A's project, and the settlement of project funds should be based on the actual project length (area and volume), not the amount of materials. According to the actual project length (area and volume), after each project is completed, Party A will accept the project payment, and Party A will sign the quality and area acceptance in writing as the basis for payment of the project payment.
40. If the engineering quantity changes during the interim payment, the changed project will be settled in the interim payment, and the rest will be settled at the time of completion acceptance. If it is necessary to inspect or discuss disputed issues with Party B due to the quality of construction projects or other problems, the settlement date may be appropriately postponed.
4 1. When signing this contract, the deposit paid by Party A to Party B is RMB _ _ _ _ _ _ _ _.
Intransitive verbs warranty and others
42. Party B promises to guarantee and maintain the whole project for three years from the date of project completion acceptance. Party B shall respond within 2 hours after receiving the repair call from Party A and arrive at the site within 48 hours. If Party A fails to propose a solution within 48 hours after Party B applies for maintenance due to the quality problems of construction or materials provided by Party B, if Party A solves the problem by itself, all expenses incurred by Party A shall be borne by Party B.. ..
43. After the completion of the project, Party B must submit to Party A an electrical completion sketch and a pipeline sketch, indicating the wire specification, the direction of concealed pipes, the direction and position of pipes, valves and interfaces. After Party A signs for it, the completion settlement can be carried out.
44. Matters not covered in this contract shall be settled by both parties through friendly negotiation. If negotiation fails, it shall be submitted to the relevant departments for arbitration.
45. This Supplementary Agreement was signed by Party A and Party B on. Three originals, one for each party, one for each party. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party A (signature): _ _ _ _ Party B (seal): _ _ _ _ _ _
Representative of Party B (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
;
- Related articles
- What about Qihe Jinyi Property Management Co., Ltd.?
- What is the telephone number of Zhongshan Huahaiwan Marketing Center?
- Is Danyang Jinxiu Xicheng a resettlement house?
- What is the telephone number of the marketing center of Chengdu Rongchuang Kaixuan Mansion Store?
- The car is posted by the property. Can I complain about the property if it is not clean?
- What is the telephone number of the sales department of Donghai Tianyi Bureau?
- The light in the unit corridor is broken. After private maintenance, the lamp was taken away. Who should I call?
- Where is the address of Qingyuan Tianyuan Country Garden?
- What are the survival chances of several commercial complexes in Hexi, Nanjing?
- When will Taiyuan Baoliyue Mansion deliver the house?