Job Recruitment Website - Property management - Summary of the first half of the year: 1000 words, 5 essays.
Summary of the first half of the year: 1000 words, 5 essays.
This semester, under the specific guidance of xx and the competent leaders, the Finance Department has firmly established a sense of service and always focused on service teaching. Constantly strengthen financial management and improve service quality. With the joint efforts of all comrades in our department, the tasks set at the beginning of the year were successfully completed. The main work is summarized as follows:
First, further establish and improve the financial reimbursement system and maintain financial discipline.
1. At the beginning of the new semester, the finance department will rotate the positions of cash cashiers and toll collectors according to regulations, re-divide the work and implement post responsibility management. Accounting personnel have a clear division of labor, so that everything is managed by someone, everyone has a full-time job, and everyone is responsible.
2. Continue to strictly implement the Interim Provisions on Financial Management in Colleges and Universities, strictly examine and approve financial reimbursement procedures, and adhere to the financial management system of "unified leadership and centralized management". Strictly implement the "one pen" financial examination and approval system. All expenses are handled in strict accordance with the financial system to ensure the rationality and legality of each expenditure. It ensures the smooth development of teaching work, greatly improves the efficiency of the use of funds, and achieves the purpose of increasing income and reducing expenditure.
3. Carefully control and supervise the implementation process of the school budget. According to the approved budget, submit the fund use plan in time. All revenues and expenditures are spent separately in strict accordance with the expenditure methods approved by the budget, and the seriousness of the budget is earnestly maintained.
Two, strengthen the management of extrabudgetary funds, adhere to the management system of two lines of revenue and expenditure.
1. Collect, write off and use special bills for administrative fees according to _ _ _. Organize income according to law, strictly implement the price policy, and charge according to the standard.
2, strictly implement the management of two lines of revenue and expenditure, all kinds of expenses paid in full and on time to the financial accounts. In the first half of the year, * * * completed the business expenses of xx million yuan, all of which were turned over to the financial special account in full.
3, in accordance with the requirements of the municipal government's special inspection of non-tax revenue "two lines of revenue and expenditure", the income of xx years and xx years was self-examined, and the non-tax revenue self-examination form of municipal departments and units was reported in time.
Three. Formulated and promulgated the Measures for the Implementation of Fixed Assets Management of xx Technician College.
In order to facilitate the daily management and effective use of the college's fixed assets, ensure the safety and integrity of assets, and prevent the loss of state-owned assets, this method is formulated in a comprehensive and detailed inventory of the college's fixed assets in xx years. Standardize the management of fixed assets of the college.
Fourth, actively do a good job in tuition collection.
1, xx During the Spring Festival, people have come to the school to pay fees one after another. Comrade Corey can be on call without arranging duty in the college, which ensures the normal charging work. By the end of xx years, the number of new students paying fees was xx, and none of them owed money.
2. Relying on the Student Affairs Office, majors and class teachers, urge the students of grade xx and xx who owe money in the spring to make a collection, and the collection rate reaches over xx%, thus completing the collection task assigned by the college.
Five, conscientiously do a good job in the management of the college's external rental of facade houses.
At the beginning of X, with the approval of the leaders, the Finance Department issued a notice to all tenants to renew the lease contract and increase the rent of some facade houses. And according to the actual situation of the college, a new housing lease contract was formulated. It lasted for x months and ended in the middle of x years. The signing of the new contract strengthened the management of the college's external rental, increased the rental income and ensured the timely and full collection of rent and utilities.
Six, conscientiously do a good job in medical insurance and housing provident fund management services for faculty and staff.
Timely handle the collection and payment of retired teachers and teachers' personal housing provident fund, medical insurance inquiry, loss reporting and other services.
Seven, do a good job in the issuance of state grants.
At the beginning of X, the financial department actively raised funds when the national grant did not arrive this semester, and distributed the national grant of xx yuan to students in the first semester of xx for Class X and xx people who came back from overseas internships.
Eight, equipped with accounting software, the implementation of accounting computerization.
Contact with _ _ _ accounting department and accounting school, install accounting software, and X will try it out, so as to make preparations for computerized accounting.
Nine, complete the students leave school internship and employment procedures.
Timely complete the collection of tuition fees, extra books and travel expenses for the second year of internship for two batches of X class students. I have gone through the employment and school leaving procedures for Class xx and Class xx.
X. Main problems
1, individual employees' business loans cannot be reimbursed in time and are in arrears.
Few students owe money.
3. Service awareness needs to be further strengthened.
4. The original invoice is not standardized.
XI。 The direction of future efforts
1, continue to strictly implement the college budget management system, strengthen budget constraints, and strictly implement the cash and bank settlement system. Handle various expenses according to regulations, scientifically and reasonably arrange university funds, and strive to improve the efficiency of fund use.
2. Try to get rid of manual bookkeeping next semester and use computerized accounting to improve work efficiency.
3. Continue to establish the concept that management is service, further enhance service awareness, continuously improve service quality, and integrate management into various services. We will truly implement our real service in all our work.
2. Work summary for the first half of the year 1000 words.
In the past six months, under the leadership and supervision of the higher authorities, with the joint efforts of all colleagues and under the guidance of the essence of the' Yinwan' brand, Yujingcheng Service Center has earnestly carried out its work around the company's quality requirements and successfully completed the work in the first half of the year. The summary is as follows:
I. Maintenance
When the rainy season comes this year, all the vacant houses in the community will be inspected and the problems found will be handled uniformly. Ask the customer service staff to sort it out, and then report it to the engineering department in time, and ask someone to carry out maintenance. Due to the timely report, the rainy season did not cause more serious leakage problems.
For all corridors in induction lamp, the damage is frequent because of voice control. After the plumber chooses the pedestal with better quality and material, the loss is obviously reduced.
Second, security.
In the first half of the year, with the concerted efforts of all security guards, Qi Xin successfully completed the security work in the residential area. However, with the gradual deepening of the work, the shortcomings and defects of community security have gradually emerged, such as poor supporting facilities, low quality of personnel and insufficient professional knowledge. To this end, a major security innovation was carried out in May. At first, the elimination system was implemented, and the security guards who were not serious in their work, poor in discipline and older were eliminated. The innovation of work has brought the external image of security to a new level. Although my mistakes brought some troubles to the company in this process, I don't regret it for the normal operation of the whole community. Secondly, in terms of self-management, I insist on holding a small meeting every Monday and Friday and a general meeting every half month to exchange and review. At the same time, carry out professional knowledge training. In April this year, the plumber participated in the professional training of fire safety technology and management held by the county fire center, and organized all security guards to learn with the courseware prepared after learning. At the same time, organize all security guards to conduct military training every Monday and Friday.
In the management of foreign personnel, our security department patrols 24 hours a day, and all visitors are registered to ensure the property and life safety of the community owners.
Third, clean.
The cleaning of this residential area strictly abides by the rules and regulations of the management office, strictly implements the cleaning procedures, and cleans the public * * * area and the corridors of all units in the residential area all day. In strict accordance with the requirements of the company's quality department, clean the trash can and handrail unit door regularly to create a clean living environment for the community owners.
In order to improve the service quality by leaps and bounds, the training of post personnel has been strengthened, and the ability of staff to implement community rules and regulations has been significantly improved. However, due to some employees' short working hours and poor service awareness, sometimes employees do the right thing, but they still cause complaints from the owners. To this end, the service center will form a typical case, put it in the booth to organize learning and educate employees to pay attention to ways and means. After half a year's efforts, the service awareness and problem-solving ability of all employees have been greatly improved.
The above is a summary of the work of this service center for half a year. We are well aware that there are still some shortcomings in the service work. Compared with other service centers. The gap is still very big. Corresponding problems in the future work, we will also foster strengths and circumvent weaknesses, strive to overcome and correct, and strive to make greater contributions to the company.
Four. Work plan for the second half of the year
1. Cultivate the market and establish brand awareness.
2. Summarize the work experience in the first half of the year. Do a good job in the owner's return visit, increase publicity and improve the visibility of our enterprise.
3. Cooperate with developers to do all the work.
4. Establish a strict security system in combination with the actual situation of the community.
5. Improve daily management. Carry out convenience work to improve household satisfaction.
3. Work summary for the first half of the year 1000 words.
In 20xx, we focused on the construction goal of "13 10 project" proposed by the municipal party committee and municipal government, closely followed the 20xx target task book, decomposed and implemented it layer by layer, and made every effort to promote the construction of important infrastructure. The main work completed in the first half of 20xx and the work for next year are summarized as follows:
First, accurately locate new projects.
Our department actively connects with the departments of development and reform, land and planning, actively communicates and coordinates, and includes a number of projects involving improving the road network structure, ensuring people's livelihood projects and optimizing public transport layout in this year's government investment projects. In 20xx, there were 39 traffic infrastructure construction projects in the city, and the annual planned completion was 1, 7 1, 36 1, 000 yuan, including 3 continuation projects, 5 newly started projects1,6 land acquisition and demolition projects, and1research and demonstration projects.
Second, quickly promote the preliminary work of the project
Taking advantage of this function optimization, our department innovated management, centering on the goal of "early start, early completion and early benefit", and on the basis of taking measures such as special person in charge, whole-process tracking, interlocking and step-by-step follow-up, we continued to track the responsible units of the project, closely contacted the horizontal departments, and made joint efforts to break through the project approval. It is estimated that 9 projects will be completed by the end of June, accounting for 50% of the plan, and the operating rate will reach 67%.
Third, controllable construction and continued construction projects
(1) continuation project
1. Phase I reconstruction of Zijin Road: the construction scale is 2.4 kilometers long and 27.5 meters wide. Most of the preliminary work and construction bidding have been completed. At present, the procedures for land supply in South Gate have been completed, and the procedures for land supply in Lingang Development Zone are being processed. After completion, construction can be started.
2. Bund Bus Terminal: Bund Bus Terminal is located in the west of Muyugang Road and north of Central Landscape Avenue, with a total land area of 327 1 m2. The construction management service room is 237 square meters, and the parking space and greening are about 3000 square meters. The preliminary procedures such as planning and site selection and land approval have been completed. At present, the approval of the scheme has been completed, and the construction bidding procedure will be entered at the end of June. It is planned to start construction in July and be completed and put into use this year.
3. Expansion of Xinhua Station Parking Lot: Xinhua Station Parking Lot is located in the north of Yanling Road and the west of East Outer Ring Road, with a total land area of about 20xx square meters. The construction of bus parking spaces is about 20xx square meters. At present, it has entered the construction bidding procedure, and construction started at the end of June, and it will be completed and put into use during the year.
(II) Newly started projects
1, Jiangyin Furong Avenue Expressway construction: the reconstruction scope is from Haigang Avenue to Keji Avenue, with a length of 19+06 km. At present, the preliminary work of the rapid transformation of Furong Avenue is in full swing. Stability assessment, planning and site selection, environmental assessment, land pre-examination and construction feasibility have been completed, and preliminary design is being carried out in an all-round way, and preliminary work such as pole line pipeline relocation is being started in an all-round way. Construction started in June and is expected to be completed and opened to traffic by the end of 20xx.
2. Jiangyin section of 2.S340 provincial highway: 2.42km wide (including Yungu line 1.502km and Xisha line 0.9 18km). The preliminary work such as project feasibility study, planning and site selection, land pre-trial and construction drawing review has been completed. At present, the construction drawing design has been approved, and the land is now submitted for approval in Wuxi. It is planned to start construction simultaneously with Xishan District and Huishan District of Wuxi City.
3. East extension of Xinhua Road in xinqiao town: 0.98km long, and the implementation scope is from Xinyang Road to Xitang Highway in Zhangjiagang. The construction drawing design has been approved, and the land use approval is being processed.
4. Reconstruction of xinqiao town West Ring Road and South Ring Road: 2.3 18km long, and the scope of reconstruction is the intersection of Xinqiao South Exit-South Ring Road and Changxin Avenue along the Yangtze River Expressway-Xinmin Road. Open construction bidding is under way, and construction is planned to start in June.
5. Reconstruction of Huang Zhu Road: 3.387 kilometers long, with the reconstruction range from Yungu Line to Changshan Avenue. Preliminary design is being submitted for approval. According to the approval of the municipal government, Zhutang Town is the main body of the project.
6. Reconstruction Project of Zhongkang Bridge on Zhang Shen Line: This project is located in Huaxi Village, Huashi Town. The bridge was reconstructed according to the third-class waterway standard, with a bridge width of 22 meters, a main bridge length of 198.2 meters and an approach bridge length of 120 meters. Invested and built by the Provincial Waterway Bureau, the scheme research is currently under way.
7. Reconstruction of Maodang Road: 6.05km long, and the reconstruction scope is from Jinan Avenue to Qinglong Bridge. At present, Zhutang Town is making budget adjustments to the National Development and Reform Commission. According to the approval of the municipal government, Zhutang Town is the main body of the project.
8. Reconstruction of Ding Long Road in Nanjing Middle School: length109m, and the scope of reconstruction is from Furong Avenue to the entrance of Nanjing Middle School. The construction drawing design has been approved, and it is planned to start in Nanjing Middle School in the summer vacation, starting in July and completing in August.
9. Large and medium-sized repair of Yungu line: the length is 30.5 1km, and the implementation scope is from the old city line to Xisha line. At present, the work has been approved.
10, dangerous bridge reconstruction project: the dangerous bridges detected in the whole city are reconstructed, and the work permit has been approved at present.
Four. 20xx work plan
1. Make every effort to promote the rapid reconstruction project of Furong Avenue, coordinate all the work, and ensure the orderly progress of the project construction.
2. Cooperate with the preliminary work of Jiangnan intercity railway construction and actively promote the preliminary work of Yantai-Yi Xi railway.
3. Complete a number of road network improvement projects such as Zijin Road, Xinqiao West Ring Road and South Ring Road Reconstruction, Maodang Road, Dangerous Bridge Reconstruction, Qian Fan Road Reconstruction Project, and Urban Road Medium Repair; Complete a series of key livelihood projects such as the first and last bus stations on the Bund, the parking lot expansion of Xinhua Bus Station, the third phase of public bicycles, and the fourth phase of Jiangyin bus electronic stop sign.
4. Start the large and medium-sized repair of Yungu Line, the expansion project of Shashan Road and Qian Fan Road, the Jiangyin section of S340 Provincial Road, the eastward extension of Xinhua Road and the construction of Huang Zhu Road.
Suggestions on verbs (abbreviation of verb)
1. It is suggested to strengthen the municipal high-level coordination and promotion mechanism, strengthen territorial responsibility and implementation, coordinate Lingang Street to complete land supply procedures as soon as possible, and ensure that Zijin Road reconstruction can successfully complete the project construction task.
2. The intercity railway along the Yangtze River will start construction at the end of 20xx. It is suggested that the municipal government organize relevant departments to further study the investment and financing, suggestions, operation management mode, Jiangyin comprehensive hub station construction and comprehensive land development of our city's railway construction.
4. Work summary for the first half of the year 1000 words.
The first half year of 20xx has passed. Since this year 1 month, we have actively responded to the company's call, actively cooperated with monopoly administrators, deliverymen and telephone interviewers, worked hard to do a good job in the jurisdiction, and basically completed all the assessment indicators, all of which were improved compared with the same period last year. The summary report of the work in 20xx is as follows:
I. Main Work
1, pay close attention to adjusting the cigarette structure and strive to increase the proportion of cigarettes outside the province. During the usual visits, cigarettes from outside the province were put on the counter, and the newly-launched "Lanzhou (Soft Treasure) and Lanzhou (Soft Flying)" were emphasized on cigarette packaging, taste, price and other aspects, which not only allowed retailers to further understand the characteristics of these cigarettes from outside the province, but also allowed consumers to know more about brand cigarettes from outside the province, thus increasing the sales ratio of cigarettes from outside the province.
2. Strengthen the construction of retail terminals. Since accepting the new district, we have actively promoted the construction of "retail terminal" to retail households, helped customers visit cigarette counters one by one, designed and helped to display customers' full samples; It increases the overall sample area and quantity of cigarettes, increases cigarette advertisements, and effectively improves the publicity effect of cigarettes.
3. Customer complaint hotline has been publicized in place. At the same time, inform every retailer in the jurisdiction of your mobile phone, so as to communicate with retailers, find problems in time and solve them.
4, actively do a good job of cigarette agreement. Adhere to the reasonable and quantitative supply of cigarettes, treat the agreed quantity and service equally, regularly remind retailers to make preparations before ordering, improve the accuracy of orders, and consolidate the price tag of cigarettes.
5. Always contact and communicate with the majority of law-abiding cigarette retailers to gain their trust, so as to gain a deeper understanding of the market situation and provide decisions for the company's business development and operation.
Second, the existing problems
1, weak business knowledge. Neglecting to learn business knowledge on a daily basis, with a weak sense of learning, and failing to perform well in the customer manager skill competition organized by the Municipal Bureau in June; In daily work, I ignore the study of business knowledge and think that what I have learned can basically meet the current work situation, and I don't take the initiative to learn relevant business knowledge and skills to improve myself, which leads to unsatisfactory work and many mistakes;
2. Neglect self-management. In daily work, I tend to be formal and don't think about innovation; Work attitude is not serious, self-management is neglected, there is no strict requirement of high standards and high requirements, and work is not serious and sloppy, which leads to many mistakes in daily work.
There are many mistakes in the retailer's cigarette order. At present, the region mainly orders food online, and most of its customers are rural customers. Therefore, since March, there have been many customers with unsuccessful orders, and the analysis mainly includes the following States:
(1), the deposit was not made in time, mainly because some customers failed to save enough money in time due to busy farming, which led to the failure of orders.
(2) The amount of the deposit does not reach the amount required by the order. The main reason is that some customers failed to save enough money because they were not operated by their own talents.
(3) The customer who ordered by telephone did not answer the phone in time. Because some customers' telephone numbers changed frequently, they didn't contact me in time, which led to some materials not being maintained in time and the order failed.
As an account manager, I didn't take the initiative to collect the basic information of customers in time and maintain it in the system in time, which led to the failure of customer orders.
4. Business guidance to retailers is not in place.
Since 1 month, the cigarette business guidance for cigarette retail customers has been incomplete. From the end of June to 1 month, * * * held four seminars for business owners, and the training coverage rate reached 98%. However, the training of new products for customers is relatively poor, and the over-the-counter drug rate is relatively low. The number of OTC brands of remote customers is only 7 or 8, and the number of OTC brands does not meet the requirements of the company.
Three. Work plan for the second half of the year
1, strengthen their own business knowledge learning. Use all spare time to strengthen the study of business knowledge, and make study notes, change passive learning into active learning, improve their business knowledge and skills, and improve their quality. At the same time, we should strengthen our own management, set strict demands on ourselves with high requirements and standards, correct our work attitude, and conscientiously complete daily affairs.
2. Strengthen the maintenance of basic data. Since this month, I have asked myself to maintain the basic information of customers who change every day when I come back from a market visit, and review it at least once after maintenance to prevent the mistakes in maintaining basic information.
3. Further do a good job in electronic settlement, remind cigarette retailers to take the initiative to order, save enough money in time, strengthen communication with customers with frequent problems, and make the electronic settlement rate and order success rate reach a new level.
4, do a good job of retail cigarette price tag replacement. At present, retailers have many new brands of cigarette price labels, which need to be updated in time during next month's market visit.
5. Strengthen the cigarette business guidance for business households, introduce the newly introduced cigarette brands in the second half of the year, introduce the characteristics of cigarettes in detail, introduce the "selling points" of cigarettes to customers, and ask customers to "copy" them to consumers.
6. Strengthen customer visits, visit customers on weekends and holidays, sit down face to face and communicate with customers, help customers to do a good job in cigarette display and business guidance, recommend cigarette brands suitable for the jurisdiction for OTC sales, and improve the OTC rate of cigarette brands.
The above is a summary of my work in the first half of 20xx. I understand that no matter how good you say it, you must put it into action. I told myself that I must do well in the future.
5. Work summary for the first half of the year 1000 words.
I have been working for more than half a year. In this half year's work, I have studied and studied technology seriously, and my ability and ideological quality have been continuously improved and improved. Under the care of the company and the team, I have changed from a student who has just entered the society to an enterprising power plant operator.
Since the beginning of this year, from my job responsibilities, I am very grateful to the company leaders and team members for their support and help, so that I can practice what I have learned in textbooks and learn what I can't learn in school. These achievements are inseparable from the help of leaders and team members. We will summarize our work in the past six months:
First, work conscientiously and responsibly.
I am loyal to my job and love my post. I use the company's philosophy to demand myself, treat others with integrity, do things in a down-to-earth manner, obey the arrangement of the leaders, stick to my post when the team is short of people, work hard, have difficulties in customer service, check carefully, never let go of any tiny equipment defect on site, and notify the team leader as soon as possible when problems are found, thus avoiding the occurrence of major equipment accidents. I have always treated my work with a positive attitude, especially during this year's minor repairs, working for _ days _ hours continuously. Although it was hard, I learned something that I couldn't learn when normal equipment was running.
Second, study hard technology, study hard theory, and learn the operating rules by heart.
In practice, strictly abide by the operating rules, cultivate the correct operating ability, ensure that no misoperation accidents occur, record the problems encountered in the work, experience gained and matters needing attention at any time, and humbly ask the master for advice. Although I have worked independently, I know that it takes time to hone and accumulate knowledge if I want to learn operational knowledge thoroughly and step by step and make myself stronger day by day.
After work, don't forget to use books, internet and other resources to supplement yourself, so as to broaden your horizons, continue to charge and supplement your own shortcomings. At the same time, after the unit entered the winter operation, the company strictly grasped the employees' lack of safety awareness of the unit's winter operation and organized each team to learn. Through organizing training, I realized my lack of technical knowledge and inspired me to study harder in the future.
Third, strengthen coordination ability and accident handling ability.
If "technology" is compared to "intelligence quotient", then "ability" is compared to "emotional quotient", and so is operation. A high IQ is not necessarily high, because technology is dead and ability is alive. Half a year's work experience tells me that only life and study can work better.
Fourth, accumulate work experience and implement the company's "energy saving and consumption reduction"
On the basis of qualified water quality, excellence and safe operation are the first, and economic operation should also be taken into account. If the water quality of the auxiliary engine is not harmonious, the sewage should be started in time to make the water quality qualified in the shortest time, and the chemical personnel should be contacted in time to check the water quality. Once qualified, the drain valve of auxiliary water tank should be closed quickly, which not only ensures the safe operation of the unit, but also reduces the waste of auxiliary water.
Five, in half a year's work, I also realized my own shortcomings.
For example, lack of on-site equipment operation and technical knowledge, and sometimes lack of safety awareness. In the future study, I will improve my learning enthusiasm and initiative, let myself grow into a qualified inspector as soon as possible, strengthen the company's study and cognition of safety regulations, and make efforts for the safe operation of the unit!
- Related articles
- What community does Shenzhen Valley belong to?
- What is the floor area ratio of Jinhua Royal Garden in Jinhua Greentown?
- The water card in the community is lost. Can you reissue it?
- A man was fired from the company because of his funeral. What are the bitter stories of the bottom workers?
- How about Hangzhou Yucheng Property Management Co., Ltd.?
- How about Haining Branch of Hangzhou Ideal Siwei Property Management Co., Ltd.?
- The company's annual work summary begins.
- What about the facilities around the dormitory of Langfang Civil Affairs Bureau?
- Detailed information of communities in Evian County
- Which service is better, China Resources Property or Vanke Property?