Job Recruitment Website - Property management - Tender for landscaping project
Tender for landscaping project
Project Name: Hydrological Landscape Engineering
Project leader: She Guangsheng
Tenderee: Xianning Changqing Greening Co., Ltd.
Date of preparation: June 23, 2004 +65438.
Xianning Changqing greening seedlings co., ltd
March system in 2005
Part I: Bidding Quotation and Power of Attorney
1, tender offer
2. Power of attorney
3. Quality Commitment Letter
Bid submission
Xianning Hydrological Bureau Office:
Our unit has studied the bidding documents, drawings and other related materials of your unit's hydrological garden greening project, and has made a site survey. It is now formally put forward that we are willing to contract the construction task of hydrological landscaping project with the total contract price of RMB yuan, and agree to carry out the construction in accordance with the drawings, contract terms, construction details and bill of quantities of this project and other relevant clauses in the bidding documents.
Once we win the bid, we will guarantee to start the construction preparation according to the requirements of the tender, and ensure that the whole project will be completed and handed over before June, 2005 10. At the same time, pay the performance bond (5% of the contract amount) and the project risk of mortgage (10% of the contract amount) as required.
Our bid is valid for 3 days from the date of bid opening in 2005. During this period, the bid is still binding on us, and we promise not to change the total bid amount and accept the bid at any time.
The bid bond is within the validity period of the bid. If we withdraw our bid or do not attend the bid opening ceremony, or modify the total bid amount after the bid opening, or refuse to sign the contract within 2 days after receiving the letter of acceptance, the bid bond may be confiscated by you.
We understand that you do not guarantee that the bidder with the lowest quotation will win the bid. We agree to bear all the expenses arising from this bid until the contract agreement is signed.
Tenderee: Xianning Changqing Greening Seedling Co., Ltd.
Legal representative:
Relevant personnel:
Unit address:
Contact telephone number:
Date: March 30th, 2005
letter of attorney
Xianning Hydrological Bureau Office:
This is to certify that the entrusted manager (resident ID number:) is the entrusted agent of our company, signing bidding documents, negotiating, signing contracts and handling all matters related to hydrological landscaping projects on behalf of our company. The original signature is shown at the end of this authorization.
Authorized entrusting unit:
Legal representative:
Entrusted agent:
Date: Year Month Day
Quality commitment letter
Xianning Hydrological Bureau Office:
If our unit is lucky enough to win the bid for the hydrological landscape greening project, we will carefully organize and strengthen management according to the commitments in the tender, and organize the construction in strict accordance with the contract and the current stacking specifications. We promise to accept the supervision, inspection and guidance of your unit and its superior competent department; Fully understand and cooperate with the relevant requirements of the owner; Seriously fulfill the terms and agreements of the construction contract; Obey the instructions of the supervision engineer, ensure the quality of the project with high-quality service, and pursue Excellence.
If the project quality is unqualified, defective or quality accidents occur due to our poor work or mistakes, we are willing to bear all the responsibilities that the construction unit should bear, and accept the reasonable punishment proposed by your unit and the superior competent department.
Commitment:
Legal representative (or entrusted agent):
date month year
Part II: Quotation of Engineering Quantity (Budget)
1, plant planting quantity quotation
2. Quotation of landscape construction quantities
3. Power installation quantity quotation
4. Quotation of quantities for sprinkler irrigation installation
Quotation of plant planting quantity
Serial number name unit quantity unit price total price
total
Quotation of landscape engineering quantity
Serial number name unit quantity unit price total price
Quotation of electric power installation quantities
Serial number name unit quantity unit price total price
Quotation of quantities for sprinkler irrigation installation
Part III: Construction organization design
I. Overview of the Project:
This project is located in the north of Liangcun Township, A County, and all civil works are in the project area. This tender project includes: 0/2 bridges, 22 culverts and 65 motor wells.
(1) Bridge design: The design load of production bridge is 1 steam-15,9 steam-10,2 steam -6, and the structural form is bored pile cover plate.
(2) Well design: concrete pipe with inner diameter of 350mm and depth of 80- 100m.
Second, organization.
In order to do a good job in the construction of this project, our company set up a project management department, which is composed of personnel from the company's powerful construction experience research office and implements the management system of project manager responsibility system. The project department has a project manager 1 name, an assistant project manager 1 name, a chief engineer 1 name, and several other corresponding technical and management personnel. With the project department as the core, there are engineering department, quality inspection department, security department, equipment supply department, finance department and office. Engineering department is responsible for site construction technology, positioning and setting out of the whole site; The quality inspection department is responsible for strictly controlling the quality of each working procedure, the quality inspection and test of the project, etc. The security department is responsible for the safety production, security and civilized construction of the whole project site. The Equipment and Materials Supply Section is responsible for the procurement, supply and management of equipment, materials and spare parts. The production department is responsible for project scheduling and construction personnel arrangement, and the office is responsible for logistics supply, staff life and handling local relations; The finance department is responsible for the allocation of funds, cost accounting and supervision. There are five professional construction teams under the Ministry, each team is equipped with special and construction machinery and equipment, so as to improve the level of mechanized construction as much as possible, and complete the project with high quality and efficiency by scientific means, advanced technology and perfect management.
See the attached figure for the specific organization block diagram:
Third, the construction schedule
1, construction progress control
On-site mobilization time: before 20041October 1 1; Commencement time: 165438+2004 10/; The completion date is 1 20th, 2005.
2, the division of the project schedule
See the construction schedule for details (attached)
Part IV: Other information
1, company profile
2, the company's engineering performance
3. Company certificate, license, etc.
4、
company profile
Hubei Xianning Evergreen Greening Seedlings Co., Ltd. was established in 1979 on the basis of Xianning Tree Seedling Farm, the introduction and domestication base of South Subtropical Tree Species of the State Forestry Administration. Now we are specialized in the production, cultivation, sales and landscaping services of green seedlings, and have the national second-class landscaping qualification.
Our company is located in Xianning, Hubei, the hometown of osmanthus in China. It has built more than 800 acres of introduction demonstration bases and introduced more than 600 kinds of domestic and foreign tree species. Nursery base/kloc-0.2 million mu, including 400 mu of osmanthus characteristic nursery, 300 mu of Magnoliaceae nursery and 0.2 million mu of Aceraceae nursery. At present, the number of small and medium-sized seedlings in the city is 1 10,000, and the demonstration forest base has various high-quality green seedlings such as osmanthus fragrans, Cinnamomum camphora, Michelia alpina, Liriodendron chinense, Michelia Lechang, Michelia multiflora, Liquidambar formosana, Koelnut, Sapindus mukoraiensis, Photinia glabra, Picea and Sapium sebiferum. , over 65,438.
Our company has strong greening construction ability, and has successfully completed many greening projects such as Yichang Dongshan Avenue, Yichang Nanhu Park, Shiyan No.2 Automobile Factory Highway, Wuhan Shenlong Company Training Department, Xianning Sports Center, Xianning Municipal Government Building, Xianning Procuratorate and chibi city No.2 Water Plant.
Over the years, thanks to the love of colleagues and friends from all walks of life and the joint efforts of employees, the company has operated well, and will continue to take "quality, service and reputation" as the foundation of its survival and development, and will certainly provide our customers with better seedling products and better services.
- Related articles
- Property Telephone of Jinshui Building in Baohe District
- Hengyang Technician College Address
- Which property company manages Guangzhou Jinbi Emerald Hua Ting? How much is the property fee?
- Is Dalian Vanke Metropolis Donggang a rough house or a fine decoration?
- Is it convenient to communicate in Acadia? How should I get there?
- Is Australia a state-owned enterprise or a private enterprise?
- What about Xi AXA Lingboxing Property Management Service Co., Ltd.?
- What does it mean to sweep the floor on the Internet?
- What does the service charge include?
- Tianjin Jinnan district Hongsheng Jia Wei communication equipment business department recruitment information, Tianjin Jinnan district Hongsheng Jia Wei communication equipment business department?