Job Recruitment Website - Property management - Who will pay for the electricity generated during the renovation?

Who will pay for the electricity generated during the renovation?

In general, the owner should be responsible for the water and electricity costs during the renovation. This part of renovation contract shows that if the decoration company exceeds a certain limit, it will also bear the corresponding expenses, which is different in renovation contract and the basis is different.

As one of the basic preparations for decoration, the preparation for hydropower transformation is directly related to the comfort and safety of living in the future. After the renovation project is completed, the surface of hydropower project is mostly invisible and intangible, and once there is a big hidden danger, the loss is also relatively large.

From the aspect of design ideas, we must grasp the principle of paying equal attention to safety and comfort, so as to be targeted and avoid late losses.

Extended data:

Matters needing attention in hydropower decoration of new house,

Shielded cables should be used for weak current, and re-slotting and wiring are needed for the layout of secondary decoration lines. Most of the strong and weak current pipelines can only be taken from the ground, and it is common for strong and weak current pipelines to cross and parallel at close range. If the weak current uses unshielded cables, it may cause signal interference.

Precautions for hydropower decoration of new house 2,

The circuit wiring design principle grasps the principle of "the shortest distance between the two ends", and does not intentionally wire, keeping a relatively "live line".

Matters needing attention in hydropower decoration of new house,

In principle, if the high-voltage electric pipe provided by the developer is PVC pipe, PVC pipe should be used in the secondary hydropower transformation, and JDG pipe (tightly sheathed galvanized steel pipe) cannot be used, otherwise it will be difficult to realize the overall grounding connection, leaving future troubles. If the high-voltage electron tube provided by the original developer is JDG tube, both can be used.