Model building decoration contract

A, building property management including decoration management, by _ _ _ _ _ _ property management.

2. Decoration application: For indoor decoration, the owner and user shall submit the following materials to the building property management 15 days before the decoration enters the site:

1. Decoration scheme;

2. Decoration materials, such as ceiling, partition wall and floor;

3. Wiring diagram of lighting system and power supply;

4. Water supply and drainage system requirements;

5. Central equipment systems that need to be built or changed;

6. Check the location of the maintenance exit;

7. Ceiling plan;

8. Each facade;

9. Window and signboard design (including font and logo design).

Third, the examination and approval of decoration scheme

property management

Fourth, the decoration deposit

In order to ensure that the garbage will be cleaned up during decoration, the equipment and facilities used in the building will not be damaged, and the decoration management regulations will not be violated. The owner and user must pay a certain decoration deposit, and the deposit standard depends on the number of decoration, but each room (store) should be at least _ _ _ _ _ _ _ _. After the renovation project is completed, it will be managed.

Five, decoration supervision fees and utilities

Owners and users should manage the decoration project.

Insurance of intransitive verbs

In order to prevent losses caused by accidents that may occur during the renovation, the management

Seven, head of fire prevention

The owner and user shall designate the person in charge of the decoration construction unit as the person in charge of fire prevention, and sign the fire prevention responsibility letter.

Eight, decoration construction responsibility commitment

Before the decoration application is approved, the owner and the user shall sign the commitment letter of decoration construction responsibility and promise to abide by all the terms listed in this decoration guide.

Nine, decoration construction permit

Owners and users shall abide by civil engineering laws and regulations; Submit the renovation plan, pay the renovation cost, sign the letter of commitment and manage.

Ten, decoration work began.

After the owner and user receive the decoration permit, they can apply for the construction personnel pass and the materials are transported in. The renovation project can begin.

XI。 Decoration acceptance

After the renovation project is completed, the owner and user shall notify the manager in writing.

Twelve. Decorative code

The interior decoration of the owners and users must comply with the following provisions:

...

Thirteen. Summary of decoration procedure

1. Collect decoration guides, questionnaires, drawings, etc.

2. If necessary, request management.

3. Submit the drawings and technical data of the renovation plan, the completed commitment letter and questionnaire, the expenses to be paid and the renovation deposit to the management.

4. Collect the approval of the decoration plan.

5. Manage the list of construction personnel.

6. The renovation project has begun.

7. After the renovation project is completed, notify the management personnel in writing.

8. Manage the final inspection of company personnel. If the renovation project meets the requirements of the management company, it can be notified to recover the balance of the renovation deposit.