Job Recruitment Website - Property management - The whole process of self-decoration
The whole process of self-decoration
The design of the new house must be based on your own living habits, and the room should be measured in detail, including:
(1), decoration area, especially tile area, wall paint area, wallpaper area, wallpaper area and floor area;
(2) Wall size, especially the wall size of furniture to be designed in the future.
The second step of house decoration: main body demolition and transformation
The main demolition and transformation mainly includes wall demolition, wall building, wall skin, window sealing and so on. In the building plan, the walls marked in black on the engineering drawing are all load-bearing walls, and the walls marked in white are non-load-bearing walls. Non-bearing walls can be rebuilt and demolished.
The third step of house decoration: hydropower transformation
Before the hydropower transformation, the demolition and transformation of the main structure should be basically completed. Between hydropower transformation and main demolition, the first test of the cabinet should also be carried out.
Some foreign owners believe that some main materials should be brought into the site before the renovation begins. In fact, unless it is the main material needed for the main demolition and reconstruction, the main materials such as tiles and plates will enter the site after the hydropower transformation, because if the circuit transformation involves slotting on the ground, the tiles and plates will be improperly stacked, which will make it very troublesome for workers to walk around.
The fourth step of house decoration: tile laying
Bricklayers, carpenters and painters are the basic order of appearance, and the principle is that whoever is dirty will go first. In the process of bricklayer's operation, the installation of the following two links is involved:
(1), installation of lintel and marble window sill;
② Floor drain installation. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. (3) after the kitchen wall and floor tile are pasted, the cabinet can be measured for the second time.
The fifth step of house decoration. Woodworking installation.
After bricklaying, it is carpentry, bag supervisor, decorative ceiling, plastering line, wine cabinet, shoe cabinet and so on. But don't forget to operate on the protected floor before starting these processes to prevent the pasted tiles from being damaged!
The sixth step of house decoration: painting the wall.
Painters enter the site, mainly to finish the basic treatment of the wall, paint the finish, and brush the furniture made by carpenters. The owner who is going to paste wallpaper only needs to let the oiler do the basic treatment on the wall that plans to paste wallpaper.
The seventh step of house decoration, water heater installation.
After the wall and floor decoration is completed, you can inform the water heater to deliver and install. Water heaters are usually installed in front of the ceiling.
The eighth step of house decoration: ceiling of kitchen and bathroom
At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp, exhaust fan and yuba of the kitchen and bathroom should have been bought.
The ninth step of house decoration: cabinet installation
After the ceiling is completed, cabinets can be installed on the door, and the sink and gas stove are also installed.
The tenth step of house decoration: install range hood and cooker.
The installation of the range hood can be arranged as far as possible on the same day as the cabinet installation, which is convenient for the master of both parties to coordinate.
The eleventh step of house decoration: wooden door installation
When installing the door, the hinge, door lock and floor suction should be installed at the same time. The production cycle of solid wood doors is generally one month. Therefore, in order to make the construction period closely connected, wooden door manufacturers should go to the door to measure the size of the door opening as soon as possible after the main body is removed.
Regarding the handling of doorways, we need to pay attention to one thing. If the height of the door at home is inconsistent, workers need to be treated at the same height.
House Decoration Steps Step 12: Floor Installation
The floor installation needs to pay attention to the following issues:
(1), before the floor installation, try to let the manufacturer survey whether the ground needs leveling or partial leveling. Some decoration companies or teams will suggest the ground leveling or partial leveling, subject to the actual survey of the floor manufacturer;
(2) Before the floor is installed, the floor at home should be cleaned to ensure that the floor is dry, so do not use water during the cleaning process.
House decoration step Step 13: wallpaper laying
After the floor is installed, you can spread wallpaper. If possible, the floor should be protected on the day of wallpaper pasting. It doesn't matter if there are no conditions. It is no problem to give the wallpaper glue left on the floor to Pioneer for cleaning. Before laying wallpaper, try to make the wall "nothing".
House decoration step 14: install switch socket.
In the bathroom, all sockets and switches must be waterproof and the sockets should be covered. It is recommended to use induction or fluorescent light switches at the entrance. Go home in the dark and avoid the darkness.
Switch sockets should be more than less, and at least one socket should be reserved where sockets are arranged. It should be noted that there will be more and more household appliances. Once you have a new appliance without a socket, it is difficult to install it again.
House Decoration Step 15: Hardware Sanitary Ware Installation
Before buying pipe fittings, bathroom fittings, toilets, clothes hangers, etc. , are all installed. After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive".
House decoration step 16: Installation of curtain rod
The installation of curtain rod marks the basic end of home improvement.
Steps of House Decoration Step 17: Land Reclamation and Cleaning
Don't install curtains before opening and cleaning. When starting a business and cleaning, don't have furniture and unnecessary household appliances at home. Leave as many "planes" as possible to make the pioneering and cleaning completely clean.
House decoration step 18: furniture comes into the market
As for the purchase time of furniture, my suggestion is that we should get a general idea of the basic size range of furniture after the transformation of water circuit is completed. Therefore, some students have been eager to book all the furniture before the decoration, and personally feel that it is unnecessary.
House decoration step 19: Home appliances enter the site.
At this time, it's time for home appliances to enter the market. It's time to install and prepare to move in!
Step 20 of house decoration: soft home decoration
Home decoration, the next step of home improvement, has changed from decoration to decoration, including the installation of curtains. As for buying curtains, it is best to book furniture first to avoid style conflict. Home accessories also include buying some green plants, hanging murals and decorating handicrafts.
◆ Conclusion: In order to install the house quickly and well, in addition to the master's standardized construction and rapid progress in technology, the arrangement of decoration process is also very important. The correct decoration process can make all the decoration processes closely cooperate, and the order of materials entering the site can be orderly, avoiding the inconvenience caused by the accumulation of materials on the construction site and possibly damaging the completed place.
- Previous article:How about Henan Xintai Property Service Co., Ltd.?
- Next article:Top Ten High-end Communities in Suzhou
- Related articles
- Why is Ganlong Academy cheap?
- Wenxingyuan property notice
- What about the property in Daopo District?
- Is Nantong Ruyi Huafu worth buying?
- What is the telephone number of the sales department of Rongchang Building in Zhangzhou?
- Zibo Zhangdian 90 square meters house, how much is the annual property fee and so on?
- What about Putian Lehman Trading Co., Ltd.?
- What does the validity period of star service in Chongqing Mobile Pocket Business Hall mean?
- Introduction of Donghua Jinta Community
- What is the telephone number of Hainan Jinxiang Wanjuanshan Marketing Center?