Job Recruitment Website - Property management - What's the difference between handing over a house and collecting it?

What's the difference between handing over a house and collecting it?

Delivery means that the developer delivers the house to the owner, and repossession means that the owner checks all aspects of the house delivered by the developer to see if it meets the contract requirements. The following is the basic process of closing the house:

1. Check the house for cracks. Check the whole room for cracks. First, check the conspicuous walls for cracks. Secondly, check whether there are cracks in the joints of various regions, such as the joints between the ground and the wall, cracks parallel to the beam, corners, etc. Follow the law from the whole to the part, first look conspicuous, then look at some places that are not easy to notice in a wide range, and check them in layers.

2. Check the empty drum Check whether the empty drum is mainly due to the lack of cohesion in the construction of all levels of the room, such as the floor or wall level. If there is an empty drum, you will feel the empty drum when you tap it with your hand. You can tap each area with a wooden stick to compare the tapping sound.

3. One way to check the levelness of a room is to measure whether the heights of several edges of the room are consistent, or tie heavy objects around with ropes, put them down near the corner and see how inclined they are around. Visual visual leveling.

4. If the height of the building is 2.8 meters, the actual height should not be less than 2.6 meters; If the height is 3 meters, the actual height should not be less than 2.75 meters, and the residence should not be less than 2.8 meters.

5. The water seepage and drainage of the house mainly depends on the water seepage on the floor and top of the room. Nobody wants to be infiltrated. Water seeping downstairs will also seriously affect neighborhood relations. The places where water is commonly used are mainly kitchens and bathrooms. Check the drainage of faucets, sinks, floor drains, balconies and bathrooms, as well as water seepage inspection.

6, other facilities and equipment, other doors and windows, pipes, water and electricity, gas, whether there are quality problems, according to the list, mark all the things that can be inspected at home, according to the sales contract, check in detail whether the facilities are in good condition, whether the quantity is the same, and related brands.

If there is any problem, it should be recorded in detail. When it is in good condition, sign the relevant house expropriation agreement and get the key.