Job Recruitment Website - Property management - What is the scheme and process of property fire drill?

What is the scheme and process of property fire drill?

Examples of making a property fire drill plan are as follows:

On the basis of careful investigation and study, the property management department has formulated emergency plans for key parts, including:

1, alarm call signal;

2. Fire Brigade Division;

3, fire extinguishing methods and fire extinguishing equipment;

4, the location and method of evacuation of rescue personnel and materials;

5. Explosion-proof and anti-virus measures and safety measures.

Process:

1, 503 1 The guest accidentally caused an office fire due to smoking;

2, smoke alarm, fire center report the location of the shift foreman and mobile fire 03 fire;

3. The personnel on duty should arrive at the scene within 2 minutes, report the situation to the supervisor on duty and ask for support;

Matters needing attention in property fire drill

The number of field drills should be determined according to the specific conditions of the unit. Generally speaking, it should be carried out at least twice a year, and the time to carry out the exercise can be determined according to the seasonal changes, generally before the arrival of winter and summer;

Simulate playground training according to comprehensive action drills such as receiving police, dispatching, commanding, division of labor and temporary disposal, and check whether it meets the emergency plan;

Simulated actual combat training, that is, according to the call to the site, according to the actual requirements, water, foam, 12 1 1 fire fighting, and rescue and evacuation materials training at the same time; The range of drills can be divided into comprehensive drills of the whole unit or drills of different parts and sections (films).

The fire chief rushed to the scene to direct the rescue work within 2 minutes after receiving the report, and reported the situation to the superior; The manager of the property department rushed to the scene within 3 minutes after receiving the report, directed the rescue work, and reported the site situation to the general manager of the management office, and decided whether to report the "1 19" fire according to the site situation;