Job Recruitment Website - Property management - Ningbo heli forklift sales service co., ltd. after-sales service

Ningbo heli forklift sales service co., ltd. after-sales service

In order to make the forklift work normally and reliably and give full play to its potential capacity, it is necessary to have regular maintenance measures. Technical maintenance measures, generally:

1, daily maintenance, after each shift.

2. First-class technical maintenance. After 65,438+000 working hours, a shift work system is equivalent to 2 weeks.

3. Secondary technical maintenance. Working for 500 hours, one shift is equivalent to a quarter.

I. Daily maintenance

1. Clean the dirt, mud and dirt on the forklift. The key components are: fork carriage and gantry slideway, generator and starter, battery electrode fork column, water tank and air filter.

2. Check the fastening of all parts, focusing on: fork bracket, chain tension screw, wheel screw, wheel fixing pin, brake and steering gear screw.

3. Check the reliability and flexibility of the foot brake and steering gear.

4. Check the leakage, focusing on: pipe joint, diesel tank, engine oil tank, brake pump, lifting cylinder, tilting cylinder, water tank, water pump, engine oil pan, torque converter, transmission, drive axle, main reducer, hydraulic steering gear and steering cylinder.

5. Remove oil filter sediment.

Second, the technical maintenance level

According to the daily maintenance project, add the following work.

1, check the cylinder pressure or vacuum.

2. Check and adjust the valve clearance.

3. Check whether the thermostat works normally.

4. Check whether the multi-way reversing valve, lifting cylinder, tilting cylinder, steering cylinder and gear pump work normally.