Job Recruitment Website - Property management - Complete knowledge of indoor and outdoor hydropower renovation and decoration

Complete knowledge of indoor and outdoor hydropower renovation and decoration

We must have our own thoughts on indoor hydropower transformation. After all, the house is for our own use, and the hydropower transformation needs accurate planning and layout to avoid decoration accidents. Therefore, under the premise of ensuring safety, we must take the convenience of our lives as our main task. Next, let's take a look at the knowledge of indoor and outdoor hydropower transformation with Bian Xiao!

Indoor and outdoor hydropower decoration knowledge

First, the details of hydropower transformation

1, waterway design should first consider all water-related equipment, such as water purifier, water heater, kitchen treasure, toilet, washbasin, etc. Their locations, installation methods and whether hot water is needed; It is necessary to make good use of gas or electric water heaters in advance to avoid temporary replacement of water heaters, which will lead to repeated reconstruction of waterways; In addition to the washbasin, toilet, washing machine and other outlets, it is best to bring one out to facilitate the later water mop;

2. It is the first time for a cabinet manufacturer to come to the door. It is best to bring the construction master who changed the water together and communicate face to face. Before construction, the upstairs should be waterproof to ensure that there is no water seepage downstairs before construction.

3. After waterway reconstruction, suppression experiments should be done. The fireman reminded me to press 6 to 8 atmospheres with a press to keep it from leaking for 30 minutes. It is best to have a property on the scene to suppress the test, which can play a supervisory role; Because some decoration teams will cheat the owners in this link.

4. After the kitchen and bathroom floor tiles are laid, check whether the floor drain is unobstructed (the drainage speed after removing the floor drain cover shall prevail, because most deep-water sealed floor drains have the problem of slow drainage); If you want to close the redundant floor drain, you must block the gap between the drain pipe and the floor drain to prevent water from overflowing;

5. It is best not to use deep-water sealed floor drain for washing machine floor drain, because deep-water sealed floor drain has a common feature of slow launching, which is used for deep-water sealed floor drain in shower room and other positions. Floor drain can basically meet the drainage demand because of the small amount of water; However, the drainage speed of washing machine is very fast, which can not reach the drainage speed of deep-water floor drain at all, which directly leads to water overflow.

Second, the transformation of indoor and outdoor waterways

1, our bathroom is often the place where the water consumption of our whole room is relatively large, so we should consider setting a separate outlet besides the main indoor outlet, such as washbasin, toilet and washing machine, which will be more conducive to our daily mopping.

2. When inspecting the house, we must pay attention to check whether the drains in our indoor kitchen and bathroom are unobstructed, because the tiles may cause our drains to be blocked, so we must check to ensure smooth drainage.

3. We should also consider all indoor water-related equipment, such as water purifier, water heater, faucet, etc., so we need to reserve cold and hot water pipes, which will be more beneficial to our lives. However, in the specific installation, it is necessary to pay attention to the height of hot and cold water nozzles to be consistent, and the water pipe mouth to be perpendicular to the wall; Our hot and cold water supply nozzle is about two centimeters higher than our wall, and at the same time, we must ensure that our indoor wall tiles and water pipe nozzles are on a horizontal plane.

4. Indoor waterproofing should be in place. Indoor waterproofing is directly related to our living conditions, especially our toilets. The wall waterproofing should be at least 180cm high, so that the wall will not sweat because of excessive water use.

Second, the transformation of indoor and outdoor circuits

1, our indoor circuit design must consider its feasibility and practicality, and at the same time, it should not be rigid, and the indoor design should be more flexible. Therefore, before the specific construction, we must clearly explain the design ideas and our own ideas to the workers to avoid too many mistakes.

2. When designing a switch for our bedroom ceiling lamp, we can consider using a double-control switch, that is, setting a switch at the entrance and bedside, which will make our life more convenient.

Generally speaking, for the convenience and safety of use, the distance between our indoor socket and the ground should not be less than 20 cm, generally 30 is the best, and the distance between our switch and the ground should be 130 cm. At the same time, our corridors and balconies should be equipped with sockets.

4. In concrete construction, pvc pipes must be used when laying the conduit again, and there can only be three wires in one pipe at most. At the same time, panels should be reserved at the joints, which is also more conducive to inspection.