In today's developing world, there are more and more occasions where contracts can be used, and contracts are a very important factor in the development of enterprises. I believe everyone is worried about writing another contract. The following is the template of renovation contract in Zhuhai residential room. Welcome to reading. I hope you will like it.

Zhuhai Residential Interior Decoration Contract Template 1 Entrusting Party (Party A):

Contractor (Party B):

Engineering project:

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the characteristics of residential decoration in this city, on the basis of equality and voluntariness, Party A and Party B have reached the following agreement on matters related to Party B's contracting of Party A's residential interior decoration project (hereinafter referred to as the project) through consultation:

Article 1: Project Overview

1. Project address: The construction area is calculated according to the actual area.

Two. Construction content: See Catalogue of Home Decoration Construction, Construction Technology Table and Construction Drawing for details.

Three. Contracting method: Both parties agree to adopt the general contracting method that Party A provides the main materials and Party B contracts the labor and auxiliary materials (see attached table: list of decorative materials provided by Party A and list of decorative materials provided by Party B).

Four. Duration: from (year) to (year), the total number of days of the project.

Article 2: Project Price

Total project price: RMB (in words: RMB only), including decoration accessories, labor costs and design fees.

Article 3: Quality Requirements

I. See the list of materials for the varieties, specifications and names of auxiliary materials used in this project.

Second, the project acceptance criteria, the two sides agreed to refer to the Chongqing "residential decoration acceptance criteria" provisions.

Article 4: Method of Payment

After the contract is signed, Party A shall pay 10% of the project cost; Hydropower materials will pay 30% of the project cost when they enter the site, and muddy water materials will pay 30% of the project cost when they enter the site; The painter shall pay 25% of the project cost when the materials enter the site, and 5% of the total project cost when the project is completed and accepted, subject to the receipt.

Article 5: Warranty Period

Since the date of completion acceptance, the warranty period for surface works is two years, and that for concealed works is five years.

Article 6: Liability for breach of contract

After the contract comes into effect, during the performance of the contract, the party that terminates the contract without authorization shall pay the other party 5% of the total contract amount as liquidated damages. If the actual loss caused to the other party by the unauthorized termination of the contract exceeds the liquidated damages, it shall be compensated.

1. This contract and its annexes shall be sealed by both parties and come into force after being signed.

2. This contract has legal effect.

Three. This contract (including annexes) is made in duplicate, with each party holding one copy.

Party A (Owner): (Signature) Party B: (Signature)

Tel: Tel:

Date of signing: Date of signing:

Model of Zhuhai Residential Interior Decoration Contract 2 Party A (property management unit): _ _ _ _ _ _ Tel: _ _ _ _ _ _ _

Party B (Decorator): _ _ _ _ _ Tel: _ _ _ _ _ _ _

Party C (decoration construction unit): _ _ _ _ _ Tel: _ _ _ _ _ _ _

In order to standardize the activities and management behavior of residential interior decoration (hereinafter referred to as decoration) and maintain the normal order and public interests of residential areas, a fee agreement is reached on the decoration management service of _ _ _ _ _ _ _ _.

A, decoration engineering or scheme (can be attached)

1、_________;

2、_________;

3、_________;

4、_________。

Second, the decoration period

The renovation period is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. In case of overdue renovation, Party B shall renew the Residential Interior Decoration Management Agreement with Party A. ..

Third, it is forbidden to decorate.

1. Destroy or change the main building and load-bearing structure without authorization;

2. Increase the floor load without authorization;

3. Punch holes in the load-bearing wall or expand the original size of doors and windows on the load-bearing wall, and remove the wall connecting the balcony;

4. Change the hall, room and balcony into toilets and kitchens, and use rainwater pipes to discharge domestic sewage;

5. Destroy the waterproof layer of bathroom and kitchen;

6, illegal construction of buildings and structures;

7. Destroy or change the appearance of the house without authorization, and open doors and windows on the non-bearing wall without authorization;

8. Altering or connecting gas pipeline facilities and public pipelines without authorization;

9. Occupy, damage or arbitrarily change the parts and facilities of the property;

10, other behaviors that affect the building structure and use safety.

Four, decoration management regulations

1. Decoration construction personnel shall wear a decoration pass when entering the residential area, and shall be inspected by Party A's personnel. Party B applied to Party A on _ _ _ _ _ _ _ _ _.

2. Decoration workers are generally not allowed to stay in the renovated residential room. If it is necessary to send someone to guard the construction site, Party B shall report and register with Party A..

3. Decoration construction shall comply with fire prevention regulations, and the job site shall be equipped with at least 2 fire extinguishers.

4. The construction time is 8:00- 12:00, 14:00- 18:00 every day, and construction is prohibited at other times.

5. During the decoration construction, Party C shall take protective measures for all kinds of pipeline openings to avoid the blockage caused by sundries entering the pipeline.

6. Party A has the right to take the following measures when performing management duties, and Party B and Party C shall not refuse or hinder them:

(1) Ask Party B or Party C to provide relevant information;

(2) Enter the decoration site for inspection;

(3) Stop the illegal decoration, and ask for suspension or rectification;

(4) report to the relevant government departments;

(5) Take _ _ _ _ _ measures;

(6)_________;

(7)_________。

Five, outdoor facilities and anti-theft doors and windows installation regulations

1, outdoor facilities such as air conditioners and solar water heaters. , should be installed in the predetermined position of architectural design, and the size should not exceed the design requirements. If there is no predetermined position in the original design, it shall be installed reasonably according to the unified position specification specified by Party A. Condensed water of air conditioner shall be connected to the pipeline without dripping.

2, outdoor safety doors and windows should be installed in accordance with the provisions, shall not violate the relevant laws and regulations.

3、_________。

Six, decoration materials and decoration garbage storage, removal and treatment

1. Decoration materials shall be stored inside the renovated house, and shall not be stacked in public places or public places. Temporary stacking due to loading and unloading shall be cleaned up as soon as possible; If Party B or Party C fails to make proper arrangements after being notified by Party A, Party A has the right to dispose of it, and the disposal fee can be deducted from Party B's decoration deposit.

2, decoration garbage pickup in the following _ _ _ _ _ _ _ _ ways:

(1) Self-cleaning. Party B or Party C must clean up the decoration garbage piled up in the designated place before 18:00 every day; If the vehicle is not cleared on time, Party A will clear the vehicle on its behalf, and the clearing fee will be deducted from the decoration deposit, amounting to RMB _ _ _ _ _ _ _ _.

(2) Entrust Party A to clear and transport. Party B or Party C shall notify Party A one day before the garbage needs to be removed, and load or pack the decoration garbage and put it at the designated place. Party B or Party C shall pay Party A the renovation garbage cleaning fee of RMB _ _ _ _ _ _ _ _.

3、_________。

Seven, decoration deposit and management service fee

1. After this agreement is signed, Party B shall pay Party A the decoration deposit according to the following standards:

The residential property is _ _ _ _ _ _ _ yuan per household;

Non-residential property is _ _ _ _ _ _ _ yuan per household.

2. After the renovation project is completed, if it is confirmed by Party A that there is no illegal renovation and no behavior that harms the interests of the public and other owners, Party A will refund the renovation deposit to Party B within _ _ _ _ _ _ _ _ _ _.

This site demonstration contract building materials demonstration contract simple renovation contract tooling renovation contract facade shop renovation contract office decoration contract indoor renovation contract 3. Party B shall pay Party A the decoration service fee of _ _ _ _ _ _ _ _ _ yuan as agreed.

4、_________。

Eight. Other agreements

1. Party B shall immediately repair the damaged parts, facilities, equipment, pipeline blockage and leakage caused by renovation; Where economic losses are caused, Party B shall negotiate with the damaged person for reasonable compensation. If negotiation fails, you can apply for arbitration or bring a lawsuit. If it is the responsibility of Party C, Party B may claim compensation from Party C. ..

2、_________。

3、_________。

4、_________。

Party A (seal): _ _ _ _ _ Party B: _ _ _ _ _ _ _

Person in charge (signature): _ _ _ _ _ Decorator (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party C (seal): _ _ _ _ _ _

Person in charge (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _