Job Recruitment Website - Property management - Emergency plan for flood disaster safety in embankment

Emergency plan for flood disaster safety in embankment

Model essay on emergency plan for flood disaster safety in embankment

In the study, work and life on weekdays, emergencies are not allowed. In order to avoid more serious consequences, it is often necessary to make emergency plans in advance. So, do you understand the emergency plan? The following is a sample of bank flood safety emergency plan I collected for you, which is for reference only and I hope it will help you.

Bank flood disaster safety emergency plan 1 With the rainy season coming, the business department of xx Branch of Industrial and Commercial Bank of China took precautions, actively took precautions, started the emergency plan for flood control, and took various measures to strengthen the prevention of emergencies during the flood season.

First, do a solid job in flood control deployment.

In the near future, the flood control work will be deployed as an important work, and departmental coordination meetings will be held to closely investigate the hidden dangers of flood control work in rainy season, learn from the experience of dealing with the "7. 18" torrential rain, clarify the tasks and implement the responsibilities.

The second is to organize all staff to learn.

Make use of the morning meeting time to strengthen the study of flood control emergency plan, and ask everyone to pay attention to it and be vigilant; Strictly guard against death and implement responsibilities; Strengthen drills and be familiar with disposal procedures.

The third is to strengthen coordination.

Instruct the cash operation center, office and escort company to communicate with each other, effectively communicate the possible problems such as road congestion, rain bag, network failure and poor system handover in rainy season, clarify responsibilities, strengthen coordination, effectively improve the ability to deal with emergencies in flood season, and ensure cash safety.

The fourth is to improve the working environment. Clean up the office space and sundries in front of the door in time, dredge the drainage facilities, and put an end to the phenomenon of water accumulation when heavy rain comes. And the exposed lines will be fixed with metal edges to prevent the use from being affected by moisture and collision. Provide the necessary hardware environment for flood control work and ensure the safety of funds to the maximum extent.

Since June, heavy rain and heavy rain have occurred frequently in Gao 'an City. In order to standardize and institutionalize flood control and security work and effectively prevent unnecessary losses caused by natural disasters, xx Branch of xx Bank attaches great importance to flood control and flood fighting in summer, plans ahead and implements "three measures" to ensure safe flood season.

First, the ideological attention is not paralyzed.

Sub-branches attach great importance to the safety of flood control and flood fighting, and require the heads of all departments and outlets to recognize the seriousness of the flood control situation this year, take a highly responsible attitude towards the life safety of customers and employees and the safety of bank property, tighten their minds, pay close attention to preparation, tighten their responsibilities, pay close attention to supervision, and make early arrangements, early deployment and early warning to deal with possible floods at any time.

Second, the forecast and early warning are not relaxed.

In order to control the initiative of flood control and disaster relief, the sub-branch set up a flood control team, which was closely monitored by special personnel and notified on QQ group and WeChat group. At the same time, improve the flood prevention emergency plan and flood prevention publicity mechanism, organize personnel from various departments and outlets to participate in summer flood prevention emergency drills, and improve the ability of flood prevention emergency and self-protection.

The third is to ensure that the flood season will not waver.

Formulate and issue the Emergency Notice on Doing a Good Job in Summer Flood Control Emergency Support, requiring to ensure that emergency materials are in place in time, strictly implement the 24-hour flood control duty system, ensure the safety of personnel, funds and important blank vouchers when major disasters occur, and pay close attention to the safety of houses, equipment and networks; At the same time, seriously implement the reporting system of major events, and when disasters such as floods occur, the personnel on duty should report at the first time and seek guidance and help in time; It is also clearly stipulated that anyone who causes losses due to inadequate work will be severely accountable.

Emergency Plan for Flood Disaster Safety of Embankment 3 1, with general provisions

The purpose of compiling 1. 1

In order to standardize the emergency management of flood disasters, do a good job in flood prevention and information prevention of the whole bank, further improve the ability of all staff to deal with emergencies, minimize risk losses and ensure the safe operation of banks.

1.2 working principle

(1) Before the flood season: make full preparations for flood control and materials, and firmly establish the idea of preventing major floods, resisting major risks and saving major disasters.

(2) Flood season: Respond in time and take various measures to mobilize all forces to minimize the losses caused by flood season.

(3) After the flood season: sum up experience in time and do a good job in the aftermath.

1.3 compilation basis

Main laws and regulations:

(1) flood control law of People's Republic of China (PRC);

(2) People's Republic of China (PRC) Flood Control Ordinance

1.4, scope of application

This plan is applicable to the emergency flood control work of Langfang Branch of China Construction Bank and its sub-branches (offices).

2, organization and command system and responsibilities

2. 1 emergency organization and responsibilities

The leading group for flood control work of Langfang Branch of China Construction Bank is the emergency leading body of the bank. Under the leadership of the Party Committee of the branch, it is necessary to organize inspection and guide the flood control work of the whole bank according to regulations, and regularly convene relevant personnel to study flood control work. If a major danger is found, effective measures must be taken immediately to solve it quickly, and report to the superior bank or the local safety production supervision and management department in time.

3. Prevention, prediction and early warning

3. 1 prevention first

Adhere to the principle of putting prevention first, and the flood control emergency agencies of each branch should prepare flood control materials before the flood season comes every year, organize teams, and do a good job of daily inspection and prevention before, during and after the flood season.

3.2 Information collection and reporting

During flood season, the security department of the branch company should always get in touch with relevant departments, carefully collect information on rain, water, work and water, and timely notify the branch offices and business outlets according to the danger level. For dangerous information with great influence, it should be reported to the flood control headquarters of the superior bank in time.

3.3 Early Warning Level and Delivery

According to the severity and urgency of reservoir flood, the early warning levels are divided into general (4), heavy (3), serious (2) and particularly serious (1), which are indicated by blue, yellow, orange and red in turn. Each branch shall report to the branch as soon as possible in case of serious danger. The specific standards, reporting channels and time limits of the early warning level shall be implemented in accordance with relevant regulations.

4. Emergency response

4. 1 grading corresponding program

After the dangerous situation occurred, the branch immediately announced the launch of the emergency plan for flood control, and the employees of the whole bank responded quickly. Under the condition that one's own life safety can be guaranteed, in line with the principle of people-oriented, first rescue injured colleagues and customers to avoid secondary, derivative and coupling incidents that may occur when saving state property.

4.2 Command and coordination

In the event of danger and flood, the governor is the first person responsible for flood control, and all departments under the command of the governor, according to their post responsibilities, quickly put into emergency rescue work. The security department of the Branch is responsible for the organization and coordination of emergency rescue.

4.3 Transfer and placement of personnel and materials

After the low-lying business outlets are flooded, it is necessary to rescue valuables and important materials as much as possible, and all branches should arrange life for employees whose families are affected by the disaster.

5. Summary and lessons learned

Summarize experiences and lessons in time and commend advanced models in flood control and disaster relief work. Those who seriously neglect their duties in emergency rescue work shall be dealt with in accordance with relevant regulations.

;