Job Recruitment Website - Property management - How to organize the acceptance of unit greening project

How to organize the acceptance of unit greening project

According to Notice 46 [1999] on Code for Construction and Acceptance of Urban Greening Projects, the construction committees of all provinces, autonomous regions and municipalities directly under the Central Government, the construction committees of cities with separate plans, the construction committees of Xinjiang Production and Construction Corps and the relevant departments of the State Council: according to the notice of the Ministry of Construction on printing and distributing 1993 industrial standards for engineering construction (the first batch of the Ministry of Construction) (construction standard [6544]

In order to implement project supervision and quality control in the whole process of urban greening project construction, improve the survival rate of urban greening planting, improve urban greening landscape, save greening construction funds, ensure the quality of urban greening project construction and create a good urban ecological environment, this specification is formulated.

This specification is applicable to the construction and acceptance of public green space, residential green space, unit attached green space, production green space, protective green space, urban scenic forest land, urban road greening and other greening projects and their ancillary facilities. The supporting structure and municipal facilities of the greening project shall conform to the provisions of the current relevant national standards.

Extended data

Urban greening projects must be carried out in accordance with the approved greening project design and relevant documents. Construction personnel should master the design intent and make good preparations for the project.

Before construction, the design unit shall make design disclosure to the construction unit, and the construction personnel shall conduct on-site check according to the design drawings. If there is any discrepancy, it shall be submitted to the design unit for design change. According to the requirements of greening design, the selected planting materials should meet the requirements of their product standards.

Baidu Encyclopedia-Code for Construction and Acceptance of Urban Landscaping Project