Job Recruitment Website - Property management - Various schemes for external wall cleaning

Various schemes for external wall cleaning

Chapter 1: Exterior wall cleaning scheme

External wall cleaning materials mainly include cement wall, glass curtain wall, composite aluminum plywood wall, marble wall, granite wall, mosaic wall, ceramic tile wall, dry masonry wall, water brush stone wall and so on. Due to the erosion of dust, oil pollution and acid rain (fog) in the air, a newly built building often becomes messy in a short time, especially in some cities with serious air pollution. Without regular professional cleaning and nursing, it will soon lose its original charm, which will not only shorten the natural life of the external wall, but also greatly affect the beauty and image of the city.

1, cleaning method:

(1) working on an overhead crane; (2) hanging board for aerial work; (3) Scaffolding for aerial work.

The choice of cleaning method mainly depends on the shape of the building, the structure of the ceiling and the surrounding environment of the building floor.

2. Precautions for cleaning external walls:

(1) When cleaning ceramic tiles, it should be noted that the use of cleaning agents will destroy the surface smoothness of ceramic tiles.

(2) When cleaning the glass, it is necessary to pay attention to the glass coating device, and it is easier to coat on it. If the coating is installed outdoors, we need to pay attention to avoid damaging the coating on the glass surface when cleaning the glass.

Pay attention to whether the tools and cleaning agents used damage the coating.

(3) Aluminum plate cleaning requires the use of neutral cleaning agents, and corrosive cleaning agents and grinding tools are absolutely not allowed.

When cleaning the external walls of buildings, we should not only ensure that the external walls are as clean as new, but also have no destructive damage to the external walls of buildings. This requires us to have a higher professional and technical level and rich experience in external wall cleaning to complete this work.

3. The work of cleaning the external wall is aerial work, which is very dangerous. In order to absolutely ensure the safety of operation, we must always keep a high degree of vigilance, and everything should be operated in accordance with the operating rules, without any negligence.

Aerial work is not allowed under the following circumstances:

(1) Not approved by the supervisor and trained in safety technology operation;

(2) Being diagnosed by a doctor as suffering from heart disease, hypertension and illness that day, and not suitable for aerial work;

(3) it is forbidden to work after drinking;

(4) Bad weather and its influence on operation, etc.

Check preparation before operation:

(1) Check whether the crane boat or cable is damaged or broken;

(2) Check whether the parts of the suspended crane are normal and whether the working environment is normal.

Operating procedures:

(1) When working on board, you should concentrate, and you are not allowed to have fun.

(2) The crane boat cannot be overloaded during operation, and someone should cooperate with all the work on the roof;

(3) The operator must fasten his seat belt, which should be tied to the safety rope on the ship.

Chapter II: Construction Scheme of Exterior Wall Cleaning

A, high-rise wall waterproof leakage:

Wall is a vertical component of a building, but factors such as design, construction, materials and use will cause cracks in the wall and lead to leakage.

Wall leakage control method:

The waterproof of the original structure is a linear structure, and its function is to disperse water.

When the cavity structure is damaged locally, it is best to use restorative repair.

Repair with waterproof material:

This method has a wide range of applications, that is, in the indoor parts where rainwater permeates, oil-soluble or water-emulsion waterproof materials are used for joint filling or brushing.

Waterproof measures shall be taken for the outer side of the external wall panel, and waterproof materials shall be adopted.

Water plugging method of external wall internal coating:

That is, waterproof measures are taken on the inner half of the outer wall to prevent rainwater from invading through waterproof materials.

Our company's construction force is aerial work, and professional and technical personnel carry out investigation, demolition and formulation of construction plans for various waterproof restoration projects. Therefore, there is no need to set scaffolding for waterproofing and plugging of high-rise external walls, saving auxiliary costs.

Second, the exterior wall building coating construction:

Construction of new wall coating;

It is required to have enough curing period for painting the bottom layer of building exterior wall, and the new water mortar concrete surface must be cured for a reasonable period of time to make it "spit alkali" and fully dry. The bottom surface should be dry, solid and firm, and there should be no defects such as sand, cracks and looseness.

Construction method:

Exterior wall painting should not be plastered in a large area, and the putty layer should not be too thick. The material should be polymer cement putty. Generally, primary coating and secondary surface coating are adopted. According to the requirements of engineering quality, the number of surface painting can be increased appropriately. Painting construction is generally carried out from top to bottom, and each painting should be bounded by dividing line, wall surface, junction of yin and yang angle or downpipe.

Operating tools:

Generally, roller coating, brush coating or gas spraying and airless spraying are used.

Maintenance and renovation:

The biggest advantage of decorating the building surface with paint is that it can be finished in a certain period of time, and the building is generally fully maintained in 4-5 years. Make a comprehensive investigation before exterior wall decoration and make a construction plan.

After the painting project is completed, we will conduct long-term quality tracking and return visit to our customers, and provide a painting maintenance plan.

Three, building curtain wall glass maintenance:

Glass curtain wall is used for exterior wall decoration, which is difficult in quality and strict in process requirements, and the engineering quality must be guaranteed.

After years of practice, the curtain wall glass maintenance project must form a set of scientific technological processes and supporting installation procedures. Installation and use of structural glue and weather-resistant glue in sealant (imported glue should be used), with smooth gluing, clear lines and no leakage. The selection of curtain wall glass is strictly in accordance with the design requirements.

Four: central air conditioning equipment cleaning:

The central air conditioning unit and fan coil unit are cleaned with neutral cleaning agent, which is harmless to human body and has no corrosion damage to equipment.

Specify the process of direct spray cleaning without disassembly. It can quickly penetrate, dissolve and take away the dust and grease on the heat sink, significantly improve the refrigeration effect, sterilize and deodorize, and have no pollution to the environment.

Five, the installation and removal of high-level advertising:

For medium-sized and above advertising buildings, designated safety technicians shall survey the project site, formulate the project construction plan, delimit the safety area, equip the project hoisting equipment and dispatch construction personnel.

Six, high-rise pipeline installation and maintenance:

Hoisting personnel shall operate according to routine safety regulations. On the ground and on the top floor, full-time personnel shall coordinate, command and operate, and designate safe areas.

Seven, paint-wood surface paint, metal surface paint, gypsum surface paint:

Select high-quality paint and reasonable construction technology to ensure the engineering quality. Whether it is new or redone, the base surface needs to be treated, and the joints and concave and convex points should be leveled.

Eight, solid wood floor renovation:

Polishing for several times with a large floor turnover machine, removing the paint layer, surface layer and wood layer by about 0.4-0.6 mm, and then polishing carefully to make the floor surface fine and the gloss reach the new standard. The edge of the floor should be polished with a cross grinder to achieve the overall effect, then re-sealed, and finally painted or waxed according to customer requirements.

Nine, marble, granite, terrazzo renovation:

According to the wear degree of stone surface, it can be divided into three types: mild renovation, shallow renovation and deep renovation.

Slight transformation: generally, there is no need to use a special weighting machine, and the operation is relatively simple. Generally, sand and dust particles on the ground are removed, stains are washed and waxed, and polished for many times with special machinery until the reflective effect is achieved. After all renovation procedures are completed, the crystal is hardened.

Shallow decoration: the stone floor is seriously worn, but the scar is not more than 0 or 5 mm A weighting machine can be used and operated under the guidance of a decoration technician.

Deep renovation: the stone surface has been in disrepair for a long time, and the damage is very serious. If the depth of surface scars exceeds 0 and 5mm, the construction scheme will be drawn up after on-site investigation by full-time personnel.

Ten, marble, floor wax mirror processing:

The sand, dust and wax marks on the ground must be cleaned up. After being thoroughly dried, according to the requirements of different grades, professional equipment and high-quality wax materials are used for surface polishing construction.

Cleaning and washing:

XI。 Exterior wall cleaning:

According to different building structures and wall materials, in view of the binding force between dirt and the surface of objects, professional exterior wall cleaning agents and glass cleaning agents are selected, hanging baskets or hanging ropes are used, and equipment including high-pressure water guns and cleaning machines are used for construction operations.

Twelve, glass cleaning:

Use glass scraper, wiper and efficient glass cleaner to thoroughly remove dirt, and use glass spatula to remove dust and cement glue from window frames and window joints. The cleaning agent contains antistatic components, and the scrubbed glass is crystal clear.

Thirteen, floor cleaning and waxing:

The surfaces of marble, granite, terrazzo, artificial marble, wooden floor, PVC plastic floor and glazed floor tile are cleaned and waxed.

If the original floor has a wax layer, wax it before cleaning. According to the dirt on the surface of different materials, choose cleaning agent, cooperate with sweeper and water absorbent, and construct synchronously. The surface must be free of dust and dirt, completely absorbed and free of water.

Wax the ground:

There should be no hidden dirt under the wax surface, and the wax surface should be covered evenly. There should be no leakage and bubbles on the wax surface. The wax surface should be smooth and full, with soft luster and dignified texture.

Fourteen, carpet cleaning (pure wool carpet, blended, chemical fiber carpet):

Use imported carpet cleaning machine and use different cleaning agents for different carpet stains, and then suck up the cleaning solution and dirt. If the stain is serious, you can clean it several times. After cleaning, the carpet suede is free of dust, the carpet surface is bright in color, combed neatly and fluffy, and the texture is elastic.

Fifteen, large chandelier cleaning:

Crystal chandeliers are generally difficult to clean. In order to solve this problem, through exploration and practice, advanced spraying method and special cleaning agent for lamps are adopted, and it is not necessary to disassemble the lamps. The crystal chandelier after cleaning has no dirt, no corrosive effect on metal parts, and the lighting is bright and transparent, which is very luxurious.

Reclamation after the completion of building and decoration projects;

Sixteen, surface maintenance, cleaning the floor, glass, toilet decontamination, cleaning decoration marks, floor waxing (extra charge), the whole cleaning. Adopt imported special mechanical equipment, cleaning agent and manual operation.

Seventeen, enterprises and institutions long-term cleaning, regular cleaning:

Long-term cleaning:

In line with the purpose of providing customers with quality services, according to the requirements of enterprises and the configuration of property cleaning services, the cleaning concept and service expertise are fully reflected by adopting intimate service methods and various maintenance measures. Ensure the cleanliness of the property reaches a high level.

Regular cleaning:

Regularly clean the pavements of enterprises and institutions, commercial buildings, commercial buildings, supermarkets, convention centers, schools, banks, hospitals and shops. The content, scope and time of cleaning are selected by customers, and specific service contracts and detailed rules are formulated.

Chapter III: Construction Scheme of Exterior Wall Cleaning

First, the way of external wall cleaning

At present, there are two main ways to clean the external wall: hanging board method and window cleaning method.

Hanging board method is to hang people to the working position for cleaning with hanging rope and hanging board. This type of stereo is relatively simple and low cost. As long as the workers have good physical quality and the ropes are firmly connected, ordinary buildings can be cleaned in this way. But this way of operation must make safety measures in place, otherwise it is very dangerous, and all casualties are caused by inadequate safety measures.

Second, the external wall cleaning conditions

1. climatic conditions: external wall cleaning must be carried out in good climatic conditions, and the wind is less than level 4, and the operation is stopped above level 4. So measure the wind before work, especially at high altitude. In addition, rain, snow, fog, poor visibility, high temperature (above 35℃) and low temperature (below 0℃) are not suitable for external wall cleaning.

2. Personnel conditions: In order to implement the national safety laws and regulations and ensure the personal safety of workers and the normal operation of equipment, it is stipulated that aerial work personnel must be male citizens over 18 years old, and they can only take up their posts after passing the physical examination and safety technical training. Workers are not allowed to drink alcohol before taking up their posts, and aerial work will be suspended if they have symptoms such as colds.

3. Equipment condition: the equipment for cleaning the external wall must be in good working condition. If the hanging plate is hairy and some strands are gradually cracked, a new rope should be replaced immediately.

Third, the safety operation procedures

L, before going to work, you must carefully check whether the mechanical equipment, appliances, ropes, seat plates and seat belts are damaged, to ensure good mechanical performance, and all kinds of appliances have no abnormal phenomena before operating at his post.

2. The operating rope and safety rope must be tied separately. Soft objects should be padded along the mouth to prevent the rope from breaking due to wear. The lower end of the rope must touch the ground, and the rope releaser should also fasten the temporary safety rope.

3. Construction personnel should wear work clothes and safety helmets before taking up their posts. Fasten the safety belt first, then fasten the safety lock (on the safety rope), and then fasten the shackle (on the operating rope). At the same time, the buttons on the board should be fastened and fixed.

4, pay-off, construction director and upstairs care personnel to give command and help.

5. During operation, auxiliary devices should be fastened. In case of falling and injuring people, it is forbidden to laugh and play and carry other irrelevant items;

6, upstairs, ground monitoring personnel should stick to the construction site. Seriously perform their duties. Observe the tightness of the operating rope and safety rope, the kink and stringing of the rope at any time, report the problems in time and eliminate them in time.

7, upstairs monitoring personnel are not allowed to walk back and forth on the edge of the roof. When necessary, you must fasten your own safety rope first, and then carry out auxiliary work. The ground supervisor is not allowed to read books and newspapers at the construction site, and is not allowed to watch other sites at will. At any time, pedestrians should be stopped from entering dangerous areas and pulling and throwing ropes.

8. When the operating rope and the safety rope need to move up and down, they shall be arranged by the supervisor and the auxiliary workers in coordination, and the rope shall be tied tightly when not in use.

9. When the construction personnel want to land, they should first check the facilities on the ground and walls, the positioning of operation ropes and safety ropes, and the pedestrian flow. After being handled and adjusted by the ground monitoring personnel, he can slowly descend until he reaches the ground.

10, adhere to the safety first, civilized construction, to ensure the quality of engineering services.

1 1. Do not take things of Party A or customers without authorization, and do not damage various facilities of Party A or customers.

12, aerial work personnel and site monitoring personnel must obey the unified command and management of the construction director.