Interior wall coating construction contract
Employer (hereinafter referred to as Party A): _ _ _ _ _ _ _
Contractor (hereinafter referred to as Party B): _ _ _ _ _ _ _ _ _ _ _
In accordance with People's Republic of China (PRC) Contract Law, Regulations on Construction and Installation Contract, People's Republic of China (PRC) Consumer Rights Protection Law, People's Republic of China (PRC) Price Law and other relevant laws and regulations, in order to protect the legitimate rights and interests of both parties, combined with the specific conditions of this project, the two parties reached the following agreement for mutual compliance.
I. Overview
1. Project name: Livable Rhine City Club.
2. Decoration construction site: Leifeng Avenue in Rhine City is livable.
3. Decoration construction content: painting and decoration of wood veneer, footstone, lines and columns in the clubhouse.
5. Contracting method: contractor.
7. Duration: Duration _ _ _ days (from the date of signing the contract).
Second, the construction requirements:
1, cleaning wood surface 2, polishing cleaning 3, mending cleaning 4, painting primer 5, polishing cleaning 6, realizing three layers and four sides.
Third, the site management requirements:
1, this project implements the local standards and quality evaluation acceptance standards formulated by the municipal construction administrative department, such as DBJ08-62-97 Technical Specification for Residential Building Decoration Engineering, DB3 1/T30- 1999 Acceptance Standard for Residential Decoration.
2. During the construction period, Party B must obey the deployment and arrangement of Party A's management personnel and carry out the construction according to Party A's requirements, otherwise Party A has the right to impose economic penalties.
3, the project acceptance basis
7. Project completion: Party B shall notify Party A of the acceptance three days in advance, and Party A shall organize the acceptance within three days after receiving the notice, and go through the acceptance handover procedures (for details, please refer to the Appendix "Project Quality Acceptance Sheet"). If Party A fails to organize the acceptance within the specified time, it shall notify Party B in time and set another acceptance date. If it passes the completion acceptance, Party A shall acknowledge the original completion date and bear Party B's storage expenses and other related expenses.
Four, the relevant safety production and fire prevention agreement:
The construction drawings and practices provided by Party A and the construction site shall meet the requirements of fire prevention and accident prevention, mainly including the smoothness and qualification of electrical lines, gas pipelines, tap water and other pipelines. During the construction period, Party B shall take necessary safety protection and fire control measures to ensure the safety of operators and nearby residents, and prevent accidents such as pipeline blockage, water leakage, power failure and damage to houses and articles of nearby residents. In case of the above situation, Party A shall be responsible for compensation; Where Party B is responsible, Party B shall be responsible for repair and compensation.
Verb (abbreviation of verb) Agreement on project price and settlement:
1, and the project payment method is shown in the following table:
2. Project Settlement: See Annex 6 Project Settlement Table for details.
3. The warranty period of the project is one year. Party A and Party B can only sign the Project Warranty (see Annex 7 for details) after the project payment is fully settled, and the warranty period is calculated from the date of signing the completion acceptance.
4. Receipts shall be issued for the capital exchanges between the two parties, and invoices shall be issued at the end of construction.
Other matters of intransitive verbs
1. Party A's work: (1) Party A shall provide Party B with _ _ _ copies of construction drawings or practice instructions approved by the property management department one day before the start of construction, and make on-site disclosure to Party B. Empty all or part of the house and remove obstacles that affect the construction. Protective measures should be taken for furniture and furnishings stranded in houses that can only be partially vacated. Provide Party B with necessary conditions such as construction water and electricity, and explain matters needing attention. (2) Do a good job in the coordination of the temporary use of public parts in the construction and the influence on neighborhood relations. (3) If it is really necessary to dismantle or change the original building structure or design the pipeline, it shall be responsible for going through the corresponding examination and approval procedures at the local housing management department or property management department, and bear the relevant expenses.
2. Party B's work: (1) Participate in the on-site disclosure of construction drawings or instructions organized by Party A. (2) Appoint _ _ _ _ as the on-site representative of Party B to be responsible for the performance of the contract. Organize the construction as required, complete the construction task on time with good quality and quantity, and solve all matters that Party B is responsible for, and Party B shall recognize its behavior. If there is any personnel change, Party B shall promptly notify Party A in writing. (3) Without the consent of Party A and the approval of the local housing management or property management department, the original building load-bearing structure and all kinds of equipment and pipelines shall not be dismantled at will.
- Related articles
- Where is the light of Meixin in Weinan?
- Upstairs water leakage dispute, is the property coordinated?
- What you care most about during the holiday is writing a composition.
- The Relationship between Zhengzhou Shenglong and Yuanfa Real Estate
- What about Shanghai Haiyi Investment Consulting Service Co., Ltd.?
- Is it responsible for the toilet blocking the property?
- What about Suzhou kaqitong electric complete technical service co., ltd?
- How far is Zhucheng, Shandong Province from Yulin Normal University?
- What is the telephone number of Shenzhen Overseas Chinese Town Ruiwanfu Marketing Center?
- Property is also the owner.