Emergency plan for residential property
Accidents happen from time to time in daily life or work and study. In order to prevent things from getting worse, it is often necessary to prepare emergency plans in advance. How to write an emergency plan? The following is the emergency plan for residential property that I have compiled for you. Welcome to read the collection.
Emergency Plan for Residential Property 1 1. Objectives:
In order to ensure that the emergency work of sudden fire accidents in residential areas can be carried out in a timely and orderly manner, to ensure that residents in residential areas can evacuate, rescue and escape in time during emergency rescue and disaster relief, and to minimize the losses caused by fires, this plan is formulated.
Second, the organization and responsibilities:
1, headquarters
(1) Commander-in-Chief of sudden fire accident:
Responsibilities: Make decisions and command according to the actual situation.
(2) on-site command; Service manager; Minister of order maintenance;
Responsibilities: According to the command of the commander-in-chief, be responsible for directing the scene of fire accidents and organizing and coordinating emergency rescue.
2, working institutions and responsibilities
(1) alarm and remedy section
Team leader: Class 1 Monitor of Order Maintenance Department
Members: an alarm officer and three main firefighters.
Duties: Be responsible for putting out the initial fire, report the scene situation to emergency headquarters according to the command of emergency headquarters, and report to the public security fire department.
(2) Evacuation team
Team leader: Minister of General Affairs:
Members: Evacuees around the fire site: two order maintainers, one garage evacuee, one appeaser: one customer.
Responsibilities: Responsible for organizing and guiding the evacuation of people in the fire area to a safe place.
(3) Steering Group
Team leader: class 2 monitor of the order maintenance department
Member: an order maintainer
Responsibilities: Responsible for guiding rescue vehicles and personnel outside the area.
(4) Alert Group
Team Leader: Minister of Order Maintenance on Duty
Members: two administrators.
Duties: Guard around the fire, protect the scene and prevent irrelevant personnel from entering.
(5) medical rescue team
Team leader: monitor of health class
Members: two cleaners (responsible for dressing) and two order maintainers (responsible for carrying stretchers) Responsibilities: Responsible for the rescue and transfer of the wounded.
(6) Logistics Group
Team leader: receptionist
Team members: 2 cleaning staff.
Responsibilities: Responsible for providing necessary material resources for rescue work in time.
(7) Communication Liaison Group
Team leader: back office of comprehensive service department
Responsibilities: Responsible for timely contact with relevant personnel.
(8) Engineering Technology Group
Team leader: maintenance personnel
Responsibilities: Be responsible for the power failure in the community (needed for rescue work).
Third, emergency treatment.
In case of fire, the discoverer should immediately report to the security department, and the order maintenance department should immediately rush to the scene to deal with it after receiving the alarm, and report to the service leader in time to start the emergency plan according to the fire situation. At the same time, according to the site situation, follow certain treatment principles: personnel first, property later; First expensive, then second; First destroy the big, then destroy the small; Cut it off first, and then concentrate on studying the methods and principles of fighting.
(1) When a local fire occurs, and the fire is small and easy to put out, it is found that the personnel use the on-site equipment to put out the fire and report to the safety office in time. After the security personnel arrive, fire extinguishers in other parts can be mobilized to put out the fire according to the situation.
(2) If the fire is large and likely to spread, the Security Department should immediately report to the public security fire department, and report to the leaders of the Service Department at the same time, and notify the relevant personnel to start the emergency plan. After receiving the notice, the relevant personnel will automatically form a working group, get in place quickly according to their respective responsibilities and start work.
(1) The alarm fire brigade shall immediately mobilize its members and fire-fighting equipment for fire fighting and control, and report the fire situation to the headquarters in time.
(2) The evacuation team should quickly open the evacuation door at the scene of the fire and organize firefighters to evacuate to safety according to the evacuation route.
(3) The guiding group sends personnel and vehicles to the east gate to meet the fire truck and guide the fire truck to the scene.
(4) After the arrival of the public security fire brigade, the fire brigade exits the fire site and is transferred to the alert team to assist the public security department in the peripheral alert work.
(5) The medical rescue team should treat the wounded according to the site conditions and send them to the hospital in time according to the injury.
(6) In this process, the logistics team and the communication team should do a good job in logistics support and personnel communication.
According to the notice and requirements issued by the group company, the emergency plan for residential property 2 is formulated in order to do a solid job in flood season prevention of the company and its projects and ensure the property and personal safety of the company and its owners.
I. Organizational structure and responsibilities
(1) set up a leading group for flood control; Team leader, deputy team leader and members:
Responsibilities: responsible for the inspection and maintenance of drainage facilities and equipment of property management company and various projects to ensure that the drainage system is in good condition and effective; Strengthen the patrol inspection of various projects, find leakage points in time, and avoid short circuit and equipment damage caused by rainwater leakage, especially for various projects. High-rise rooms must ensure normal power supply; Responsible for the maintenance of lightning protection facilities and equipment of various projects, and responsible for storing necessary flood control and disaster relief materials; In case of flood disaster, organize maintenance and rescue work in accordance with this flood control and disaster relief plan.
(two), set up four working groups under the command of the leading group for flood control.
1, establish a flood control and emergency rescue team.
Team leader: Members:
Responsibilities: Carry out flood control and emergency rescue work under the command of the leading group for flood control, and each project manager shall organize emergency rescue personnel to conduct a comprehensive inspection of each management area, determine the cause of the accident in the stagnant water area, formulate local emergency measures and organize personnel to deal with it.
2. Set up an equipment support team.
Team leader: Members:
Responsibilities: Under the command of the leading group for flood control, implement flood control and emergency rescue (water pump drainage). According to the actual situation of the project, each project reasonably organizes personnel to use drainage pumps and other equipment to drain the areas with serious water accumulation, so as to ensure the normal management of each management area.
3. Leader of Logistics Support Group: Members:
Responsibilities: Under the command of the leading group for flood control, carry out emergency communication, statistics and logistics support. In the event of a flood, do a good job of information transmission and logistics support within the company, and after the flood, make a statistical summary of the losses caused by the flood.
4. Leader of emergency rescue team: Members:
Responsibilities: Carry out flood control and disaster relief work under the command of the leading group for flood control. When there is a major danger in the project, send personnel to rescue in time.
2. Flood control materials: rain boots, raincoats, shovels, woven bags, flashlights, iron wires, drainage pumps, wire reels, etc. , and designate a person to be responsible for ensuring that flood control materials can be collected 24 hours a day.
Third, the project manager is responsible for flood control in various regions; Strengthen flood prevention awareness training, check the key parts in place, report the danger to the department or company leaders in time, and take active measures to avoid the danger from expanding.
Four, all flood control personnel must keep communication tools open for 24 hours during the flood control period.
5. In case of heavy rain above moderate rain, the project manager must be on duty; In case of rainstorm, a full-time duty system shall be implemented.
Six, when the office personnel on duty after receiving the notice of flood control, should promptly notify the leaders on duty and all the flood control personnel.
Seven, the project personnel on duty after receiving the owner for help information, should promptly notify the leaders on duty and the main members of the project flood control quickly to the scene to check the situation, timely disposal; When there is a large area of water in the management area, personnel should be quickly organized to rush to the scene, and relevant equipment such as pumps should be mobilized to dredge and drain, and at the same time, the company leaders should be reported.
Eight, at ordinary times the project office staff, back office staff, customer service staff should pay close attention to the weather changes, abnormal weather conditions should promptly notify the relevant personnel, at the same time, do a good job in the signature of the personnel on duty during the flood control period, record the major floods.
Nine, flood control materials should strengthen management, after the flood season to warehousing, for future use.
Emergency plan for residential property 3 In order to cope with the situation of water supply and power failure and ensure the normal work and life of the residential area, the emergency plan for water supply and power failure is specially formulated for the reference of relevant departments.
First, the principle of emergency treatment
The community can be divided into planned water and power cuts and sudden water and power cuts, and relevant work should be arranged reasonably to make the community work return to normal as soon as possible.
Second, the water and electricity treatment process
1. In case of planned water and power failure, the owner (residents) and each work unit shall be notified 24 hours in advance, and notices shall be issued in all buildings, bulletin boards in the lobby and electronic display screens in the community. Register the notice on the posted notice and save it. Maintain the relevant equipment normally, and patiently explain to the owner (resident) for support and cooperation. If the water is cut off, use the domestic water tank to supply water temporarily. If the water is cut off for a long time, it is necessary to contact water supply, fire fighting and other units to solve the water supply. Power failure automatically starts, and the generator temporarily supplies power.
2. In case of sudden water and power failure, a brief notice shall be given within ten minutes, and a written notice shall be given within 1 hour, including the reasons and the expected time to resume water and power failure. And inform Zhang to put towels in a conspicuous position in the lobby of each building and save the documents. Repair and maintain related equipment, patiently explain to the owner (resident) and get support and cooperation. If the water is cut off, use the domestic water tank to supply water temporarily. If the water is cut off for a long time, it is necessary to contact water supply, fire fighting and other units to solve the water supply. Power failure automatically starts, and the generator temporarily supplies power.
Third, the management division of labor requirements of each team
(1) office
1. Print and post the notice of water and power failure in time.
2. Arrange the standby water source and start the temporary power supply device.
3. patiently explain to the owner (resident) the reasons for the water and power outage.
(2) Escort class
1, strengthen patrol security during water and power outages.
2, guide the water and electricity maintenance of vehicles, assist in maintenance services.
(3) Maintenance class
1, do a good job of normal maintenance during water and power outages.
2. If water and power are cut off due to failure, it shall be repaired and eliminated in time, and the water and power shall be resumed.
Fourth, prepare emergency supplies.
1, water storage tank and domestic water tank
2, emergency lights, generators
;
- Related articles
- Property parameters of Changsha Brilliance Century Plaza
- When will Taizhou Longhu Tianxi deliver the house?
- Interim Measures for the Administration of Tendering and Bidding of Pre-property Management
- Is the property management of the range hood hole? Or should the house itself have flue holes? My house is a second-hand house .. I just found that the hole of the range hood is not perforated .. Ther
- Is Hunan Jiantou Liujian Group Co., Ltd. a state-owned enterprise?
- When will Wuxi Longhu Lin Yun Fu Shang deliver the house?
- What is the telephone number of Zhengzhou Poly Yonghe Real Estate Development Co., Ltd.?
- Real estate? What is the connection between real estate and property?
- What is the telephone number of Hengyang Hengdeheng emerald city Sales and Marketing Center?
- How about Shangming International Community? OK or not? Is it worth buying?