Job Recruitment Website - Property management - Can the fifth floor of the high-rise be changed to independent launch?
Can the fifth floor of the high-rise be changed to independent launch?
Independent launch method
The transformation method of independent launching on the fifth floor is to take out the basin drainer and remove the fixed parts and flanges under the drainer. When installing the basin, pay attention to pick up the basin table, take out the drain flange and fasten the drain flange on the basin. After tightening the flange, put the basin on the countertop, and align the drain outlet with the water outlet of the countertop. This step is the key point to start the basin.
Wrap the raw material belt at the proper position of the drain to prevent water leakage. It should be noted that when installing the basin, the drain must be aligned with the drain of the basin. Aim the drainer at the drain and put it in smoothly. Note that during the installation of the lower basin, the fixer of the drainer must be taken out and screwed on the drainer, and remember to tighten the fixer with a wrench. After the basin is put into the water, it should be tested. Fill the basin with water and see if there is any dripping or leaking.
- Related articles
- What are the top three hospitals in Ji 'an?
- Summary of work in the stage of suspension of classes and non-stop learning
- Yishijia property
- Is there any legal document in Nan 'an stipulating that rough houses can pay less property fees?
- What properties are there in Huaqiao?
- Shanxian Longsheng heating telephone
- How to get to Xuzhou Guanlan Bieyuan by subway?
- How about Taizhou Dinghao Property Management Co., Ltd.?
- What is the telephone number of Guangzhou China Railway Construction Global Center Marketing Center?
- Is there a railway training institution near Huangjiu District and Jingjiayuan Community in Shenyang?