Job Recruitment Website - Property management - Someone downstairs deliberately unscrewed my sewer nut, causing me trouble. What should I do? I complained before that he went to the city management without taking a canopy.

Someone downstairs deliberately unscrewed my sewer nut, causing me trouble. What should I do? I complained before that he went to the city management without taking a canopy.

According to "Implementation Opinions on Strengthening the Governance of Illegal Construction"

Two, the Urban Management Bureau found the following circumstances after preliminary investigation, not included in the scope of identification and investigation of illegal buildings:

(two) according to the provisions of the current urban and rural planning laws and regulations, the following circumstances have not been clearly included in the scope of adjustment of urban and rural planning laws and regulations:

1, an integrated car washing device installed in gas stations, parking lots and other business areas;

2, residential building external wall air conditioning rack, canopy, security window, single-layer solar equipment and other facilities;

3. Interior decoration of the building (excluding damage or unauthorized change of the bearing structure and main structure of the building);

4, smokeless stove, outdoor flue, central air conditioning outdoor sound insulation renovation facilities;

5. Pet sheds, pigeon houses, fences and other facilities set by the owner within the exclusive right to use;

6, simple communication antenna, vehicles in and out of the gate, traffic lights, guardrail, electronic police and other road traffic management facilities;

7, all kinds of signs, markings, boundary markers, monitoring and monitoring facilities;

8, large and medium-sized or protected building facade decoration, facade decoration;

9. Simple bicycle kiosks, bus kiosks and doorposts.

Extended data

Illegal building:

3. According to Article 64 of the Urban and Rural Planning Law of People's Republic of China (PRC), Article 62 of the Regulations on Urban and Rural Planning of Jiangsu Province and Article 57 of the Regulations on Urban and Rural Planning of Nanjing, the following construction behaviors belong to the situation that corrective measures such as planning permission cannot be taken to eliminate the impact, and the urban management bureau will handle them according to law, and it is no longer necessary for the Planning Bureau (sub-bureau) to issue a separate identification opinion:

(a) unauthorized building (structure) roof, floors, terraces, flower ponds, equipment platforms, sun rooms, prefabricated houses, glass roofs and other components closed or closed;

(two) the house is built at the bottom of the courtyard, with a parking lot.

Four, the following circumstances, by the Planning Bureau (branch) issued a planning opinion, investigated and dealt with by the Urban Management Bureau according to law:

(a) illegal construction found by the Planning Bureau (sub-bureau) in the post-approval supervision.

For the illegal construction found before the verification of the completion plan of the construction project, the Planning Bureau (sub-bureau) shall issue an opinion on the illegal construction, and transfer the construction project that has not gone through the planning acceptance procedures or cannot go through the planning change in advance because it does not meet the planning requirements, and the urban management bureau shall handle the illegal acts according to law.

(two) urban management bureau found in the supervision and inspection of suspected illegal construction, and in line with the following circumstances, please ask the planning department to issue a confirmation opinion and investigate and deal with it according to law:

1. started construction without obtaining the planning permit of the construction project, but obtained the review document of the design scheme of the construction project;

2 to obtain the construction project planning permit, but not in accordance with the provisions of the construction project planning permit for construction, directly transferred to the Planning Bureau (branch) according to the batch of regulatory procedures;

3. In the daily law enforcement, the Urban Management Bureau is difficult to grasp the authenticity and validity of the planning warrants provided by the illegal construction subjects (parties), and the Planning Bureau (sub-bureau) provides check opinions;

4. Other construction situations that do not belong to the provisions of Article 2 of the Implementation Opinions.