Model contract for hydropower installation, escorting hydropower projects.
Party A: _ _ _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ _ _ (hereinafter referred to as Party B)
Party A and Party B have reached an agreement on the subcontracting of water, electricity, fire protection and weak current installation services in Kangtian Nanchuan 18 plot in accordance with the Contract Law of People's Republic of China (PRC), the Building Law of People's Republic of China (PRC) and relevant laws and regulations, and in line with the principles of equality, voluntariness, honesty and trustworthiness. The terms of the labor subcontract are as follows, which shall be abided by both parties.
I. Project Name: XXXX
Two. Project location: XXX
Third, the scope of project contracting
Scope and content of the project: all civil construction areas in the construction drawing, all water, electricity, fire protection and weak current installation works (the engineering quantity will be calculated separately after major changes in the construction drawing).
(1) embed and install indoor water supply pipe network, from one household to one meter on the floor to the indoor water use position;
(2) The indoor and outdoor drainage pipe network is embedded and installed, and connected to the first outdoor inspection well;
(3) Embedded installation of indoor electric lighting lines, cables, bridges, panels and cabinets;
(4) Embedded and installed indoor lighting lamps and switches;
(5) Install all lines and equipment from transformer and generator low-voltage screen to electrical equipment;
(6) Lightning protection and grounding installation;
(7) All fire fighting pipe networks are embedded, and the equipment is installed;
(8) Weak current embedding and equipment installation;
Fourth, the time limit for a project requirements
Party B must complete the project before _ _ _ _ _. Party B shall cooperate with the general contractor to complete all construction tasks before the general contractor's pre-acceptance. After debugging and self-inspection, the completion required by Party A means that the project is completely completed and qualified.
Verb (abbreviation of verb) quality standard
Project quality: according to the quality agreement in the general (sub-) contract, the current national construction and acceptance specifications and quality evaluation standards for construction and installation projects, this project must reach the qualified level of quality evaluation.
Six, the project contracting way:
Contract project, package installation (including lightning protection and grounding, fire protection and weak current), package quality, package civilized construction, package completion debugging and acceptance methods. According to the time limit stipulated by Party A, this project will pass the acceptance of relevant departments and be delivered for use ... by fixing artificial price.
Seven. Contract price
The contract price is RMB: 23.00 yuan per square meter (based on the construction area), which belongs to the general contract. The total price includes labor, machinery, installation auxiliary materials, building installation, debugging, insurance, risk and accidental injury insurance and other expenses.
Eight. Payment and settlement methods
7. 1 Due to the large quantity of work and short construction period, it is planned to pay the labor cost by installments;
7.2 After Party B's capping, Party A shall pay 20% of the corresponding labor costs;
7.3 After Party B completes all services, Party A shall pay 60% of the total services monthly according to the image progress;
7.4 When the project is completed and accepted, Party A shall pay 15% of the total labor cost.
7.5 5% of the total labor cost is used as the project quality deposit, and the warranty period is 2 years. Upon the expiration of the warranty period, if there is no quality problem, Party A shall pay Party B in one lump sum within 15 days after the construction unit and the user unit have no objection.
Nine. design alteration
Both parties shall negotiate amicably for the part of the project payment which is obviously increased due to the construction change, and the delayed construction period shall be postponed accordingly according to the main contract.
X. Supply of materials and equipment
1. All main materials (unmarked materials) used in the hydropower project of this contract shall be purchased and supplied by Party A, and all auxiliary materials (marked materials) shall be borne by Party B. ..
2. Party B shall provide all tools and instruments for water and electricity installation, and Party A will no longer provide corresponding tools and instruments.
XI。 Responsibility of both parties
1 Party A's responsibilities
(1) Drawings, descriptions, joint review of drawings, design changes, design notices and design changes provided by Party A on time for water supply and drainage, electrical, fire protection and weak current installation involved in the project.
(2) Party A shall designate the site to be responsible for coordinating and managing the construction site, and handle relevant visas.
Fourteen Other management systems
1. Party A and its project manager shall implement the attendance system for Party B, and Party B must provide sufficient personnel to meet the construction needs of the construction site. If Party A is absent from work for no reason (including absenteeism, lateness, absenteeism, etc.). ), Party A will charge Party B liquidated damages according to 200 yuan (times) per day.
2. If Party B's staff is found to have stolen or damaged Party A's property, they will be fined 100- 1000 yuan, and their legal responsibilities will be investigated according to law.
15. Matters not covered shall be settled by both parties through negotiation.
1. This contract shall come into effect after being signed and sealed by both parties, and shall be terminated after the tasks within the contract are completed and the balance is settled.
2. This contract is made in quadruplicate, two for each party, with the same legal effect.
Party A: _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
ID number: _ _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Tel: _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _ _ _ _
Date: _ _ _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
The above is a model contract for water and electricity installation. I hope this model can help everyone!
Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~
- Related articles
- How far is it from Dieshi to Yun Jie Longxin Garden on the Silk Road in Haimen High-tech Zone?
- How does the property on the ceiling of the house cooperate? I am a salesman on the ceiling of the house. How to cooperate with the properties in the community?
- How to handle the qualification certificate of property management enterprises?
- How about Zhejiang Tianyun Architectural Design Co., Ltd.?
- Owner's New Year greeting
- Introduction of super high-rise buildings in Chengdu?
- Why is Chengdu Park Mansion cheap?
- What's the telephone number of Huaibei R&F Xiangcheng Sales Department?
- Is Anyang Evergrande Oasis a Rich Area?
- What budget should I make before buying Guohua Building, and what precautions should I take when renting a house?