Overview of home improvement construction management system;

The first chapter civilized construction

First, the preparation work before construction

1, the construction personnel must obey the arrangement of the company, obtain the consent of the owner in advance and actively cooperate with other types of work before staying at the construction site.

2, stationed in the construction site on the same day, must be the construction unit signs, safety warning signs, construction site management table. Appropriate fire extinguishers and sandboxes should be provided in conspicuous places. 3. After receiving the notice of commencement, the construction personnel should be familiar with the construction environment in time, and set out the site together with the designers according to the design drawings, so as to carry out the site construction in a reasonable and orderly manner. The text contents such as the project schedule and the list of construction personnel must be filled in and improved.

4. In order to ensure the safe and normal work of the company, all personnel who have gone through the employment formalities without consent shall not participate in the company's construction projects and shall not enter or leave the site at will.

Second, during the construction period

1. The person in charge of the on-site engineering department has full authority to manage the construction site and make unified arrangements. The construction personnel should contact the on-site engineering personnel if they have something to do. If they can't, they can contact the on-site quality inspector or other management personnel, and they are not allowed to act without authorization.

2. During the construction period, construction personnel are not allowed to drink, smoke and fight at the construction site. Go to the designated place of the property after defecation, and don't use the customer's sanitary ware and all other items. Clean up every day and put the garbage in the bag.

3, workers must ensure the environmental sanitation of the construction site, toilet clean, can not have garbage, water; Materials shall be placed in an orderly manner, classified and stacked neatly, and placed in a dry area. Construction waste should be cleaned up in time and transported to the place designated by the company. After daily construction, clean up the construction site to ensure that there is no garbage accumulation.

4. Materials shall be classified and stored in the place designated by the company. Fake and shoddy materials are strictly prohibited from entering the construction site. All materials shall be inspected and stamped by the company. Reasonable allocation, listing detailed usage details; It is forbidden for one material to be used by another. Once found, hell to pay.

5. Pay attention to civilized language during construction, maintain the civilized image of the company, respect the opinions and suggestions of the owner, and avoid any contradiction or conflict; Take care of the owner's facilities and finished products, and don't damage them. Don't ask the shopkeeper for items, don't make unreasonable demands on the shopkeeper, and don't steal or use the customer's items without permission.

6. Construction personnel shall strictly implement the company's process standards and acceptance standards, and shall not miss or make mistakes. It is strictly forbidden to waste materials and change the content of the project at will. When there is deviation or error between the drawings and the construction site, contact the design in time, and blind construction is strictly prohibited.

7, site construction should strictly abide by the relevant national construction technical operation specifications, and must not be allowed to cut corners, once found, immediately removed and held accountable.

8, construction personnel should be in strict accordance with the design and construction, shall not be changed without authorization. If any design problems are found, contact the site management personnel or designers as soon as possible, and obey the instructions of the person in charge of the site engineering department.

9. During the construction period, the construction personnel shall keep the communication unblocked, and it is forbidden to stop work without reason, leaving no work behind, and no materials shall be taken away from the construction site without the consent of the company.

10, construction personnel should pay attention to the safety of electricity and hot work, strictly abide by the relevant national operating specifications for power tools, welding, etc. Save water and electricity, and it is forbidden to connect the power supply of construction machinery without plugs and sockets.

165438+ The quality problems in the construction shall be rectified in time, and shall not be concealed or shirked, and the corresponding daily construction log records, weekly construction arrangement plans and construction material arrangement plans shall be made.

12, properly keep the decoration materials provided by the owner and the original indoor facilities that must be preserved, and protect the wearing parts.

13. Abide by the relevant regulations of the property management unit and do not operate illegally.

14. During the construction period, the gate of the construction site must be closed so as not to interfere with the daily life of neighbors.

15, abide by the law, do not participate in social disputes, do not make much ado about nothing, and other personnel are strictly prohibited from staying at the construction site. Non-construction personnel are not allowed to enter the construction site.

Chapter II Safety Construction

1, each project construction team must establish a high degree of safety awareness, formulate relevant safety management systems, strengthen safety knowledge education, and raise awareness of the importance of safety construction. No illegal command or violation of operating procedures.

2. Smoking or open flame is strictly prohibited on the construction site. It is forbidden to connect electricity without permission. Power tools must be safely grounded, and there shall be no exposed wires in any area of the construction site. Temporary power consumption for disassembly and assembly must be operated by professional electricians. Those who leave after work should cut off the power supply to ensure the safety of electricity use.

3, save water, the valve closes as you use it, and it is not allowed to cause water seepage failure due to construction damage to hidden pipelines. Temporary power consumption must have protective devices, wires must use rubber flexible wires, and electrical equipment plugs are complete. It is forbidden to plug the wire directly into the socket.

4. Before climbing, check whether the safety performance of climbing facilities and tools is qualified, whether protective measures are in place, and the technical essentials of climbing operators must be skilled. When working high above the ground, there should be a special person to monitor the site. Before use, wooden benches and miter ladders must be checked to ensure that they are firm.