How to write the work contact list of the slowdown caused by Party A's materials?
Project name: Champagne International: Huazun Real Estate Development Co., Ltd. | The project is about to resume work, and the following items exist in the project:
1, the electricity in the workers' living quarters is not turned on, and the water flow is too small; 2, 4#, 5#, 6# building main cable for 70_ aluminum core, 3+ 1, whether can withstand the construction of three buildings, meet the specification requirements;
3, 4#, 5#, 6# building construction water specific how to arrange;
4, 4#, 5#, 6# building on the north side of the high voltage line above the site there are security risks;
The site on the north side of Buildings 5#, 4#, 5 # and 6# is not leveled in place, so it needs to be leveled again after the foundation of our tower crane is completed. I hope your company will solve it as soon as possible after receiving it and give a written reply.
Construction unit:
Project leader of the construction unit:
Date: 2065438+February 20, 2007.
Extended data:
Classification and filing of Party A's data:
1. The engineering supervision data is formed by the engineering department responsible for engineering supervision. The mine engineering supervision engineer shall hand over the supervision process data within three days, and other supervision data shall be handed over to the engineering department after the phased project is completed.
2. The project supervision data entrusted by the supervision unit shall be formed, compiled and kept by the entrusted supervision unit, and shall be handed over to the engineering department reference room after the project is completed, and the engineering department librarians shall supervise and inspect the formation of the supervision data.
3, engineering construction data, mainly by the engineering department supervision and control, the construction unit is responsible for the preparation, collection, sorting, and in each division after the completion of the project, unified handed over to the engineering department reference room within a month.
- Previous article:What is the international plot ratio of Foshan Zhongnan Riverside?
- Next article:Is there an elevator in Dahua Grey Butterfly Tree?
- Related articles
- Can I change the lock core of the security door? How to change the lock core of the security door?
- Does the property management company have the right to cut off water and electricity and not pay property fees?
- Is it illegal to seal the balcony in the community?
- How about Xuzhou Oil and Gas Transportation Technical Service Branch of China Petrochemical Group Pipeline Storage and Transportation Company?
- What is the telephone number of the marketing center of Yungu Academy in Urumqi?
- How about Jialing Malcolm Hotel Co., Ltd.
- What's the telephone number of Beijing He Chun Impression Marketing Center?
- What about Luoyang Yaju Door Industry Co., Ltd.?
- Where does shanghai finance university's teacher live?
- What is the telephone number of the second-phase sales office of Jiaxing Garden in Wuhan?