How to arrange the decoration time reasonably
How to arrange the most reasonable time for the renovation of new houses?
1, at least ten days before the start of construction, we should choose a good decoration company and communicate with the designers of the decoration company about the design scheme of the decoration. In addition, the decoration company should send people to do a good job of field measurement on the construction site together with the owner, and draw various construction drawings according to the measured data. Owners and designers should make some adjustments to the decoration scheme according to the specific measurement results and set the final design scheme.
2. At least five days before the start of construction, the owner should sign a contract with the decoration company. Determine the types and grades of materials to be used in home decoration, check the decoration quotation given by the decoration company, and sign the renovation contract with the decoration company after confirming that there is no problem.
3. At least three days before the start of construction, the owner should greet the property and neighbors, go through relevant formalities, and inform neighbors of the time of their own renovation to avoid conflicts between neighbors caused by renovation noise. Some building materials and decoration accessories need to enter the site in advance at this time. The owner should give the key to the construction foreman and part of the decoration money to the decoration company.
4. Two days before the construction, we mainly demolished and rebuilt the house and made some adjustments to the overall structure of the house to facilitate our daily life in the future. In the process of demolition and reconstruction, not everything can be moved, and the owner should follow the advice of professional construction personnel to avoid potential safety hazards in the overall structure of the home.
5. The initial construction period is five to ten days, which is mainly used for the renovation of hydropower projects. Do a good job in the layout of water and circuits, and waterproof where necessary. After the completion of hydropower transformation, a hydropower acceptance work must be carried out. After the acceptance, proceed to the next decoration construction.
6, ten to twenty days after the start, is the main time of woodworking projects. During this period, carpenters will start to install ceilings, make door and window covers and build furniture. After the woodworking project is completed, the painter will come in again to paint the woodworking project.
7. Twenty to thirty-five days after the start of construction, it is mainly the construction of mud tile project and part of painting project. During this time, we should start to deal with the walls and floors. It's time to lay the tiles, paint them, and paint them with latex paint. When painting, don't rush to paint the second and third times in order to catch up with the construction period. Before proceeding to the next operation, you must wait until the paint in the previous step is completely dry.
8. Floor workers should lay wooden floors, cabinets, sanitary wares and some household appliances 35-50 days after the construction starts. , should also gradually enter the site and complete the installation.
9, 50 days to 60 days after the start, mainly for the overall decoration acceptance work. After acceptance, the owner should settle the money with the decoration company. If there is a problem with the acceptance, the owner has the right to let the decoration company give a reasonable solution.
- Related articles
- When will the artistic environment of Handan Jindi Hanshan be delivered?
- Property charging standard of Changsha Juyuan community
- What are the construction projects in the new urban area near Fuqiang Jiayuan in Yutian District in 2022?
- Has Huaibei Bile City opened?
- What's the surrounding environment like in western cities? Is life convenient?
- What does property management mainly do?
- Detailed architectural drawings of Huai Mine in Taiping Shengshi.
- Qingdao World Expo City Address
- Classic sentences describing Wang Siheyuan
- What's the telephone number of Lanzhou Wanfucheng Sales Department?