Job Recruitment Website - Property management - What are the decoration links?
What are the decoration links?
1. Preliminary preparation
The first step is to define the housing demand, the second step is to plan the decoration budget, the third step is to determine the decoration method, the fourth step is to pay the decoration deposit, and the fifth step is to confirm the design scheme and sign the contract.
2. Start disclosure
Check the construction drawings, budget quotation and design details, confirm the construction technology and decoration materials of all projects, and do a good job of confirmation before construction.
After the completion of the decoration disclosure work of Yezhifeng, a groundbreaking ceremony will be held according to the predetermined time to celebrate the smooth start of the construction.
3. Finished product protection
material purchase
(1) Purchase of large-scale equipment such as central air conditioning, fresh air and water purification;
② Determine whether to replace the entrance door in advance and determine the style of kitchen appliances.
Matters needing attention
Before the official start of construction, use special protective film to protect doors, windows, walls and floors.
4. The main body is demolished and changed
Process flow? Demolition protection, a shovel wall, a new wall, garbage removal, central air conditioning, fresh air positioning, cabinet size measurement.
Material procurement? Whole house tiles (7 ~ 15 day order cycle), check valves, lintels, bay window stones, floor drains, wall cabinets, concealed embedded parts and intelligent equipment.
Matters needing attention
At this stage, it is necessary to determine the style of water heater, the style of kitchen appliances, the position of cupboard and wardrobe, and the hidden light belt in advance;
(2) pay attention to waterway protection to prevent blockage, and plan the position layout of switch sockets in advance;
(3) Before water and electricity enter the site, determine whether the gas pipeline needs to be shifted, and whether fresh air, central air conditioning, floor heating, water purification system and backwater system need to be installed.
5. Hydropower transformation
Process flow? Water and electricity disclosure, material entry, water and electricity transformation, pay-off and slotting, strong and weak electricity distribution, water supply and drainage distribution, and water and electricity acceptance.
Material procurement? Water heater, bathroom main material, stone material, etc. , clean water, wall-mounted toilets, etc. Enter the market.
Matters needing attention
① Determine the number of switch panels and the specific points of switches, lamps, basins, bathtubs, washing machines, etc.
(2) Determine the customization of the whole house, the brand of doors, the style of aluminum gusset ceiling and wood floor (consider leveling to determine the thickness).
6. Bricklayer stage
Process flow, bricklayer's disclosure, material entry, waterproof treatment, wall leveling, brick laying and bricklayer's acceptance.
Material selection
(1) ceiling, yuba, water heater, interior door are purchased, and tiles, bathtubs, doors and windows enter the site;
(2) After the bricklayer, you can book the purchase of wall tiles and floor tiles.
Matters needing attention
(1) Before plastering wall tiles, the toilet and balcony should be tested for water closure;
(2) After the bricklayer completes, the whole house shall be customized to determine the replenishment cycle of tiles.
7. Woodworking stage
Process flow: carpentry disclosure, ceiling setting-out, keel installation, gypsum board sealing, background wall and decorative modeling, and completion acceptance.
Material selection
① Purchase floors, switch panels, partition materials and hardware, and select and install embedded lamps such as track lights and light strips;
(2) The style of latex paint, the opening position of lamps, the selection and measurement of curtains in the whole house.
8. Paint stage
Process flow? Oil workers shall make disclosure, level the wall surface and top surface, polish the wall surface, paint the color, and complete the acceptance.
Material selection
(1) When wood paint, metal paint, plastering line, latex paint and wall wallpaper come into play;
(2) Customize the feet of the whole house and the feet of the interior door (to prevent color difference, it is recommended to complete the installation of the interior door before painting).
Note: the closet of latex paint needs to be re-measured after the oiler finishes.
9. Installation of main materials
(1) joint of wall brick and floor tile;
② Installation of switch sockets and lamps (except embedded lamps such as track lamps and light strips have been purchased and installed in woodworking stage, other chandeliers and wall lamps are installed in this stage);
(3) wooden floor, skirting installation (choose the right color in the design stage, and then choose after hard installation at the latest);
(4) Installation of integrated ceiling for kitchen and bathroom (can be booked and purchased after bricklayer's work);
⑤ Customized installation of cabinets in the whole house;
6. Installation of electrical appliances and sanitary ware (styles and sizes of embedded electrical appliances and sanitary ware shall be confirmed in the hydropower stage);
⑦ Installation of indoor doors (including sliding doors, which can be measured and purchased in woodworking stage).
10. Land reclamation and cleaning
After the installation of the main material is completed, we need to clear up the wasteland and clean up the garbage left in the decoration. Mainly includes: glass cleaning; Dust removal and maintenance of indoor walls, various countertops, ceilings, decorative ceilings, various cabinets, screens and lamps; Ground cleaning; Decontamination and disinfection of kitchens and bathrooms; Treatment of traces after decoration, such as cement, gypsum, paint spots, glue, paint, cement blocks, etc. Stay on the wall; Waxing treatment and maintenance of wooden floor, marble floor and granite floor; Include stone protection and crystal hardening treatment.
1 1. Soft mounted display
(1) curtain wall installation (measures can be purchased after the ceiling is completed (the order cycle is about 7- 15 days);
(2) Installation of main lamps, wall lamps and other lamps;
3. Installation of soft furniture and accessories such as sofas and beds (1 ~ 2 days).
At this point, the whole renovation process has come to an end, and it will take 1-3 months to move into the new house. Remember the detailed list of professional decoration process order and analyze the decoration order in detail, so that everyone can take fewer detours!
- Previous article:Will Humen Fumin Garden in Dongguan be demolished?
- Next article:When will Gu 'an Jingnan Eco-city deliver the house?
- Related articles
- What are the rights and obligations of the property?
- How about Rizhao Jiang Hao Building Materials Co., Ltd.?
- How about Hangzhou Huai Jin Property Management Co., Ltd.?
- How to set up a mobile phone access card
- 20 1 1 Jacky Cheung Shijiazhuang concert venue
- How many years is the property right of Baoding East Asia Zhenyuan Garden?
- Aviation New Town 1 Is the traffic convenient? How should I get there?
- Is it illegal to complain about cleaning the property and then cleaning it and knocking at the door?
- How about Guangzhou Sheng Yuan Property Management Co., Ltd.?
- Attributes that can be connected.