Job Recruitment Website - Property management - Who knows what standard the hardware facilities of 5A office building are? In particular, the access control system and monitoring system are introduced in detail.

Who knows what standard the hardware facilities of 5A office building are? In particular, the access control system and monitoring system are introduced in detail.

I. Building Equipment Automation System (BA) The building equipment automation system can monitor and control the water supply and drainage equipment, refrigeration equipment, power supply system, elevators and automatic handrails of the whole building. Mainly based on condition monitoring, supplemented by start-stop control.

1 air conditioning automatic control system

2 Automatic water supply and drainage control system

3 Power transformation and distribution monitoring system

4 elevator monitoring system

Second, the security system (SA)

1 Closed-circuit monitoring system: the entrance and exit of the underground garage, and the lobby on the first floor is equipped with a color zoom camera with a pan/tilt. Building cabinet

Fixed black-and-white fixed-focus cameras shall be set at floor entrances and exits, elevator cars, etc. The corridors in the office building are set in black and white.

Fixed focus camera, black-and-white zoom camera and pan-tilt camera in underground parking garage.

Anti-theft alarm system: the main entrance and exit of the office building is equipped with door magnetic switch, electronic door lock and card reader.

Parking management system: internal vehicles use special parking cards, and external vehicles use temporary ticket vending machines.

Communication automation system

1 Integrated wiring system: Integrated wiring supports telephone system and computer network system, and is an open network.

Platform. Indoor laying of overhead floor, ground trunking and network floor. The design institute completed the laying of the main road. Provide 5

Information channel of integrated wiring based on class line.

2. Wireless communication forwarding system: mobile signal enhancement system installed on all floors of the office building.

OAS

Application software system focusing on property management, public information service, smart card management and shopping center management.

Five automatic fire alarm and fire linkage control system (FA)

1 is equipped with intelligent simulation function, which is used for automatic fire alarm and automatic fire extinguishing and fire fighting linkage control.

Broadcast sound system: the fire emergency broadcast system and public broadcast share a set of broadcast system.

Disite (International) Indoor Space Design Agency