The Secret of Office Building Decoration Construction Process

Office decoration is a complex project, which needs to be completed through several stages of construction. This paper will reveal the process of office building decoration and help you better understand the process of decoration.

Construction method

Construction practice is the key entry point of office decoration, which requires communication among owners, decoration companies and properties. After the construction team enters the site, it will work closely with the designer to clarify the design details, such as the location of switches and sockets, the wall that needs to be preserved or dismantled, the faucet and drainage arrangement of the bathroom, and the parts that need special treatment.

Hydropower engineering stage

Hydropower project stage is the "heart" of office decoration, including knocking on the wall, building the wall, opening the wall, laying wires, drainage pipes and other concealed works. Be careful when you accept it.

Mud carpentry stage

The carpentry stage consists of two parts: masons and carpenters. Masons are responsible for the laying of bathroom wall tiles and balcony floor tiles, as well as the laying of bathtub foundation and ground waterproof layer. Woodworking is committed to the production of ceiling base, molding wood base, door cover base, as well as wooden windowsill, wooden cabinet, veneer wood engineering, etc. This stage is usually carried out at the same time as the mason stage, which takes about 3-4 weeks.

Paint construction stage

The paint construction stage mainly involves the completion of wood surface putty, back cover and top coat, as well as the surface treatment of office walls, the pasting of putty, primer, top coat and wallpaper. It takes about 1-2 weeks, depending on the office size and construction difficulty.