Job Recruitment Website - Property management - Structural equipment of Yuehai Tianhe City Building

Structural equipment of Yuehai Tianhe City Building

1. Project design company: Hong Kong Bama Dana International Company and Guangzhou Design Institute. The total construction area of the office building is103,000 square meters, the total height of the main body is 195 meters, with 45 floors in total and the standard height is 4.05 meters. The fifth to forty-fifth floors are offices, and each floor has a construction area of about 2270 square meters. The fourth, nineteenth and thirty-third floors are refuge floors.

2. The first floor entrance elevator lobby is located on the east side of the office building, next to the planning road on the east side, and the first and second floors are connected with Tianhe City underground parking lot, providing about 900 parking spaces.

3. The office building * * * is equipped with 22 vertical passenger elevators, which are divided into five elevator zones from the first floor to the 45th floor. Each elevator zone * * * is equipped with 4 elevators 1350kg, and the elevator speed varies from 2.5m/s to 5m/s ...1/kloc-0 is set from the first floor to the second floor. There are elevators from the basement to the basement, which provide people in parking lots and subway entrances with transportation other than vertical elevators. There is also an 800kg, 3.5m/s fire elevator and a 1350kg, 3.5m/s fire and service elevator.

4. The exterior wall is a curtain wall composed of energy-saving LOW-E coated hollow environmentally-friendly glass and fluorocarbon coated aluminum wires.

5. The low-voltage distribution system adopts 220/380V, 50HZ, TN-S TN-S system. Closed copper busways are set in each hierarchical power distribution room, power supply boxes are reserved for tenants, and standby power supply facilities for tenants are set in each hierarchical power distribution room.

6. Establish an integrated information network system in the office building, including telephone system, integrated wiring system and mobile phone coverage system. Cable TV system, security and closed-circuit TV system, entrance guard monitoring system, burglar alarm system, security patrol system, public address system, building automation system, etc.

7. VAV air conditioning system is adopted, which has the performance of purifying and filtering air, low noise and sufficient fresh air.

8. All floors of the office building are equipped with automatic sprinkler system and automatic fire alarm system. The fire resistance limit of the firewall or fire shutter between fire zones is not less than 3 hours, and each fire zone is provided with not less than 2 safety exits.

There is a helipad at the top of the office building.

10. delivery standard: provide suspended ceiling, lamp board with air outlet and air return outlet, and elevated platform.

1 1. In order to ensure the unified property image and high-quality property management of the building, the mode of "only renting but not selling, single ownership" is adopted.