Minutes of design scheme review meeting
After a design scheme comes out, it needs to be reviewed before it can be finally adopted. Let me share with you some minutes of the design review meeting for your reference!
Minutes of Design Scheme Review Meeting 1 12 On the morning of February 7th, two planning and architectural design scheme review meetings were held in the conference room on the seventh floor of County Construction Bureau. The meeting was presided over by the deputy director of the County Urban and Rural Construction Bureau, and attended by relevant leaders of the town government, Chengbei New District Office, County Water Conservancy Bureau, relevant experts, developers and relevant design units. The meeting carefully considered the two design schemes, and the minutes of the meeting are as follows:
I. Detailed Planning and Architectural Scheme Design of Pedestrian Street
1. Considering the present and long term, adopting a reasonable business model and positioning the business form will help to form the future business atmosphere and management, and appropriately optimize the overall layout. The middle of the building with too long length should be disconnected, and the chamfer radius of the entrance of the credit cooperative should be increased. It is suggested to cancel the 10# triangle building complex and set up supporting facilities such as property management, garbage collection and parking. It is suggested that the public parking lot in the northwest corner should be implemented at the same time as this land.
2. Simple Luling style design is agreed in principle, but the overall color on the renderings is dark, the details can be decorated with warm ribbons, and there are too many facades, which should be simplified.
3. It is suggested that single building should not use a staircase, and 1#, 3#, 4#, 5#, 6#, 7#, 8# and 9# bedrooms with balconies are too small.
4. Guiding landscape signs should be set at the entrance, and special planning should be made for greening, landscape, drainage and sewage discharge. The combination of parking and greening can appropriately improve the green rate, and recommend local tree species for greening.
Second, the scheme design of flood control and drought relief dispatching command center in Chengbei New District
1. General layout: Scheme I is agreed in principle, but it needs to be optimized and adjusted. The distance from the court building is small, but due to the adjustment of Jizhou route type, the overall width and depth of the building should be compressed and moved slightly to the north to increase the space of the front yard.
2. Facade effect: the width of outdoor stairs at the main entrance should be reduced; The vertical line of the main facade is thin and broken, and it is appropriately bold; Considering the layout of outdoor air conditioning hanging machine, the location should be hidden, and the north facade renderings should be perfect.
3. Single building: it is suggested that the meeting room be located in the north and the office be located in the south.
4. Adjust the layout of parking spaces in the southwest corner of the land, and set parking spaces in combination with greening.
5 improve the layout of greening, drainage, sewage, electricity, telecommunications and other supporting facilities.
Minutes of Design Scheme Review Meeting II On September 7th, 20XX, an expert review meeting on detailed scheme design of the relocation project of monitoring, communication and charging sub-centers was held in the conference room on the second floor of the office building of Puhe Management Office. At the meeting, the designer made a brief report on the design scheme and answered some questions raised by experts on the spot. Experts attending the meeting visited the construction site and listened to the report of the design unit. After full discussion, their opinions are as follows:
1. Detailed scheme design of the relocation and reconstruction project of the computer room of the monitoring and communication billing sub-center. The technical scheme is scientific and practical, the document content is detailed, the technology is economical and reasonable, and the design depth meets the requirements; It can meet the requirements of construction bidding and guiding construction.
Second, the experts' opinions and suggestions on the design documents:
1. Because the new computer room is unattended, a single air conditioner should adopt quasi-industrial split air conditioner, so that the air conditioner can automatically start and run according to the original set parameters when the call comes in after power failure.
2. It is suggested to add the content of equipment relocation sequence (recommendation) in the design scheme.
3. It is suggested to move all the monitoring cabinets behind the monitoring TV wall in the monitoring hall to the old communication room.
4. It is suggested that heptafluoropropane fire fighting equipment be changed into dry ice fire extinguishers with more environmental protection and higher cost performance.
5. Considering the safety and full utilization of space, it is suggested to cancel the original glass partition of the new computer room and increase the buffer room (glass partition). The equipment in the computer room is divided into professional areas.
6. It is suggested to standardize and mark all the reconstructed equipment lines; And after the relocation of equipment, equipment, cable specifications and other content.
Signature or seal of audit team leader:
Signature or seal of the members of the review team:
;
- Related articles
- How about Zhenjiang Haihong Iron and Steel Co., Ltd.?
- What's the telephone number of Yaluan Business Department of Huludao Academy?
- How about Anding Real Estate Development Co., Ltd. in Dingyuan County, Anhui Province?
- Do I have to pay taxes on parking spaces?
- Is it guaranteed that grain and oil will join the house exchange platform?
- What's the telephone number of Wan Li Marketing Center of Junfengshan in Chongqing?
- What is the sales service hotline of Shangqiu British Mansion?
- List of national property fee charging standards
- What are the related introductions of Shili Silver Beach in Country Garden?
- Is Guohua Netan a state-owned enterprise?