Emergency Plan for Typhoon Prevention of Ships (General)

We should plan ahead for the arrival of natural disasters and write emergency plans. The following is the Emergency Plan for Typhoon Prevention of Ships (General) compiled by me for reference only. Welcome to reading.

Part I: Emergency Plan for Ship Typhoon Prevention (General) 1.0 Purpose

Through the establishment of this emergency plan, we will ensure that all emergency preparations are made before the sandstorm weather comes in spring and autumn, and the corresponding emergency treatment measures will be started when the sandstorm comes, so as to ensure the safety of property facilities and the cleanliness of the environment.

2.0 scope

It is suitable for emergency preparation and emergency treatment of sandstorm weather in spring and autumn.

3.0 responsibility

3. 1 The cleaning supervisor is responsible for checking the planning and implementation of the emergency plan for sandstorm weather;

3.2 The equipment supervisor is responsible for arranging engineering personnel to inspect and reinforce outdoor facilities and equipment;

3.3 The cleaning foreman is responsible for organizing emergency personnel and supervising the implementation of emergency measures;

3.4 The cleaner is responsible for implementing emergency measures according to this plan.

4.0 treatment plan

4. 1 emergency preparedness

4. 1. 1 Before the sandstorm season (June 10 to May of the following year) comes, the management office should prepare windproof cloth bags (strips filled with sawdust) and ensure that they can be taken away at any time;

4. 1.2 The equipment supervisor shall arrange personnel to check the integrity of doors and windows outside the public area of the building and repair the doors and windows that are not closed or damaged; Check outdoor light boxes, signs and other facilities and make necessary reinforcement;

4. 1.3 The cleaning supervisor pays attention to collecting the 36-hour weather forecast of Beijing Meteorological Observatory every day, and once he receives the gale forecast of magnitude 4 or above, he will inform the management office manager as soon as possible to prepare for sandstorm prevention;

4. 1.4 the management office can post the gale forecast on the bulletin board in advance to remind the operators to close the doors and windows to prevent losses caused by sandstorms.

4.2 Emergency measures for gale and sandstorm.

4.2. 1 Before the strong wind and sandstorm come, the regional cleaning staff and the floor patrol security guards should check the doors and windows of the public corridor on the floor in advance and close them in time to prevent the strong wind from blowing into the building, causing dust on the floor or broken glass;

4.2.2 Wind-proof cloth bags shall be laid under the glass doors and shutter doors at the entrance and exit;

4.2.3 Traffic signs and other movable signs placed on the periphery should be placed in sheltered places or put down in appropriate positions to avoid the damage or injury caused by strong winds to pedestrians and vehicles;

4.2.4 Peripheral facilities, such as access control facilities outside the lobby, parking meters, etc., should be covered to prevent dust from invading;

4.2.5 Put the green plants outdoors and try to move them indoors;

4.2.6 Prompt the operator to check and close the outer doors and windows, and remove the articles placed in high places near the outer windows.

4.2.7 When the strong wind comes, the glass door in the lobby will open inward to avoid breaking the glass due to the strong wind;

4.2.8 Check the surrounding light boxes, signs and tall green plants at any time, and carry out temporary reinforcement when necessary;

4.2.9 Clean the lobby and indoor public areas at any time to remove dust;

4.2. 10 Pay attention to falling objects when working around buildings.

4.3 Cleaning measures after strong winds and sandstorms

4.3. 1 thoroughly remove indoor and outdoor dust;

4.3.2 Peripheral cleaning personnel should pay attention to cleaning the fallen leaves and sundries in the nest wind area;

4.3.3 The removed or put down signs shall be erected or restored to their original positions;

4.3.4 Remove the covering of outdoor facilities;

4.3.5 The green plants placed outdoors are restored to their original positions;

4.3.6 Fixed signs, signs and other outdoor facilities should be scrubbed and dusted.

5.0 related documents

6.0 Work record

Chapter II: Emergency Plan for Typhoon Prevention of Ships (General) In order to ensure the safety work in strong wind, rain, snow and bad weather and ensure the safe and smooth progress of education and teaching. Strengthen the safe use of floors and campus roads in windy, rainy and snowy weather, make emergency preparations, dispatch quickly and put out fires safely and effectively in case of accidents, strive to eliminate accidents at the initial stage, minimize accident losses, and protect the personal safety and property safety of teachers and students. The emergency plan for windy, rainy and snowy weather accidents is specially formulated.

First, the accident emergency organization

1, organization

Team leader: xx

Deputy leader: xx

Member: xx

2, the office is located in the safeguard section office.

3, sudden accident, all personnel immediately into the accident rescue organization, accident fighting and rescue work.

Second, the overall requirements of accident emergency work

1, firmly establish the safety responsibility consciousness of "prevention is better than disaster relief" and "responsibility is more important than Mount Tai". Make emergency preparations for accidents. Once an accident occurs, it is necessary to make a decisive decision, make a reasonable plan, command properly, communicate smoothly, contact in time, have a clear division of responsibilities, coordinate properly, and put out the fire safely.

2. In the event of an accident, the emergency organization leading group should command at the scene at the first time.

Third, the division of responsibilities

1, responsibilities of team leader:

Be fully responsible for the command of accident fighting and rescue.

2, deputy team leader responsibilities:

Be responsible for organizing the accident emergency team, carrying out reasonable division of labor, and reducing the accident to the lowest point.

3. Responsibilities of team members:

Immediately enter the accident rescue team, and under the command of the accident emergency team, carry out on-site rescue work according to the on-site situation.

Four, the principle of emergency rescue and rescue and rescue procedures

1. Assign a special person to call the police (1 10) and the emergency ambulance (120) and call the rescue vehicle. The emergency work of the accident began immediately.

2. In accident rescue, we should follow the principles of "saving lives is more important than disaster relief", "control first, then damage" and "focus first, then general", so as to rescue accidents quickly and minimize casualties and property losses.

3, the accident emergency team on-site command accident rescue work.

According to the accident investigation and handling procedures, we will investigate and handle the accident jointly with relevant departments and accident handling supervision departments, find out the reasons, sum up the lessons, and formulate corresponding preventive measures to prevent such accidents from happening again.

Chapter III: Emergency Plan for Typhoon Prevention of Ships (General Provisions) In order to reduce the losses caused by natural disasters, prevent the occurrence of major unexpected dangers, and ensure the safety of life and property of enterprises and employees, a typhoon prevention and flood control working group is specially established:

(1) Organizational structure and responsibilities

1. Chief Commander: The general manager of the company is mainly responsible for the personnel arrangement of typhoon prevention and flood control organizations and the overall arrangement of typhoon prevention and flood control work;

2. Team leader of typhoon prevention and flood control: the person in charge of the comprehensive office is fully responsible for typhoon prevention and flood control during typhoon prevention and flood control, timely adjust personnel and materials as needed, and inform the commander-in-chief and the competent government departments within 24 hours;

3. Members of typhoon prevention and flood control team: obey the arrangement of the leader of typhoon prevention and flood control team and do a good job of typhoon prevention and flood control under the leadership of the operation chief;

4. Logistics support: responsible for logistics support during typhoon prevention and flood control, and organizing personnel to evacuate safely in case of emergency; During typhoon prevention and flood control, as a temporary command center, it is responsible for external communication with government departments and supervisors to ensure timely and accurate information transmission;

5. Power group: responsible for normal power supply and power generation at any time during typhoons and flood control;

6. Equipment group: responsible for the normal operation of all typhoon and flood prevention equipment, and also responsible for the maintenance of factories and other places in urgent need;

(2) Hazard identification and risk.

Whenever the typhoon flood season comes, according to the forecast of the meteorological department, determine the emergency response level of the enterprise in time:

1, yellow warning (mild): typhoons below magnitude 6 can operate normally;

2. Red warning (moderate): For typhoons with magnitude above 6 and magnitude below 8, the leaders of all departments are on duty, and the warehouse organizes some personnel to participate in emergency disaster prevention;

3. Black early warning (height): In case of typhoon of magnitude 8 or above, the company will stop operation and fix various equipment and facilities. Irrelevant personnel should be evacuated from the site, and leaders at all levels should take the lead in participating. It is necessary to organize all personnel to cooperate closely under the leadership of the commander-in-chief and go all out to prevent typhoon and flood control;

4. Key prevention parts of the enterprise: staff quarters, various areas of the company, various types of equipment, high-voltage distribution room, office, financial room, etc.

(3) Conditions for starting the emergency plan

1, all employees of the enterprise have the right and obligation to report to the enterprise leaders as soon as they know that the disaster weather is coming;

2. Team leader of typhoon prevention and flood control: according to the actual situation, announce the level of emergency plan, confirm personnel, do a good job in typhoon prevention and flood control, and report the progress to the commander-in-chief at any time;

3. Under the unified arrangement of the team leader, typhoon prevention and flood control work should closely cooperate, support each other, communicate information in time, and report directly to the general manager in case of special circumstances;

(4) Emergency equipment and facilities

1. Emergency Command Center: During typhoon and flood prevention, it is guaranteed that someone will be on duty 24 hours a day, and communication is convenient, with 4 walkie-talkies;

2. The power distribution room, materials and electric power departments are on duty 24 hours a day to ensure power supply. Materials are equipped with shovels, pumps, raincoats, flashlights, sandbags, etc. , easy to use. In addition, there are many cars and trucks, which can be called at any time when needed;

3. For special emergencies, you can ask for help from the local 1 10 or 120;

(5) Emergency skills and resources

1. The emergency command center is close to the company's production office area, with fast and convenient information transmission and high management efficiency;

2. Once the rainstorm comes, the post managers are instructed to send typhoon prevention and flood prevention materials to key parts quickly and timely, and make preparations for disaster prevention in advance;

3. During typhoon prevention and flood control, all communication equipment will be turned on 24 hours, and the telephone lines of the command center and warehouse will be connected directly, and all instructions will be understood at any time and stand by at any time;

(6) Protective measures

1. During typhoon prevention and flood control, security personnel will be mainly responsible for the security work of important parts of enterprises such as the finance department and organize personnel to evacuate safely in time;

2. The logistics department is mainly responsible for the evacuation of temporary places to ensure the normal supply of food;

(VII) Information release and employee education

1, according to the actual situation of each stage, the typhoon prevention and flood control team leader will release relevant information in various forms through normal channels with the consent of the chief commander;

2. We should increase awareness of prevention in publicity and education at ordinary times. When we enter the pre-plan state, all the work will be carried out under the unified command of the typhoon prevention and flood control team leader;

3. According to the weather forecast data, employees are required to avoid passing through the tuyere on their way to and from work.

(eight) targeted training and drills.

1. Every year from July to September, all employees of the company are mobilized and the front-line employees of the company are trained. Training subjects include: sandbag, generator test, material dispatching, emergency repair, equipment protection, personnel rescue, security and so on;

2. In order to consolidate the training results and enhance employees' awareness of typhoon prevention and flood control, organize employees to conduct drills before the flood season every year to improve the comprehensive ability and team spirit of typhoon prevention and flood control in enterprises;

(nine) the method of continuous improvement of emergency plan

The team leader of typhoon prevention and flood control should record the drill site of each employee and correct the underestimation in time.