Job Recruitment Website - Property management - Responsibility book for decoration safety

Responsibility book for decoration safety

Responsibility Letter for Decoration Safety (8 selected articles)

In today's social life, more and more places need to use the responsibility book. The responsibility book is a document that explains the responsibility and clearly defines the tasks that should be undertaken. What kind of responsibility is effective? The following is my responsibility book for decoration safety (8 selected articles). Welcome to read the collection.

Decoration Safety Responsibility Letter 1 In order to ensure the safety of public facilities and construction in the market management area, and maintain the market order of Xinyang International Mall, this construction unit strictly abides by the following provisions when decorating shops for xx tenants:

First, conscientiously implement the national, provincial and municipal departments in charge of labor protection and production safety issued by the safety production and fire control policies, and strictly implement labor protection laws, regulations, rules and regulations.

Second, be responsible for on-site safety education for construction personnel, urge construction personnel to abide by construction safety operation procedures, take necessary safety protection and fire control measures according to regulations, and be responsible for daily safety inspection and supervision.

3. Work in strict accordance with the renovation plan declared to the management company, and consciously accept the inspection of the renovation process by the management company.

Four, in the process of decoration construction, strictly abide by the management company's various safety and fire management systems (in the process of decoration, the selected materials must meet the requirements of fire control, fire control facilities shall not be buried or blocked, fire exits shall not be blocked, and fire-fighting equipment such as fire boxes and fire extinguishers shall not be moved at will. The light box should be painted with fireproof paint twice, and the lighting should be insulated around it. All lines must wear protective tubes as required, and the connectors must have junction boxes to prevent the exposed conductor connectors. Lines must be connected, and 2 is required. Single-stranded copper-core flame-retardant wire with an area of more than 5 square meters must adopt qualified products with relevant national quality certification. Fluorescent lamp adopts inductive ballast lamp holder with fully enclosed metal shell, and spotlights adopt 12V low voltage and explosion-proof glass protection. If there is any violation, I am willing to bear all the consequences arising therefrom.

Five, the construction site to ensure that no water, no littering, no littering, no wiring; The decoration site does not use liquefied gas tanks, do not stay overnight, and is equipped with fire extinguishers. If the operation management company violates the rules, it can withdraw the offender's pass and cancel its construction qualification.

Six, during the period of construction to keep the venue public facilities clean and in good condition, if there is any damage, should compensate for the losses at the price, if the circumstances are serious, shall be investigated for responsibility.

Seven, strictly implement the system of fire prevention and explosion prevention, flammable and explosive articles are not allowed indoors, and smoking and open flames are not allowed at the scene when carpentry and painting work. Electric furnaces and iodine tungsten lamp are strictly prohibited. Before using naked flame in electric welding and gas cutting, an application for using naked flame must be submitted to the management office, and protective measures must be taken after approval. In violation of regulations, 200 yuan will be fined every time.

Eight, due to the decoration construction caused by pipeline blockage, water leakage, water leakage and other accidents, by the construction party is responsible for the repair, and as the case may be necessary compensation.

Nine, in the decoration activities are strictly prohibited to affect the building structure and use safety behavior.

Ten, prohibit the use of building decoration materials and facilities explicitly eliminated by the state.

If there is any violation of the above provisions, the construction unit and the merchants are willing to accept the handling of the management company and bear all responsibilities.

Person in charge:

Date:

2 Party A's Responsibility Letter for Decoration Safety:

Party B:

1. Permit to enter the site: The decoration construction project contracted by Party B must be approved by Party A and signed with this responsibility letter before entering the site, otherwise Party A has the right to prohibit Party B from entering the site.

2, construction personnel management:

1. Party B's project manager (on-site person in charge) is responsible for the management of the construction site, and is responsible for coordinating with Party A the problems arising from the implementation of this responsibility letter.

B. Party B must promise that its construction personnel are not suspected of criminal cases and provide complete identity documents, otherwise Party A has the right to detain the suspects and hand them over to the public security organs for handling.

C, in the construction personnel must handle the relevant documents in accordance with the provisions of the store management.

D. When Party B's construction personnel enter or leave the shopping mall, they should take the initiative to show their "Pass" and submit it to the doorpost for inspection and registration. During the construction period, they must wear a "construction permit" to be inspected by security personnel.

E. Party B's construction personnel shall not use, lend, alter or damage the construction documents, and shall not use expired documents. Once found, Party A has the right to confiscate the certificate and persuade it to leave the mall. If the certificate is lost, it must be reissued.

F, Party B's construction personnel must go through the designated passage when entering or leaving the mall, and shall not damage the public facilities of the mall.

G, every day within the specified time after the construction, construction personnel should immediately leave the scene, shall not stay without reason, shall not engage in activities unrelated to the construction content.

3. Construction time management: In order to specify the construction time, it shall be agreed separately in case of special circumstances. In case of violation of the construction time, Party A has the right to request to stop work and impose a fine of 50-500 yuan.

4, the construction site management:

A. Party B shall hang or post the decoration construction permit issued by the property department in a prominent position on the construction site. This permit shall be uniformly handled by Party A, and the validity period shall be subject to the construction period. If it is necessary to extend the construction period, it can be handled at Party A's place.

B. Party B must adhere to the "safety first, prevention first" construction site safety management policy, strictly abide by the operating rules and technical specifications, and implement safety measures in accordance with the relevant national regulations on construction safety management.

C. Party B's work in various types of work on the construction site must conform to the contents of the agreement signed with the shopping mall and Party A; If there is any violation, Party A has the right to order to stop work. Before construction, Party B shall make a commitment to the store and Party A to protect the finished products of the equipment and facilities in the store, and take effective measures to protect the goods in the store; If it is lost or damaged, it shall report it to the mall and Party A in time, and bear the liability for compensation.

D, Party B's construction area should be closed and managed, and enclosed by boards according to the requirements of shopping malls, which shall not affect the overall image of surrounding shops and shopping malls; After all construction equipment enters the site, the construction unit is responsible for keeping it, and Party A is not responsible for any loss or damage.

E. Before Party B's construction personnel leave the site, they shall cooperate with Party A to carry out internal facilities safety inspection, and after confirmation, all Party B's own facilities shall be evacuated from the construction area.

F without party a's permission, party b shall not use the hydropower facilities outside the construction site, and shall not store construction equipment or engineering garbage outside the construction site.

G. Party A has the right to require Party B or its affiliated construction personnel to pay a penalty of 50-500 yuan until it is ordered to stop work.

5, to carry out things management:

A. All articles carried by Party B's construction personnel and vehicles must be declared to Party A by the person in charge of the construction site, and Party A can only release them after going through the formalities of carrying articles out in the shopping mall.

B, the applicant shall not falsely report the articles carried, and shall not fraudulently use or alter the approval form; It comes into effect as of the date of issuance by Party A. Party A has the right to require Party B or its personnel to pay a fine of 50-500 yuan for violating the regulations on carrying articles out, and at the same time temporarily detain the unknown articles and investigate them.

6, fire safety management:

For details, please refer to the fire safety management responsibility letter signed by Party A and Party B separately.

7, accident responsibility

Party B promises to strictly implement the Regulations on the Supervision and Administration of Construction Safety Production and the relevant provisions of the responsibility book, resolutely implement the construction safety management, ensure that the production is in the best safety state, and ensure that serious casualties, equipment fires and other safety accidents are eliminated during the construction process. If all safety accidents are caused by Party B or Party B's staff, and the responsibilities shall be borne by Party B, Party A will report to the competent fire department for legal responsibility.

Matters not mentioned above shall be settled by both parties through consultation in accordance with national laws and regulations.

Person in charge:

Date:

Decoration Safety Responsibility Letter 3 Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

According to the requirements of relevant national safety laws and regulations, combined with the actual situation of our company, we will conscientiously implement the "6 1" instruction, implement the policy of "safety first, prevention first" and the principles of "who is in charge, who is responsible" and "safety must be paid attention to in production", and implement the safety responsibility system. In order to ensure construction safety and prevent accidents, Party A and Party B must perform the following clauses:

1. Party A fully cooperates with the safety and security work of this project, and at the same time supervises and inspects the safety and security work of Party B, and has the right to require Party B to rectify the' violations, behaviors and potential safety hazards' found in the inspection.

2. Party A shall, according to the requirements of the company, notify Party B of the problems found in the inspection in writing and file them for future reference.

3. Party A has the right to punish Party B's "three violations" according to relevant management measures.

4. Party A shall report the safety management of the decoration project to the company in time.

5. Party B must have a clear legal person in charge of safety, who is responsible for the safety and public order of the construction project, so as to achieve "five simultaneities" of construction and safety.

6. Before entering the construction site, Party B must register and pass for the construction personnel, and designate a special person to do the inspection. Unlicensed persons are not allowed to enter the construction site.

7. Before Party B takes up his post, he must be responsible for the safety education of construction personnel, make clear the relevant safety regulations and work requirements, and consciously abide by the safety management system.

8. Party B must be equipped with full-time or part-time security personnel during the construction period, specifically responsible for the implementation of safety and public security precautions during the construction period.

9. The inflammable, explosive and dangerous goods used by Party B in the construction must be restricted, and a special person shall be appointed to take charge of safety management.

10. When Party B uses fire, electricity and welding in the construction, it must be approved by the person in charge of Party B's site, and strictly implement the technical specifications and operating procedures of fire, electricity and welding to ensure foolproof. (Oxygen cylinders and acetylene cylinders shall not be inverted, with damping rings, and their number shall be strictly controlled. The spacing is greater than 5m, and the distance between the open flame and the acetylene bottle must be greater than 10m.

There is a special person to remove flammable materials, put a fire extinguisher on site, leave a special person on duty after welding, and leave after confirming that there is no problem)

1 1. Party B's electricians and electric (gas) welders must hold a valid Operation Certificate for Special Industry Personnel issued by the labor department before they can operate according to the requirements of construction site specifications.

12. Party B must carry out the construction in strict accordance with the national safety construction standards for building decoration industry and resolutely put an end to "three violations".

13. When Party B uses large-scale equipment in construction, it must fully consider the bearing capacity and seismic capacity of the floor, and can only use it on the premise of ensuring safety. It is strictly forbidden to command and take risks in violation of regulations.

14. Party B must set up a safety net for dangerous holes (access openings, elevator openings, reserved openings, stairs, etc.). ) construction, and fasten the safety rope for aerial work.

15. Smoking, using naked flames, leaving behind construction workers and using electric water heaters are strictly prohibited in the decoration area.

16, it is forbidden to pile up a large amount of waste for a long time in the construction area, block the evacuation passage, and insist on cleaning it up once a day, especially the empty bottles such as glass glue and paint should be properly handled.

17. Party B must strictly manage the construction site, and the equipment, equipment, tools and materials on the construction site must be managed by special personnel.

18. Party B must equip the construction site with fire-fighting equipment that meets the specifications and standards to ensure the safety of the whole construction process.

19. If Party B neglects safety management or violates the provisions of the contract, resulting in accidents and cases, Party B shall bear all the responsibilities, and all the economic losses and political impacts brought to Party A therefrom shall be borne by Party B. ..

20. This responsibility shall come into effect as of the date of signing, and shall become invalid after the project is accepted, in duplicate, one for the owner and one for the construction unit.

Person in charge:

Date:

Decoration safety responsibility book 4 In order to standardize the management of decoration construction, straighten out the safety and behavior of decoration site construction, distinguish the liability for breach of contract in decoration construction, and ensure the safety and order of personnel, property and vehicles in the area, the decoration unit shall abide by the following relevant provisions:

1, the decoration construction personnel wear the pass to enter and leave the decoration site, and the construction personnel are not allowed to stay overnight, and the decoration materials and garbage must be transported according to the regulations, and the decoration garbage must be bagged.

2. It is forbidden to use decoration materials that do not meet the fire protection requirements; And according to the types and characteristics of decorative materials, classified storage, designated custody.

3. During the decoration, the decoration unit must be equipped with more than two dry powder fire extinguishers to do a good job in fire safety; Smoking and cooking are prohibited indoors. Once found, cancel the qualification of decoration personnel.

4. It is forbidden to pile up decoration materials and garbage in public venues. Pay attention to close the doors and windows of the decoration unit and carry out the construction within the time specified by the management office.

5, interior decoration engineering shall not involve public facilities, public space; It is strictly prohibited to conduct welding, painting and other acts that hinder public safety in public places.

6, shall not be arbitrarily planing, banging on the roof, internal and external walls and smoke exhaust pipes, shall not be allowed to wear pipe directly buried wires or reroute, water meters, power distribution cabinets, fire control facilities without application to prohibit unauthorized changes.

7. It is strictly forbidden to change or damage the bearing structure, seismic structure, main water supply and drainage pipes, fire-fighting facilities, air-conditioning facilities, elevators, smoke exhaust pipes, roof waterproofing, external walls, stairwells, public passages, hallways, ceilings, roofs and other public facilities of the original house.

8, shall not change or damage the structure of the original house and the use function of supporting facilities in the house; Do a good job in gas, water, electricity and other safety protection measures for indoor supporting facilities such as toilets, kitchens, air-conditioned rooms and power distribution rooms.

9, bathroom, balcony, kitchen decoration, waterproof processing must be done, ceiling parts should be reserved for inspection structure, easy to check and maintenance in the future.

10, it is forbidden to punch holes in load-bearing walls, beams and columns, and dismantle walls, doors and windows connecting balconies; Inappropriately increase the static load of the floor, including building red brick walls indoors, overloading the ceiling, and laying marble and marble on a large area of the ground.

1 1. During the renovation, it is strictly forbidden to interfere with or damage the interests of neighboring owners, and the responsible unit shall be responsible for the compensation for the losses caused.

12. Construction personnel and decoration materials enter the underground garage in a unified way. When the construction unit uses the elevator to transport materials, tools and equipment, etc. , you must carry articles according to the requirements put forward by elevator management personnel or relevant management regulations. If it affects the elevator, preventive and protective measures must be taken in advance, otherwise the elevator manager has the right to refuse to use the elevator.

13, the renovation of the unit must be completed within three months from the date of commencement.

14, it is forbidden to use rainwater pipes to discharge domestic sewage; Do not open the water supply and drainage pipes, fire-fighting pipes and air-conditioning pipes without authorization; All main pipelines are not allowed to be wrapped with decoration materials during decoration. If it is inevitable, an inspection port should be left to facilitate future maintenance and management.

15. During the renovation, it is forbidden to open holes in the ventilation shaft without authorization to change its building structure.

16. During the renovation, the original design position and width of the main entrance of the unit shall not be changed.

17, it is forbidden to destroy the external wall of the main building; It is forbidden to change the architectural function of the balcony. It is forbidden to close the balcony of high-rise residential buildings, change the size or color of windows, install air-conditioning outdoor units in a unified position on the external walls, and install safety nets in accordance with the regulations and requirements of property companies.

18, decoration time: Monday to Friday, construction time: 8: 30 am-12: 00 am; Afternoon14: 00—18: 30; Saturday and Sunday are rest days, and construction is prohibited. If necessary, the management office can adjust the decoration operation time according to the actual situation of decoration.

19, the contents not included above shall be constructed according to the audit opinions of the management office, and the decoration construction personnel must obey the daily management of the staff of the property management company and abide by various management regulations.

Person in charge:

Date:

5 Party A's Responsibility Letter for Decoration Safety:

Party B:

Hereinafter referred to as Party A and Party B.

1. Party B shall sign a letter of responsibility for construction safety with Party A before the start of the construction contract of this year's single home improvement project.

2, (construction safety responsibility) is valid for five years after the completion of the last single project this year. Automatic termination after the warranty period ends.

3. If Party B leaves his post during the warranty period, Party B shall be responsible for the expenses related to safety accidents during the warranty period of the single home improvement project contracted by him during his employment.

4. After receiving the project dispatch from Party A, Party B shall carefully make the progress plan, construction personnel arrangement, construction material plan, construction safety production protection measures and supplies. Determine the person in charge of site construction safety.

5. Party B must provide the construction personnel under its management with machines and tools, protective equipment and a safe construction environment that meet the safety production standards. If it is not provided, all safety accidents shall be borne by Party B..

6. Party B shall regularly educate its construction personnel, including safety education, law-abiding education and professional ethics education.

7. Party B must put an end to illegal operations in construction, such as live wiring, changing water supply to waterway construction, etc. Smoking or using open flames at the scene. If a safety accident is caused by the illegal construction of the workers managed by Party B, Party B shall bear all the responsibilities.

8. Party A has the right to impose compulsory management and punishment on Party B's illegal operation during construction. Party B unconditionally accepts the management and punishment of Party A. ..

9. The management personnel of Party B shall abide by the management regulations of Party A and strive to improve their personal management level and professional ethics.

10. All construction personnel of Party B shall register with Party A for the record.

1 1. All construction personnel of Party B shall solve the safety accidents on the way to the construction site or from the construction site to other places by themselves.

12. Party B's construction management personnel (project manager, contract manager) and all construction personnel shall abide by the law and shall not endanger social order or damage public property.

13. If social losses are caused by Party B's poor management, Party B shall solve them by itself; Violation of laws and regulations shall be handled by law enforcement departments.

14. In case of social disputes caused by Party B, Party A only provides mediation and help.

15. If social disputes are caused by Party B's construction, but Party B cannot solve them in time, Party A has the right to use Party B's quality deposit as compensation funds for customers.

16. In case of accident or personal injury, Party B must actively rescue the wounded, protect the site, report to the engineering management department of Party A as soon as possible, and obey the arrangement and treatment of Party A.. If Party B intentionally conceals the accident and fails to report it, Party A will pay a fine of 654.38 yuan+0,000 yuan to 50,000 yuan.

17. This responsibility letter shall come into effect as of the date of signature by both parties. In duplicate, each party holds one copy.

Person in charge:

Date:

Decoration safety responsibility book 6 1. When residents decorate, all kinds of personnel in the construction team must obey the unified management of the management office.

Second, the owner and the construction team need to read the Decoration Management Regulations and the Shenzhen Family Room Decoration Management Regulations in detail and strictly abide by them.

Three, such as pipeline blockage, water supply and drainage pipeline cracks, floor seepage, power failure, damage to other people's items, etc. Due to the decoration construction, the decoration team and the owner are responsible for repair and compensation.

4. In the process of decoration, if the electric tools used by the construction team are short-circuited, the construction team shall pay a certain fine in addition to the responsibility of repair.

5. During decoration construction, if the floor slab is chipped and the cement layer is damaged, the ceiling plastering of others falls off and is damaged, and the waterproof layer of kitchen and bathroom is damaged and leaks. , decoration households and decoration construction team should take the initiative to negotiate with the damaged households for maintenance and compensation until repair.

Six, decoration construction, the waterproof layer of the kitchen and bathroom must be constructed by a waterproof construction team with professional qualifications. After the waterproof layer is completed, the next working procedure can be carried out. Otherwise, the decoration deposit of the construction team will be delayed until the management office confirms that there is no leakage.

Seven, decoration households and decoration construction team do not decorate according to regulations, and do not use electricity, water, gas and fire according to regulations. All adverse consequences shall be borne by the decoration households and the decoration construction team.

Eight, decoration construction group in the balcony construction and handling materials from the fire stairs, safety protection measures must be taken, it is forbidden to decorate objects falling downstairs from the balcony or stairs, if casualties, the consequences shall be the responsibility of the construction group.

Nine, after the completion of the home decoration project, it must be accepted by management professionals. In case of illegal decoration and leakage, leakage, blockage, damage and other phenomena, decoration households and decoration teams will bear the maintenance and compensation costs.

Ten, for illegal decoration and refused to accept illegal treatment of the construction team management office has the right to cancel its construction qualification in the community.

Eleven, during the decoration, the decoration unit is responsible for indoor fire safety and fire accidents caused by decoration.

Twelve, such as decoration personnel damage to public facilities and equipment, by its subordinate construction group ad valorem compensation.

Thirteen, decoration construction team should strictly restrain the construction personnel. If there is a dispute or fight between the illegal building and the security guard of the management office, the construction team will take full responsibility.

14. When the decorator entrusts a professional company or a decoration team to install air conditioners, safety protection measures should be taken. In the event of an accident, the decorator and the air-conditioning installation unit should bear the relevant responsibilities.

15. The owner has the obligation to supervise the construction team he employs. If the construction team hired by it cannot perform, the owner shall be responsible for coordinating and solving the maintenance and compensation expenses caused by illegal decoration.

Decoration workers and construction teams are requested to read this agreement carefully, and it will take effect after being signed by all parties, and it will be strictly implemented.

Person in charge:

Date:

Responsibility Letter for Decoration Safety 7 In order to fully implement the Construction Law of People's Republic of China (PRC), the Law on Safety in Production, the Regulations on Safety in Production of Construction Projects and various safety production management regulations of the municipal and district governments, all branches and project departments must conscientiously implement the Inspection Standard for Building Construction Safety JGJ 59-99 and relevant regulations of the municipal and district governments to ensure the smooth completion of various safety production indicators. Therefore,

First, the assessment indicators:

1, and the accident rate of minor injuries shall be controlled below five thousandths;

2. Number of serious injuries and deaths: 0;

3. Number of fire accidents: 0;

4. Number of explosion accidents: 0;

(Including: boilers, pressure publicity materials, gas cylinders)

5, civilized construction qualified, strive for the city, district civilized construction site.

Second, the safety measures:

1, adhere to the principle of "who is in charge, who is responsible", and sign letters of responsibility layer by layer according to the requirements of our company's program documents, forming a new situation of "everyone cares about safety, pays attention to safety in everything, and does everything possible to ensure safety".

2. Adhere to the system of regular meetings on production safety, and each responsible person shall hold a meeting on production safety at least once every quarter, so as to be prepared before the meeting, targeted and recorded after the meeting.

3. Seriously implement the training of leaders and safety management personnel at all levels and the training of special commissioners. Strengthen the entry education and pre-shift education of subordinate construction teams.

4. Intensify safety inspection, and carry out its own dynamic inspection and rectification of safety production in a planned and targeted manner while completing the inspection tasks uniformly deployed by superior departments and companies.

5. Establish a safety management system on the construction site, and equip full-time safety management personnel according to regulations. The agent must hold relevant certificates.

6, gradually increase investment in production safety, standardize the use of power distribution facilities, safety protection equipment and the upgrading of old and new equipment.

7, according to the requirements of the municipal government, the municipal construction committee civilized construction standards, earnestly do a good job in the specific work of civilized construction, truly realize the blue sky project civilized construction site.

8. The person in charge shall fulfill the due diligence obligation of production safety and assume the responsibility for production safety.

Person in charge:

Date:

Decoration safety responsibility book 8 In order to strengthen the work of safety production, decompose the work objectives of safety production layer by layer, and form a situation of top-down assessment and bottom-up responsibility step by step, our company has specially signed a safety production responsibility book with the project department.

I. Term of responsibility

From August of 12 to the date when the project is officially delivered for production.

Second, the work objectives

(a) to ensure that no serious injuries or personal injuries occur, and strive to achieve the goal of zero minor injuries.

(2) Control personal injury and general construction accidents, and control the accident frequency within 1‰.

(three) no major or above construction safety accidents.

(4) No major or above fire accidents;

(five) no major and above traffic accidents;

(6) Establish a normal management mechanism for civilized construction, horizontally to the edge and vertically to the end, leaving no dead ends.

(seven) to establish and improve the safety production organization system and safety production work system as the focus, and implement the responsibility system for safety production; Focus on observing rules and discipline and opposing habitual violations, emphasizing "people-oriented" and safety culture education; Take implementation as the main line, strengthen the investigation and management of hidden dangers of accidents, continuously improve the level of safety management, and realize the transformation from passive preventive management to source control management, and from the consciousness of "want me to be safe" to the consciousness of "want me to be safe" of construction workers.

(eight) the daily safety management qualified rate reached 100%.

(9) Abide by the rules and regulations, and there will be no "three violations" (illegal operation, illegal command and violation of labor discipline).

Three. Rights and responsibilities of both parties

(I) Project Department

1. Provide a good occupational health and safety working environment for the responsible person in strict accordance with the Law on Work Safety and other relevant safety regulations.

2, in the work, the project department has the obligation to carry out specific business guidance, safeguard the legitimate rights and interests of those responsible.

3. The project department has the responsibility to coordinate and urge relevant departments to solve the hidden dangers of safety accidents that those responsible are really unable to rectify.

(II) Person in charge (civil construction unit: Nanjing Construction Engineering Group Co., Ltd.)

1。 Strictly abide by the owner, management company, supervision company, company and project department's safety production rules and regulations, operating procedures, and obey management.

2。 Equip employees with labor protection articles that meet national standards or industry standards, and regularly educate, inspect and guide the provision and use of labor protection articles.

3。 Seriously implement the safety production responsibilities stipulated in the company's safety production responsibility system; Earnestly carry out all work tasks related to safety production in this position.

4。 Actively carry out safety production knowledge education and training, so that employees can master the necessary safety production knowledge and emergency ability, improve safety quality, and achieve "four no injuries" (I don't hurt myself, I don't hurt others, I don't get hurt by others, and I protect others from harm).

5。 Have the right to criticize, report and accuse the problems existing in the work of production safety; Have the right to refuse illegal command and force risky operations.

6。 If hidden dangers of accidents or other unsafe factors are found, they shall immediately report to the relevant personnel; We should actively take effective measures to rectify the potential safety hazards existing in this unit.

7, to ensure that the civil construction site safety facilities meet the needs of construction safety, civilized construction standards.

8. Ensure that the special safety measures are earmarked and fully invested and put in place.

Fourth, evaluation

(1) During the responsibility period, the person in charge of the project department shall assess the completion of the safety production target of the responsible person before 25th of each month.

(2) The reward and punishment measures after the target is completed shall be implemented in accordance with the reward and punishment regulations for safe and civilized construction of the project department and the company and the safety construction agreement.

(3) Accidents caused by irresistible natural disasters shall not be assessed.

Verb (abbreviation for verb) Other matters

(1) This Responsibility Letter shall come into effect after being signed (sealed) by both parties.

(II) In case of dispute between the two parties who signed this letter of responsibility, if negotiation fails, they may apply to the safety production team of the project department for arbitration until the safety production department of the company arbitrates.

(3) This responsibility book is made in triplicate, one for the person in charge of the project department, the person in charge of the construction unit and the safety and quality department.

Person in charge:

Date:

;